Solicitation for Cable Assembly, Special / NSN: 5995-01-659-9699: requirements and submission rules
61 requirements and 15 submission rules found in the solicitation documents for W912CH-27-Q-A013. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Do not format Worksheet cells with the font color equal to the fill color.
- A.8.2 To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, "Militarily Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS).
- In the event PIEE Solicitation is offline, the offeror must obtain Contracting Officer approval to use an alternate submission method prior to the solicitation closing date/time.
- L.6.3 Submission Due Date - the offeror must ensure its proposal, modification, or revision /amendment in its entirety, reaches the required destination before the solicitation closing date /time established in this solicitation.
- (3) The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.
- A.5.2 Interested offerors shall submit a proposal via email to the Contract Specialist (eboni.q.albert. civ@army.mil) and cc the corresponding Contracting Officer (Daniel.j.gibson43.civ@army.mil) with the subject header: Proposal Submission - W912CH-27-Q-A013 (company name).
- A.5.7 All questions regarding the requirements of this solicitation and applicable attachments must be submitted by 10-NOV-2026, 5PM EST to eboni.q.albert.civ@army.mil.
- C.1.6 If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
- Those same individuals MUST be registered in SAM.
- Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.") D.1.2 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers.
- Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
- Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data Requirements List, DD Form 1423.
- If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.
- When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results.
- (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.
Requirements
| ID | Requirement |
|---|---|
| R1 | Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter. |
| R2 | Failure to register in SAM for the corresponding NAICS code identified in paragraph A.3 prior to submitting a proposal against this solicitation may preclude an award being made to your company.A.4 |
| R3 | In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the Government office designated in the solicitation by the time specified.A.5 |
| R4 | Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:A.6.1 |
| R5 | Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.A.8 |
| R6 | Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.A.8 |
| R7 | Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.A.9 |
| R8 | OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.A.9.2 |
| R9 | The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.C.2 |
| R10 | Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training.C.3 |
| R11 | Within 10 days of completing the training, the contractor shall provide certificates/proof of completion to the Contracting Officer's Representative (COR), if assigned to the contract, or the Procuring Contracting Officer (PCO).C.3 |
| R12 | Per AR 381-12, all Department of the Army (DA) personnel (military/civilian/contractor) must complete CIAR training within 30 days of assignment or employment to an organization/contract, and then once every 12 months thereafter pursuant to DoDD 5240.06.C.3 |
| R13 | Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging InstructionD.1 |
| R14 | The load shall be contained in a manner that will permit safe handling during shipment and storage.D.1 |
| R15 | In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129).D.1.3 |
| R16 | Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.D.1.3 |
| R17 | Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement RegulationsD.1.4.2 |
| R18 | WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement RegulationsD.1.4.2 |
| R19 | The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.D.1.4.2 |
| R20 | Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.D.1.4.2 |
| R21 | Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents: D.1.5.2.1 International Air Transport Association (IATA) Dangerous Goods Regulations, D.1.5.2.2 International Maritime Dangerous Goods Code (IMDG), D.1.5.2.3 Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49, D.1.5.2.4 Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19 (I)/DLAM 4145.3(I) (for military air shipments).D.1.5 |
| R22 | A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.D.1.5.2.4 |
| R23 | A prototype package is required to validate the sizes and fit requirements of the SPI.D.1.5.2.4 |
| R24 | The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.E.1 |
| R25 | The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.E.1 |
| R26 | When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required.E.1 |
| R27 | When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing (4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.E.1 |
| R28 | The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.E.1 |
| R29 | The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.E.1 |
| R30 | The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for [listed exceptions (1)-(5)].E.1 |
| R31 | Those inspections which are of a destructive nature shall performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.E.1 |
| R32 | A First Article Test Report shall be compiled by the contract documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing /specification characteristic and unlisted characteristic.E.1 |
| R33 | One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.devcom-ac.mbx.rdarqep@army.mil.E.1 |
| R34 | The Contractor shall not reuse any components from items used in destructive test during First Article, lot acceptance or in-process testing, unless specifically authorized by the Contracting Officer.E.1 |
| R35 | Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.E.1 |
| R36 | The Contractor shall comply with the higher-level quality standard(s) listed below. ISO 9001:2015 (21 Oct 2015) or equivalentE.1 |
| R37 | The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontractsE.1 |
| R38 | At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer (daniel.j.gibson43.civ@army.mil), in writing of the time and location of the testing so that the Government may witness the tests.E.1 |
| R39 | Delivery under this contract must conform to the required schedule specified below, unless no-cost acceleration is acceptable.F.2 |
| R40 | Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract.F.2.2.3 |
| R41 | The Contractor shall submit the first article test report within 110 calendar days from the date of this contract to the Contracting Officer (daniel.j.gibson43.civ@army.mil) and Contract Specialist (eboni.q.albert.civ@army.mil) marked 'FIRST ARTICLE TEST REPORT: Contract No. TBD, Lot/Item No. 13678655 NSN: 5995-01-659-9699.'Section I (contract clauses) |
| R42 | The Contractor shall provide a unique item identifier for CLIN 0001 CABLE ASSEMBLY, SPECIAL and CLIN 0003 CABLE ASSEMBLY, SPECIAL. |
| R43 | The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022, Information technology - International symbology specification - Data matrix; ECC200 data matrix specification.Section I (contract clauses) |
| R44 | The Offeror shall list those supplies that are foreign end products (other than those listed in paragraph (b) of this provision) as defined in the clause of this solicitation entitled 'Buy American-Free Trade Agreements-Israeli Trade Act.'Section K (representations) |
| R45 | The Offeror shall list the line item numbers of domestic end products that contain a critical component (see FAR 25.105).Section K (representations) |
| R46 | The offeror shall clearly state in its proposal the acceptance period.L.1.2 |
| R47 | An offer allowing less than the Government's minimum acceptance period, or fails to provide a proposal acceptance period, may be rejected.L.1.2 |
| R48 | All proposals shall be in English (American Standard) and shall be in US dollars.L.2.1 |
| R49 | The proposal shall include all information specified and shall address all requirements outlined in Section L.L.2.1 |
| R50 | Maximum size of each e-mail shall be 10 megabytes.L.2.2 |
| R51 | Each submitted File shall be labeled so it is easily identifiable for which information it pertains.L.2.2 |
| R52 | All electronic information provided in response to the solicitation must be provided in Microsoft (MS) Office 2013 compatible or Adobe Portable Document Format (PDF) format or except as noted in the proposal instructions below.L.2.2 |
| R53 | The proposal shall not contain citations for, or active links to live Internet sites or pages. All linked information shall be contained within the electronic proposal.L.2.2 |
| R54 | If the offeror intends to request a waiver, a First Article Waiver Worksheet must be completed and submitted to the Government along with any supporting documentation. The worksheet can be found in Section J 'Attachments' of this solicitation.L.2.2 |
| R55 | The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable).L.2.2 |
| R56 | The offeror shall list specifically on the worksheet, by technical data package reference, that portion of the test requested to be waived.L.2.2 |
| R57 | The request for waiver must be accompanied by documentation in support of the request.L.2.2 |
| R58 | If a copy of a First Article Test report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.L.2.2 |
| R59 | Any proposal, modification, or revision/amendment shall be submitted electronically through the Solicitation module within the PIEE, available at: https://piee.eb.mil.L.6.2 |
| R60 | The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.L.7 |
| R61 | CAUTION Offeror hereby is cautioned to enter prices for first article items and for production items that reflect a fair apportionment of total contract costs, based upon the value to be received for those items by the Government.M.2 |
Recent awards in NAICS 334419
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-10-07 | MISSION SYSTEMS DAVENPORT INC.Department of the Air Force · COMMON REGULATOR TEST STANDS (CRTS) IN ACCORDANCE WITH THE STATEMENT OF WORK | $3.47 million |
| 2027-04-30 | NORTHROP GRUMMAN SYSTEMS CORPORATIONDepartment of the Air Force · LARGE AIRCRAFT INFRARED COUNTERMEASURES ACQUISITION SYSTEMS ENGINEERING REQUIREMENT CROSS FUNCTIONAL (LASER X) CY24-26 SOFTWARE SUSTAINMENT | $47.23 million |
| 2026-09-25 | SHOCK STREAM LLCDepartment of the Army · SIT SAT WIRELESS CONVERSION | $140,816 |
| 2026-08-28 | THEISSEN TRAINING SYSTEMS INCDepartment of the Army · PURCHASE REPAIR PARTS FOR THEISSEN TARGET SYSTEMS CURRENTLY IN USE AT FORT DRUM. LIST OF PARTS ATTACHED AS ATTACHMENT 1 | $109,781 |
| 2026-07-31 | NORTHROP GRUMMAN SYSTEMS CORPORATIONDepartment of the Air Force · HOSTILE FIRE INDICATION/LASER WARNING (HFI/LW)/COUNTER-SMALL UNMANNED AERIAL SYSTEM (C-SUAS) - OPTICAL DETECTION AND IDENTIFICATION NODE (ODIN) | $11.20 million |
| 2026-07-24 | KIJERO, LLCDepartment of the Navy · ELECTRONIC COMPONENTS | $286,492 |
Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.