Elevator Repair and Maintenance Support Services: requirements and submission rules

24 requirements and 6 submission rules found in the solicitation documents for W91RUS-27-R-A002. Use them as the start of your compliance matrix.

Solicitation number
W91RUS-27-R-A002
Agency
DEPT OF DEFENSE / DEPT OF THE ARMY / AMC / ACC / ACC-CTRS / ACC-APG / W6QK ACC-APG CONTR CTR
NAICS
811310
Set-aside
Small Business Set Aside - Total
Responses due
08 January 2027 (41 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Proposal Request Issue Date 30 October 2026 Questions Due Date and Time 11 December 2026, 10:00 AM Mountain Time Proposal Closing Date and Time 08 January 2027, 10:00 AM Mountain Time Period of Performance Please see below Contract Specialist Thomas Carpenter thomas.l.carpenter.civ@army.
  • Signature block of your security manager or office manager on a company letterhead (3) Contractors using the Visit Authorization Letter must submit them through their responsible Facility Security Officer (FSO) IAW DoD 5220.22-M, chapter 6-103.
  • All requests must be submitted on your company or organization letterhead, signed by your FSO and faxed to the above stated number.
  • SCI visits must be submitted to the SMO DKARAA3 3.
  • Proposal volumes shall contain the following: Volume Descriptions VOLUME 1 – GENERAL
  • VOLUME 2 – TECHNICAL/MANAGEMENT SUPPORT Volume 2 shall consist of a written narrative that is the Offeror’s proposed solution to the requirement contained in the Performance Work Statement (PWS).

Requirements

IDRequirement
R1It is requested that you submit a complete proposal package (including all requirement documents - i.e.: general, technical, price, etc.) for consideration in support of this Proposal Request.
R2Offerors shall include all documents and information requested. All proposals must be submitted in accordance with these instructions.Section A
R3The Offeror shall include with the proposal response a cover sheet that contains the company’s name, address, telephone number, name, title of the person authorized to sign and negotiate.Section A
R4Each proposal must be validated for a period of ninety (60) days or more from the initial submission date. The submission date shall be included on the cover sheet.Section A
R5Statements of Compliance: Each Offeror shall include a statement indicating complete compliance with the Proposal Request, or detailed analysis of any objections, exceptions, contingencies, or additions. Any objections, exceptions, contingencies, or additions shall include an appropriate rationale and must be cross-referenced to the paragraph(s) in the Proposal Request document to which they apply.Section A
R6If no exceptions are taken, the Offeror shall include the following statement in the Statement of Compliance: a. [Name of Offeror] takes no exception to any requirement or terms and conditions of the Proposal Request for this requirement. Offerors shall also include the following statement: “By submission of this offer, [Name of Offeror] agrees that in performance of the contract for services at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.”Section A
R7All information pertaining to technical/management support and price shall be confined to the appropriate part to facilitate independent evaluation. The Proposal shall be clear and concise, logically assembled (with all pages appropriately numbered) and referenced to applicable parts of the Performance Work Statement or Request for Proposal, as appropriate.Section A
R8No price information shall be presented in any part of the proposal except the Price Proposal.Section A
R9Pages shall be 8 ½ x 11 inches in size. Pages will be single-spaced and have one-inch margins at the top and bottom of pages and 1-inch margins at the sides and in between columns. The print will have a minimum font size of 10 points, Times New Roman for tables, charts, graphics, drawings, and diagrams. All other narratives will have a minimum font size of 12 points, Times New Roman.Section A
R10Technical/Management Support volume has a maximum of 45 pages. The complete Technical/Management Support volume pages shall be numbered consecutively.
R11b. Proprietary Information - The Offeror shall include a statement indicating whether the Offeror intends to make use of any proprietary or patent information. If use of such information is anticipated, the specific areas of use by the Offeror and its subcontractors must be clearly defined, including whether limited or unlimited rights are applicable. If applicable, the Offeror shall indicate the cost to the Government for acquisitions of each and all proprietary information identified in the proposal.Section A
R12SUBFACTOR 1 - Management and Quality Control Approach - The Offeror shall describe the site management methodology to accomplish the technical requirements of the PWS. The Offeror shall explain the program management methods to be employed to accomplish the technical requirements of the PWS.Section A
R13If subcontractors are proposed, discuss your oversight, communications and internal control plans that will ensure successful execution of the requirements. Discuss how the Government will be updated and how matters will be brought to the attention of the Government. Discuss performance and schedule control plans.Section A
R14Describe proposed on-site quality control procedures to include methods of monitoring performance to meet acceptable quality levels identified in the PWS.Section A
R15VOLUME 3 – PRICE PROPOSAL Provide (firm fixed) unit services prices. Enter the proposed monthly unit pricing in U.S. dollars rounded to two decimal places for phase-in, base year and all option years.Section A
R161. Services Firm Fixed Price Spreadsheet. The Offeror shall provide an Excel spreadsheet that illustrates the development of each proposed Schedule B unit price. If unit prices are the same for each contract period, provide one schedule and state that the schedule applies to all contract periods. Identify the escalation rate for the option period and any subcontracted work. For materials purchases, identify any indirect cost rates.Section A
R17Materials – Material (Replacement Parts & Material) shall be reimbursed at actual costs for the materials purchased plus allowable indirect costs. No profit or fee is allowed.Section A
R18To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Technical/Management factor.Section A
R19DO NOT PRINT THIS PAGE AND FILL IN YOUR PERTINENT INFORMATION, AS WE WILL NOT ACCEPT IT.Section A
R20The following information is required on the Visit Authorization Letter. • Name • SSN • Citizenship • Eligibility level and date(if applicable (An example of clearance level and date would be a SECRET clearance granted on ddmmmyy (03 Jul 08).) • Type of investigation and date (if applicable (An example of investigation type and date would be an SSBI dated ddmmmyy (03 Jul 08).) • Purpose of visit • Date of birth • Place of birth • POC at the JITC • Length of visit (maximum 1 year) • Signature block of your security manager or office manager on a company letterheadSection A
R21If unable to send via DISS or Fax, the information can be e-mailed to disa.huachuca.jt.list.security-office@mail.mil as long as the following conditions are met: • The VAR information is completed as directed above in number 2 • The VAR is attached and sent via encrypted e-mail, properly protecting the sensitive information contained within the document • If the e-mail cannot be sent encrypted, the document must be password protected and the document and password must be sent in SEPARATE e-mails. This is to ensure the protection of the sensitive information contained within the document.Section A
R22Wire suspension and compensating ropes shall be replaced (a) if the broken wires are equally distributed per rope lay in the worst section of the rope exceeds the value shown in column A of table 8.11.2.1.3 (b) if the distribution of broken wires is unequal and broken wires predominate in one or two stands, when the number of broken wires per rope lay in the worst section of the rope exceeds the values shown in column B of Table 8.11.2.3 (cc)(1); or (c) if four or five wires, side by side, are broken across the crown of any strand, when the number of broken wires per rope lay in the worst section of rope exceeds values shown in column C of Table 8.11.2.1.3 (cc)(1); or (d) if in the judgment of the inspector, any unfavorable condition, such as fretting corrosion (red dust or rouge), excessive wear of individual wires in the strands, unequal tension, poor sheave grooves, etc., exists, the criteria for broken wires will be reduced by 50% of the values indicated in Table 8.11.2.1.3(cc) (1) for any of the three conditions described above; or (e) if there is more than one valley break per rope lay.
R23On winding drum machines, the ropes shall be replaced (a) if the broken wires are equally distributed among the strands, when the number of broken wires per rope lay in the worst section of rope exceeds 12 to 18; or (b) if wire breaks predominate in one or two strands, when the number of broken wires per rope lay in the worst section of rope exceeds 6 to 12; or (c) if there is more than one valley break per rope lay.
R24On any type of elevator, the suspension compensation and governor ropes shall be replaced when their actual diameter is reduced below the value shown in Table 8.11.2.1.3 (cc)(3).

Recent awards in NAICS 811310

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2027-03-31STANLEY ELEVATOR COMPANY, INC.Department of the Army · THE ENGINEERING RESEARCH AND DEVELOPMENT CENTER, CRREL, IN HANOVER, NH REQUIRES A NEW ELEVATOR MAINTENANCE CONTRACT.$49,120
2026-11-01TRIMECH SOLUTIONS, LLCDepartment of the Navy · STRATASYS EC HWM, POP: 11/01/2026-10/31/2027$4,625
2026-09-30PHILLIPS CORPORATIONDepartment of the Air Force · HAAS MACHINE MAINTENANCE AND CALIBRATION SERVICES$64,605
2026-09-30WISAG TECHNICAL MILITARY SUPPORT SERVICES GMBH & CO. KGDepartment of the Army · FACILITIES MAINTENANCE AND REPAIR, SERVICE, BREMERHAVEN, DE ADDRESS OF PERFORMANCE:WESERPORT STRASSE 5 BREMERHAVEN 27580, GERMANYPERIOD OF PERFORMANCE: 30 SEPTEMBER 2026 TO 29 MARCH 2027$64,098
2026-09-29AMERICAN INSPECTION & TEST INCDepartment of the Army · PLEASE SEE PERFORMANCE WORK STATEMENT (PWS) FOR FULL REQUIREMENT DETAILS.$17,360
2026-09-26BATTISTELLA S.P.A.Department of the Army · SEMI-ANNUAL MAINTENANCE AND CERTIFICATION OF THE EDERLE JUMP TOWER, ITALY. INCLUDES STEEL CABLE, TROLLEY, CONCRETE AND RAPPEL WALL UPKEEP, COATINGS, TRIENNIAL MAGNETO-SCOPE TESTING, AND JUMP MASTER-TE$80,082

Source: USAspending.gov, retrieved 2026-11-13. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.