Fort Eustis Dredge Material Management Area (FEDMMA): requirements and submission rules
27 requirements and 15 submission rules found in the solicitation documents for W9123626BA008. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Additionally, please be advised that when using the PIEE Solicitation Module, the user's e-mail address in PIEE must match the e-mail address on file in SAM.gov.
- This amendment extends the bid due date from 01 DEC 2026 to 12 January 2027 , and bid opening date from 02 DEC 2026 to 13 January 2027 allow the government time to respond to bidder inquiries.
- In the event the PIEE Solicitation Module is down, the Bidder must notify the Contracting Officer, that the system is down and submission through the Solicitation Module is not possible, prior to the submission deadline.
- All bids received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Revolutionary Federal Acquisition Overhaul (RFO).
- In the event the Contractor alleges technical difficulties and does not notify the contracting officer until after the submission deadline, the Contracting Officer will follow procedures identified in the (RFO 52.214-7) to determine if the Contractor's late submission is accepted.
- EDT participants once bid submission due date and time has lapsed.
- Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments.
- A copy of the duly executed Bid Guarantee (signed by principal and surety with raised seal) must also be included in the attachment labeled "Bid.26BA2008_Bidder Name." A physical copy of the Bid Guarantee in proper form with evident raised seal must be submitted within seventy-two (72) hours to the Government upon request from the apparent low bidder.
- The apparent low bidder shall submit the below responsibility documents to the Government within 3 working days of Government request: a) One (1) signed bank reference demonstrating adequate financial resources.
- The submission responding to the DRC must be provided in the form of a written detailed narrative, with a page limitation that shall not exceed five W9123626BA0080007 Page 6 of 19
- All bids must be submitted by electronic commerce only (that is, by submission via PIEE, as discussed below, only).
- Bids shall be submitted through the Solicitation Module of the Procurement December 2026 at 2:00 P.M.
- The Proposal Manager role is required to submit an offer to a solicitation posted in the PIEE Solicitation Module.
- provide information on how many figures bidder can borrow against the line of credit (e.g., medium 6 figures - exact line of credit is not required). b) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if available, or if unavailable then signed by an authorized officer of the organization.
- Offerors shall fill in any provisions not already listed in SAM.gov, and shall fill in any provisions where the offeror's response differs for this Solicitation as compared to what is stated in SAM.gov.
Requirements
| ID | Requirement |
|---|---|
| R1 | Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. |
| R2 | Bidders are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission. |
| R3 | Electronic copies of each volume shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item. |
| R4 | Do NOT enter Privacy Act Data (Personal Identification Information (PII) in the File Description.) |
| R5 | Any questions regarding bid submission must be submitted in ProjNet. |
| R6 | Documents to be submitted prior to the Bid Closing Date: 1. Filled-in and signed SF1442 (page 1 and 2) |
| R7 | Documents to be submitted prior to the Bid Closing Date: 2. Filled-in and signed SF30s (for any amendments to the Solicitation) |
| R8 | Documents to be submitted prior to the Bid Closing Date: 3. Filled in Bid Schedule. See Instructions Section 2 and Attachment 3 to this solicitation. |
| R9 | Documents to be submitted prior to the Bid Closing Date: 4. Bid Guarantee (See Instructions and RFO Clause 52.228-1) |
| R10 | Documents to be submitted prior to the Bid Closing Date: 5. Responsibility Documents, optional (See Instructions Section 3) |
| R11 | Documents to be submitted prior to the Bid Closing Date: 6. Copy of JV Agreement, if applicable (See Instructions Section 3) |
| R12 | Documents to be submitted prior to the Bid Closing Date: 7. Evidence of Agency Authority, if applicable (See Instructions Sections 8) |
| R13 | All blanks on the Attachment 3 Bid Schedule must be filled in by the bidder. In order for the bidder to be considered responsive, all CLINs must provide pricing in order to be considered. If a zero is proposed as cost of a line item, it should be clearly identified on the CLIN schedule by stating "$0.00" as applicable. All Unit Prices and Net Amounts on Attachment 1 must be rounded to the nearest whole dollar. |
| R14 | To be determined responsible, a bidder must: a) Have adequate financial resources to perform the contract, or the ability to obtain them. b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments. c) Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history. d) Have a satisfactory record of integrity and business ethics. e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them. g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations. |
| R15 | The written narrative for the DRC listed below must demonstrate a bidder's successful completion of a contract(s) demonstrating all of the following three performance elements. The experience may be, but does not need to be, demonstrated in a single contract and may be demonstrated through more than one contract. To be deemed qualifying experience, each contract must have a minimum $1 million contract value and projects must have been completed within the past ten years immediately preceding the date of solicitation. |
| R16 | DRC 1: Demonstrate that the company has performed as the prime contractor on at least one (1) construction contract either on a military installation or other construction contract with the US Army Corps of Engineers located within the continental United States, completed within the last ten (10) years from issuance of this solicitation (on or after 18 June 2016). Supply the following information for each contract submitted: a. Name of project, b. Date of award, c. Date of completion, d. Name of owner, e. Owner point of contact information, f. Contract number, g. Description of the work performed. |
| R17 | DRC 2: Demonstrate that the company has performed as the prime contractor on at least one (1) construction contract performing work in marshy/wet environments located within the continental United States, completed within the last ten (10) years from issuance of this solicitation (on or after 18 June 2016). Supply the following information for each contract submitted: a. Name of project, b. Date of award, c. Date of completion, d. Name of owner, e. Owner point of contact information, f. Contract number, g. Description of the work performed. |
| R18 | DRC 3: Demonstrate the company has performed as the prime contractor, or as a subcontractor on at least one (1) U.S. federal construction contract that included moving, placing, and compacting greater than 6000 CY of fill material, completed within the last ten (10) years of issuance of this solicitation (on or after 18 June 2016), with a minimum contract value of $1,000,000.00. Supply the following information for each contract submitted: a. Name of project, b. Date of award, c. Date of completion, d. Name of owner, e. Owner point of contact information, f. Contract number, g. Description of the work performed. |
| R19 | Each contractor's (company's) experience shall be identified as belonging to that company. If subcontractor experience is used to meet the DRC number 3, a letter of commitment must be submitted from the subcontractor. |
| R20 | Evidence of the authority of individuals signing offers to submit firm offers on behalf of the offeror is required except where the offer is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated offeror; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive. |
| R21 | Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such bidder, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof. |
| R22 | Bids signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent's authority to act on behalf of its Principal. |
| R23 | The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. |
| R24 | Submit all technical inquiries and questions relating to the solicitation via Bidder Inquiry to ProjNet at www.projnet.org/projnet. |
| R25 | In accordance with RFO FAR 52.204-7 SAM Registration please ensure that your Cage Code is listed on Block 14 of the SF1442 in order to be responsive. |
| R26 | Bidders must represent in SAM.gov that they are a Small Business under NAICS code 237990. |
| R27 | If bidder is submitting a bid as a Joint Venture (JV) submit your JV Agreement with your bid. |
Recent awards in NAICS 237990
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-07-10 | EMPIRE EQUIPMENT SERVICE, INC.Department of the Army · MURRIETA CREEK PHASE 2B | $46.16 million |
| 2027-02-28 | MANSON CONSTRUCTION CODepartment of the Army · MISSISSIPPI RIVER, BATON ROUGE TO GULF, SOUTHWEST PASS HOPPER DREDGE CONTRACT NOS. 1-2026 | $13.32 million |
| 2026-11-15 | NORFOLK DREDGING COMPANYDepartment of the Army · THE U.S. ARMY CORPS OF ENGINEERS (USACE), PHILADELPHIA DISTRICT HAS A REQUIREMENT FOR THE MAINTENANCE DREDGING, DELAWARE RIVER, PHILADELPHIA TO SEA AND WILMINGTON HARBOR FY26 PROJECT. | $27.25 million |
| 2026-11-01 | AGATE CONSTRUCTION COMPANY, INC.Department of the Army · NORTH JETTY REPAIRS, INDIAN RIVER INLET | $53.00 million |
| 2026-10-01 | MARINEX CONSTRUCTION INCDepartment of the Army · THE SAVANNAH INNER HARBOR DREDGING CONTRACT PROVIDES CONSTRUCTION SERVICES, INCLUDING FURNISHING PERSONNEL, TRANSPORTATION, MOBILIZATION AND DEMOBILIZATION, EQUIPMENT AND MATERIALS REQUIRED IN CONNECT | $33.05 million |
| 2026-09-03 | MARINEX CONSTRUCTION INCDepartment of the Army · THE SCOPE OF WORK INCLUDES THE EXPANSION OF THE CEDAR HAMMOCK RANGE BEND WIDENER LOCATED BETWEEN STATIONS 20+300 AND 23+300. APPROXIMATELY 346,000 CUBIC YARDS OF DREDGED MATERIAL IS ANTICIPATED TO BE | $19.14 million |
Source: USAspending.gov, retrieved 2026-11-19. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.