TenderAxiom

TenderAxiom · Opportunities

TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity: requirements and submission rules

34 requirements and 3 submission rules found in the solicitation documents for W91RUS27RA001. Use them as the start of your compliance matrix.

Solicitation number
W91RUS27RA001
Agency
DEPT OF DEFENSE / DEPT OF THE ARMY / AMC / ACC / ACC-CTRS / ACC-APG / W6QK ACC-APG CONTR CTR
NAICS
541512
Set-aside
Small Business Set Aside - Partial
Responses due
25 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • The Offeror shall provide a narrative response describing the Technical Approach, as described in Section 3 of this sample task.
  • The sample task response shall be accompanied by the documents detailed below.
  • The Offeror shall utilize the italics portion of this Sample Task as directions for writing of a description of their technical approaches for developing the required products.

Requirements

IDRequirement
R1ACCESS CONTROL PANEL(S) WILL BE INTERFACED WITH FIRE ALARM SYSTEM VIA DRY CONTACT TO RELEASE ELECTRONIC LOCKING HARDWARE, WHERE REQUIRED.
R2ACCESS CONTROL PANEL(S) WILL BE INTERFACED WITH NURSE CALL SYSTEM VIA DRY CONTACT TO INDICATE DOOR FORCED EVENTS, WHERE REQUIRED.
R3In response to this sample task, include a detailed technical approach describing how you will meet the requirements.
R4For this sample task the period of performance (PoP) will be 12 months as that is representative of USAISEC task orders.
R5The Offerors will use January 1, 2027 as a start date for this sample task.
R6The WBS shall include a minimum of a three-level breakdown and a BOE.
R7The BOE shall include the labor categories and hours required to complete the Sample Task as proposed and the rationale to support the labor estimates.
R8The BOE shall NOT include any labor rates or cost information inclusive of material, travel or other direct costs (ODCs).
R9The Quality Control Plan and the Risk Mitigation Plan are included within the Sample Task 30 page limitation.
R10The project shall include performing site surveys, developing a System Design Plan (SDP), an Engineering Installation Plan (EIP), a System Acceptance Test (SAT) Plan, and an Installation Schedule.
R11During this modernization effort all facilities will be fully operational 24 hours a day and 7 days a week. The HQ mission and operations are not to be interrupted;
R12The HQ facility will maintain continuous communications with deployed units using tactical and satellite networks;
R13The most current version of the following documents shall be used.
R14For details and information not provided the Offeror shall state assumptions.
R15A Contractor's Progress, Status, and Management Report, CDRL A001 (ATT011) will be required.
R16As part of this modernization effort, the following technologies are part of the requirements and shall be upgraded: Modernize the NIPRNET data networks in both the HQ and DRC facilities; Modernize and migrate all users off of the voice switch network to a Voice over Internet Protocol (VoIP) system in both the HQ and DRC facilities; Modernize the VTC system in both the HQ and DRC facilities; Set up a new wireless network to handle all communications in the executive operations conference room for all users.
R17The design will address the following: physical facilities; heating, ventilation, and air conditioning; electrical subsystems; grounding subsystems; data systems; voice systems; and visual information system.
R18Site surveys shall be conducted in order to identify all requirements for the HQ facility modernization.
R19A Site Survey Report, CDRL TS24 (ATT053) shall be delivered following completion of the site survey.
R20Describe your approach to performing site surveys, to include the types of information to be obtained during the survey including specific requirements for detailed work at overseas installations. Discuss your various considerations and your approach to completing the site survey report for this sample task.
R21Provide a System Design Plan (SDP), CDRL TS30 (ATT059) for the modernization of the required HQ complex information systems.
R22The SDP shall contain a systems analysis of current and future information systems for the HQ facility.
R23The SDP will address the network (data), voice, video (A/V), and the supporting requirements of the HQ information systems.
R24Describe your approach for developing the SDP to include data and voice classifications, video technologies and security engineering; describe the process for considering emerging technologies for this sample task.
R25Develop and deliver the Facility Wiring and Design Criteria (FWDC), CDRL TS08 (ATT61).
R26The FWDC will be provided for all modernized and new information systems.
R27Describe your approach for developing the FWDC for this sample task. The FWDC would be used by the integration team to modernize the information systems. Consider major aspects of the facility design; for example, cable signal requirements, heating, ventilation, and air conditioning, power, grounding, cable infrastructure, telecommunications closets, security, and building cabling.
R28Perform detailed engineering and develop and deliver the Engineering Installation Plan (EIP), CDRL TS25 (ATT054).
R29Describe your approach for engineering and documenting those engineering details in the EIP for this sample task. Consider the major parts of the EIP such as: the installation List of Materials (LOM); the major item LOM; test, measurement, and diagnostic equipment (TMDE); drawings; installation plan and installation instructions. Discuss the LOM acquisition strategy and procurement plan.
R30Develop and deliver the SAT Plan, CDRL TS27 (ATT056).
R31The SAT Plan, when executed, shall be capable of demonstrating that all system elements addressed by the SDP and EIP meet all operational and acceptance requirements.
R32Discuss your approach to produce this product.
R33Develop and deliver the Installation Schedule, CDRL TS28 (ATT056).
R34Describe your approach to developing the installation schedule for this sample task. A 12-month period for this installation effort will be considered for this sample task. Include project interdependencies, the inherent logistics issues, and potential impacts to this schedule. As part of the response, provide a brief example of the installation schedule.

Recent awards in NAICS 541512

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-11-24AEG GROUP INCDepartment of the Air Force · FY26 6434 UFR MSG CS AMW RADIO FLEET REPLACEMENT PHASE 11$96,234
2026-10-24AEG GROUP INCDepartment of the Air Force · FY26 6434 UFR MSG CS AMW RADIO FLEET REPLACEMENT PHASE 18$96,234
2026-10-24AEG GROUP INCDepartment of the Air Force · FY26 6434 UFR MSG CS AMW RADIO FLEET REPLACEMENT PHASE 17$96,234
2026-10-24AEG GROUP INCDepartment of the Air Force · FY26 6434 UFR MSG CS AMW RADIO FLEET REPLACEMENT PHASE 16$96,234
2026-10-24AEG GROUP INCDepartment of the Air Force · FY26 6434 UFR MSG CS AMW RADIO FLEET REPLACEMENT PHASE 14$96,234
2026-10-24AEG GROUP INCDepartment of the Air Force · FY26 6434 UFR MSG CS AMW RADIO FLEET REPLACEMENT PHASE 13$96,234

Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.