ANGKOR SENTINEL 27 TRANSPORTATION SERVICES: requirements and submission rules
93 requirements and 10 submission rules found in the solicitation documents for W91QVP-26-AS27-TRANSPORTATION. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
- All responses must be submitted in PDF format and the Pricing Sheet must be submitted in Excel format via email to MAJ Pandy, Phillip at phillip.d.pandy2.mil@army.mil and SSG Mbawuike, Uchechukwu at uchechukwu.mbawuike.mil@army.mil.
- All submissions are due to the responsible Contracting Office no later than 20 November 2026 @ 1300 1PM Hawaii Standard Time Zone.
- To be eligible for award under this request, contractors shall respond by the closing date and time as referenced above.
- The Government will not accept any changes to the contractor’s offer after the closing date of the solicitation.
- Contractor shall submit a request to obtain all appropriate permits required to fulfill the requirements of this PWS.
- 5.3.1 System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the US Government via a secure data collection site.
- The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov.
- The offeror shall ensure prices reflect fair market value and be reasonable when compared to the independent Government estimate, if applicable, and current market prices for same or similar services.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
Requirements
| ID | Requirement |
|---|---|
| R1 | The Contractor shall provide transportation services for U.S. Government personnel in Cambodia during the Angkor Sentinel 2027 exercise. The primary objective is to supply safe, reliable, and timely transport for approximately 100 passengers across multiple phases, including airport transfers, long-distance commutes, and on-site support. |
| R2 | The Contractor shall provide non-personal service(s). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents. |
| R3 | The Contractor shall provide all resources necessary to perform transportation services, including but not limited to: Three (3) 9-Passenger (or larger) vans; Two (2) 45-Passenger (or larger) coaches; Licensed drivers, fuel, insurance, and all operational costs; Transportation for airport (Techno International Airport) shuttles to Phnom Penh Lodging (Hyatt Regency Hotel), daily commutes between Lodging (Phum Serey Mongkul Resort) and Training site (Multinational Peacekeeping Force Training Center (ភូមិផ្គង់, ផ្លូវលេខ ៤៤, គីឡូម៉ែត្រ ៨, Krong Chbar Mon, Cambodia; PKO), and Transit between Phnom Penh and Kampong Speu (training site). |
| R4 | Due to the volatility of US Army Military Exercises and Operations, contractors must remain flexible to changes in the periods of performance, quantities, and potential for the addition/reduction of services within the general scope of the contract. Contractors will provide individual unit pricing in their quotes to facilitate these changes. |
| R5 | The contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208. |
| R6 | The Contractor shall inform the COR, if applicable, or Contract Specialist otherwise, of issues or potential issues that might affect the performance within two (2) hours of identifying those issues. Verbal reports shall be followed by written reports within 1 day of discovery of the issue. |
| R7 | Work shall be performed on local Host Nation holidays unless otherwise directed by the Contracting Officer. |
| R8 | The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. |
| R9 | Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 3 days. |
| R10 | Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. |
| R11 | The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. |
| R12 | The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. |
| R13 | Key personnel MUST be fluent in English in both spoken, listening, and written form. |
| R14 | All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. |
| R15 | Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website. |
| R16 | All contracted personnel shall comply with the Army Safety Program AR 385-10 and DA PAM 385-10. The contractor shall ensure that each employee is equipped with U.S. and Cambodia. Safety equipment including but not limited to: protective clothing, eye protection and hearing protection in accordance with (IAW) Occupational Safety & Health Administration (OSHA) Code of Federal Regulations (CFR) Title 29 Part 1910 (OCCUPATIONAL SAFETY AND HEALTH STANDARDS). They must adhere to any additional Cambodia standards imposed on the contractor that are in addition to the U.S. standards listed in the CFR above. |
| R17 | The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Cambodia Safety Laws and Regulations. |
| R18 | In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Cambodian requirements governing safety and health protection on construction sites and other applicable occupational safety codes. |
| R19 | The contractor is solely responsible to provide the necessary services, facilities, utilities, equipment, and so forth in order to meet the requirements in this contract. |
| R20 | The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. |
| R21 | The Contractor shall provide Transportation Services which includes the following: 1. Large Capacity Passenger Coach (Minimum 45-Passenger Capacity): Shall be fully climate-controlled (heating and air conditioning) with privacy blinds; Must accommodate military gear bags and personal baggage; A licensed and experienced driver. 2. 9-Passenger (9-Pax) Van: Shall be fully climate-controlled with functional front and rear air conditioning with privacy blinds; A licensed and experienced driver. |
| R22 | The Contractor shall provide transportation according to the following schedule: Airport Shuttles (Vans & Coaches): 9-Pax Vans: Daily airport shuttle services as required between 6 February and 27 February 2027, primarily between Techno International Airport (PNH) and the Hyatt Regency Hotel. 45-Pax Coaches: Dedicated to airport shuttle operations during specific travel windows: Arrival Window: Two (2) days of dedicated arrival shuttle support. Departure Window: Two (2) days of dedicated departure shuttle support. Inter-City Transit: Two (45-Pax) coaches for transit from Hyatt Regency Hotel (Phnom Penh) to Phum Serey Hotel (Kampong Speu). Daily Commute (Feb 13–27): Daily transit from Phum Serey Hotel to the PKO Training Center (morning departure and evening return). |
| R23 | Transportation with Driver Services: The Contractor shall provide transportation with driver services to US government personnel. (a) 40 Passenger Bus: Leased with driver; shall be capable of seating a minimum of 45 passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must always be fully functional. Buses may require bathroom facilities as noted on the call sheet. (b) Passenger Van. Leased with driver; shall be capable of seating a minimum of seven (9) passengers, not including the driver; shall be climate controlled capable of maintaining a comfortable temperature, heating and air conditioning system must always be fully functional. |
| R24 | The Contractor shall provide and maintain Defense Base Act (DBA) insurance for all personnel performing work under this requirement, in accordance with applicable U.S. laws and regulations. |
| R25 | The Contractor shall provide an estimated quote for DBA insurance during solicitation. |
| R26 | Contractor shall provide equipment and operators for availability within a 24-hour period, as required. |
| R27 | All equipment and operators shall be licensed and authorized to operate at locations specified in the place of performance. |
| R28 | The contractor shall provide all fuel, oils, vehicle insurance, tools, base access, economic zone fees, tolls, entry fees, repairs, maintenance, and any other operational costs for all equipment to be fully operational for the duration of this contract. |
| R29 | All mechanical controls shall be operative. All equipment shall be operative and kept in line with manufacturer’s recommended maintenance program. Vehicle must be able to adequately heat and cool the vehicles to comfortable levels for the passengers. |
| R30 | The Contractor shall maintain each piece of equipment pursuant to local and country safety requirements. |
| R31 | The contractor shall provide full service and will be solely responsible for the package to get from Origin to Destination. The contractor shall have experience in transporting personnel and equipment. The contractor shall be cleared, through own expense and process, to conduct business unescorted inside all areas within the place of performance. |
| R32 | Transportation shall comply with all applicable Cambodia regulations. The contractor shall provide shipping papers and any requested documentation (such as licenses) in advance of a shipment for review and acceptance by USG. |
| R33 | The contractor shall have an established transportation tracking system and shall maintain constant control and/or surveillance during transit. Upon request, the contractor shall provide POC with real-time tracking information of the applicable transportation vehicle in transit and through arrival to destination. Upon request, the contractor shall provide USG POC verbal updates for estimated time of arrival as well as status update during transit. The contractor shall immediately notify USG in case of emergency, situations, or any conditions preventing the timely arrival of the transportation vehicle at the destination. |
| R34 | The contractor and COR will conduct a joint inspection of the equipment at point of origin. |
| R35 | The contractor and COR will conduct a joint inspection of the equipment at destination upon delivery. |
| R36 | LATE DELIVERY. In the event the contractor anticipates or encounters difficulty in complying with the schedule, the contractor shall immediately notify the COR telephonically giving full detailed reasons for the delay and a remedy. |
| R37 | RECOVERY. Upon notification by the COR or contracting officer, the contractor shall recover disabled equipment within 24 hours. The contractor shall provide a replacement for all disabled equipment at the time of recovery. |
| R38 | Daily mileage will not exceed 800km. |
| R39 | Drivers are restricted to a maximum of 12 consecutive hours of work within a 24-hour period. One day equals 12 hours with possible nighttime operations. The COR will designate the 12-hour period. The contractor shall also be capable of providing 24-hour coverage when required, which will be billed as two 12-hour days and included in the notes of the call sheet. |
| R40 | The contractor shall be cleared, through own expense and process, to conduct business unescorted in Cambodia. |
| R41 | Vehicles and drivers shall comply with all applicable Cambodia regulations; to include licenses and registration. |
| R42 | Vehicles shall have operational and readily accessible seatbelts for Vehicles vans. Vehicles will adhere to local/national safety laws/regulations regarding providing seatbelts for passengers. |
| R43 | All hazardous materials (HAZMAT) used on vehicle/equipment must be contained and stored in the appropriate storage containers and/or cabinets. The contractor shall immediately report spills or releases of hazardous materials to the COR. The contractor shall be liable for containment and environmental cleanup of spillage or release of such substances. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. The contractor shall comply with environmental and hazardous materials storage and handling requirements. The contractor will comply with municipal environmental laws to protect the health and safety of employees / residents and minimize or eliminate environmental pollution. |
| R44 | Contractor will instruct their equipment operators to not share details of their work, equipment downloaded, cargo/passenger destinations and any other details of their work on social media. |
| R45 | Contractor is obligated to comply with generally accepted standards of the transportation industry for operation and maintenance practices. Contractor shall comply with all provisions of applicable statutes and agreements which may affect safety, and with all local and installation regulations, directives, orders, rules, laws, and standards pertaining to service provided within this PWS. |
| R46 | Vehicle and Driver Hygiene/Cleanliness. The vendor shall ensure that all vehicles and drivers meet strict hygiene and cleanliness standards to safeguard passenger health. Vehicles must be cleaned and disinfected regularly, paying special attention to high-contact areas. Drivers are required to maintain personal hygiene, including wearing clean clothing and practicing proper hand sanitation. The vendor is responsible for providing necessary hygiene supplies, such as hand sanitizers and disinfectant wipes, to both drivers and passengers. All cleaning and hygiene practices should align with local health regulations and industry best practices to minimize any risk of disease transmission. |
| R47 | Equipment operators shall be proficient in conversational Basic English and able to translate directions / instructions from the COR. |
| R48 | Equipment operators will keep in their person at all times a valid license or equal documentation that may be required by the host nation as proof for legal operation of the vehicle/equipment in which they are assigned to drive/operate. |
| R49 | Equipment operators shall have a means of communication, and be reachable during prescribed duty hours. The contact information for each operator shall be provided to the Contracting Officer and Contracting Officer Representative (COR) prior to delivery. The government will not provide cell phones to any vehicle/equipment operators. |
| R50 | The contractor is responsible for all scheduled and unscheduled maintenance of vehicles. The contractor shall provide all parts and labor necessary to complete required maintenance tasks at no additional cost to an already agreed upon/negotiated lease rate. Contractor provided parts may include, but are not limited to, windshield wipers, tires, headlamps, filters, fluids, and lubricants. Maintenance shall be performed according to the manufacturer’s recommended maintenance schedule. |
| R51 | If the contractor’s scheduled or unscheduled maintenance results in the Government losing use of equipment for more than 12 hours, the contractor shall provide a replacement of a comparable capability for the Government to use. |
| R52 | Contractor is responsible for furnishing all materials, labor, management, supervision, tools, components, supplies, services and equipment necessary to deliver, set-up, install, perform daily services, and remove the equipment required for services. |
| R53 | All equipment shall be delivered in serviceable conditions without holes, cracks, or leaks, or corrosion. |
| R54 | Repairs/Replacement. The contractor shall make necessary repairs to equipment upon identification of deficiencies. The contractor shall make repairs identified by the COR within 24 hours. The contractor shall respond to emergencies within four (4) hours when notified by the COR or contracting officer. |
| R55 | The contractor is responsible for the security of contractor equipment. |
| R56 | The Contractor shall ensure that all employees are supplied and use proper safety equipment (i.e. gloves, safety glasses and boots) and follow APF policy for safety procedures. |
| R57 | The Contractor is solely responsible for the cleanliness, maintenance, fueling, and other costs associated with providing all services in this PWS. |
| R58 | Fuel - Fuel will not be priced separately and will be built into the total contract price. |
| R59 | All equipment shall be emplaced and ready for use no later than 1200 of the first day of the period of performance. |
| R60 | The contractor shall coordinate with the COR at each site to ensure correct placement at each location. |
| R61 | The contractor and COR will conduct a joint inspection of the equipment upon delivery to ensure the equipment is serviceable prior to installation at the specified locations. At time of delivery, the contractor shall complete a joint pre-inspection with the COR verifying that items have been delivered, are in the correct location, and are operational in accordance with the contract. Joint inspection will not occur any earlier than the start of performance unless agreed upon by the contractor. The contractor shall also provide a copy of the post inspection sheet. The contractor must stand by until these inspections are complete. |
| R62 | Any expense to remove/replace the equipment/services will be the contractor’s responsibility. |
| R63 | All equipment shall be removed from all locations no later than 1600 the day after the period of performance. |
| R64 | The contractor and COR will conduct a joint inspection of the equipment upon removal. The contractor shall complete a joint Post-inspection with the COR verifying that items have been recovered in good condition. The contractor shall also provide a copy of the post inspection sheet. |
| R65 | All equipment / services listed in this PWS will adhere to standards within this paragraph [5.2.27 Electrical Standards, including grounding, RCDs/GFCIs, weatherproof enclosures, conduit couplings, and ground resistance <= 10 ohms]. |
| R66 | All generators shall have a fuel containment system. Fuel Containment Systems - The Contractor shall properly ground any fuel containment systems to be used. The ground should be separate from the generator ground and shall be tested at a resistance of 10 ohms or less. The contractor shall provide a ten (10) pound ABC fire extinguisher or equivalent with a readable pressure gauge at the fuel containment site. Contractor shall have a spill kit with serviceable items inside by every generator or fuel consuming equipment and dispose of any used items properly. The contractor is responsible for removing all fuel/oil/HAZMAT spills IAW local law. |
| R67 | Deliverable: Name and contact information of the Contract Manager and designated alternate, within 3 days of award, 1 copy, format Email, submit to KO and COR. |
| R68 | Deliverable: Names and Photocopies of Identification for all Contractor Employees requiring access to the place/location of performance, within 3 days of award, 1 copy, format MS Word or PDF, submit to KO and COR. |
| R69 | Deliverable: Equipment Pre-Inspection Sheet, 3 days after delivery, 1 copy, format PDF, submit to KO and COR. |
| R70 | Deliverable: Equipment Post-Inspection Sheet, 3 days after completion of services, 1 copy, format PDF, submit to KO and COR. |
| R71 | Do NOT share this RFQ with other vendors or this may result in being eliminated from the competition. |
| R72 | Contractor must be able to accept payment via WAWF in United States Dollar (USD) in order to be eligible for award. |
| R73 | All quotes shall be valid for at least 90 days from submission. |
| R74 | The Contractor shall list all prices in United States Dollar (USD). |
| R75 | The offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your offer and who can obligate your company contractually. |
| R76 | Offerors shall complete pricing for ach CLIN as required WITHOUT TAXES, CONTINGENCIES and including ALL SHIPPING CHARGES. Offers shall be provided in US Dollars at the time of evaluation. |
| R77 | The contractor/vendor must have an active registration on SAM, provide their CAGE Code, and active WAWF enrollment. |
| R78 | The offeror will be required to provide evidence of a pricing estimate for DBA insurance from an approved Department of Labor provider, normally via a broker, either with its offer or prior to award... The contractor will be required to have a DBA policy in place prior to the commencement of work. The contractor shall purchase DBA insurance only from carriers that are authorized to provide such coverage by the United States Department of Labor (DOL). This requirement also applies to all subcontractors. |
| R79 | Contractors are advised to provide pictures of any equipment’s or vehicles that will be used to fulfill the requirements specified in the PWS. |
| R80 | Each offeror is required to provide complete pricing for each contract line identified. |
| R81 | The offeror shall ensure the pricing of contract line items are not significantly over or understated, which may increase performance risk or result in unreasonably high prices. |
| R82 | Offerors must complete the representation and disclosures in FAR 52.204-24 Regarding Certain Telecommunications and Video Surveillance Services or Equipment, if applicable. |
| R83 | By submission of its offer, the offeror represents and certifies compliance with FAR 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certifications. |
| R84 | Offeror shall complete representations under FAR 52.229-11 regarding whether it is a foreign person and whether an exemption is claimed on IRS Form W-14. If the Offeror represents it is a foreign person, the Offeror shall submit with its offer the IRS Form W-14. |
| R85 | The Offeror shall complete representations and disclosures regarding covered defense telecommunications equipment or services under DFARS 252.204-7016 and DFARS 252.204-7017. |
| R86 | Offerors must complete and provide Company Information with quote: Company Name, Unique Entity Identifier, CAGE Code, Point of Contact Name, Point of Contact Phone, Point of Contact Email, and confirmations of Active SAM registration, WAWF registration, and Section 889 Compliance. |
| R87 | Each van under CLINs 0001 and 0002 shall provide a minimum of nine (9) passenger seats excluding the driver. |
| R88 | All parking fees associated with performance of CLINs 0001, 0002, and 0003 (airport, hotel, and any other parking required for the scheduled airport shuttles and daily commute runs) shall be absorbed into the firm-fixed-price CLIN rates. |
| R89 | Each van must accommodate a minimum of 9 passengers plus their luggage and military gear bags; each coach a minimum of 45 passengers plus luggage/gear bags. Everything must fit inside the vehicles. A separate luggage trailer is not authorized unless specifically approved in writing by the Contracting Officer. |
| R90 | The Contractor is responsible for secure overnight parking. |
| R91 | The Contractor shall notify the COR immediately of any significant damage. |
| R92 | Contractors are required to factor any taxes into their quotations. |
| R93 | DBA insurance must cover all personnel performing work under the contract, including subcontracted coach operators, primary drivers, and any relief drivers. The requirement applies to the prime and all subcontractors. |
Recent awards in NAICS 485510
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-07 | RICHFIELD BUS CODepartment of the Air Force · CHARTER BUS TO CAMP GRAFTON FOR THE 891 MSFS. | $62,725 |
| 2026-08-01 | ASAKURA JIDOSHA K.K.Department of the Air Force · CHARTERED TWO (2) BUSES SERVICES FOR U.S. ARMY. THE CONTRACTOR MUST BE DULY AUTHORIZED TO OPERATE AND PERFORM SERVICES REQUIRED IN THE PWS IAW THE TERMS AND CONDITIONS UNDER THIS CONTRACT AND APPLICAB | $392,000 |
| 2026-07-29 | POLYNESIAN ADVENTURE TOURS, LLCDepartment of the Navy · USS ESSEX CHARTER BUS SERVICES | $88,831 |
| 2026-07-17 | EPIC TRANSPORT AND LOGISTICS OPCDepartment of the Navy · PRDS - MRF-SEA TRANSPORTATION SERVICE SUPPORT. THE CONTRACTOR SHALL PROVIDE TRANSPORTATION WITH DRIVER SERVICES IN ACCORDANCE WITH THE ATTACHED CALL SHEET AND MASTER BPA PWS. | $279,993 |
| 2026-07-09 | RED ORANGE NORTH AMERICA INC.Department of the Navy · PANAMA INFILL | $10,010 |
| 2026-07-09 | ADVENTURES BY DAWN L.L.CDepartment of the Navy · STATEMENT OF WORK | $150,000 |
Source: USAspending.gov, retrieved 2026-11-09. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.