EAGLE Ft. Carson CO W519TC-27-R-A014: requirements and submission rules
28 requirements and 0 submission rules found in the solicitation documents for W519TC-27-R-A014. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | Mark “X” in the appropriate column. |
| R2 | On Page 2, provide a narrative describing how the current accounting system supports your response to each item. Be as descriptive as necessary |
| R3 | Contractor Name: Point of Contact (Name/Ph #/Email): CAGE Code: READY FOR AUDIT (YES) / (NO): |
| R4 | Is the accounting system in accord with generally accepted accounting principles? |
| R5 | ACCOUNTING SYSTEM PROVIDES FOR: a. Proper segregation of direct costs from indirect costs. |
| R6 | ACCOUNTING SYSTEM PROVIDES FOR: b. Identification and accumulation of direct costs by contract. |
| R7 | ACCOUNTING SYSTEM PROVIDES FOR: c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) |
| R8 | ACCOUNTING SYSTEM PROVIDES FOR: d. Accumulation of costs under general ledger control. |
| R9 | ACCOUNTING SYSTEM PROVIDES FOR: e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. |
| R10 | ACCOUNTING SYSTEM PROVIDES FOR: f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. |
| R11 | ACCOUNTING SYSTEM PROVIDES FOR: g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account. |
| R12 | ACCOUNTING SYSTEM PROVIDES FOR: h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. |
| R13 | ACCOUNTING SYSTEM PROVIDES FOR: i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. |
| R14 | ACCOUNTING SYSTEM PROVIDES FOR: j. Segregation of preproduction costs from production costs. |
| R15 | Accounting system provides financial information: a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). |
| R16 | Accounting system provides financial information: b. Required to support requests for progress payments. |
| R17 | Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions? |
| R18 | Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) |
| R19 | Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable. |
| R20 | PLEASE ANSWER ALL QUESTIONS BELOW: |
| R21 | ARE YOU PLANNING ON BIDDING ON COST TYPE CONTRACTS? (YES/NO) |
| R22 | ARE YOU READY FOR A DCAA AUDIT? (YES/NO) |
| R23 | HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO) |
| R24 | HAVE YOU READ THE "Information for Contractors" DOCUMENT ON DCAA's WEBSITE (http://www.dcaa.mil/)? (YES/NO) |
| R25 | PLEASE IDENTIFY THE DCAA OFFICE THAT IS COGNIZANT OVER YOUR COMPANY - >(Found on DCAA's website (http://www.dcaa.mil/) |
| R26 | PLEASE IDENTIFY YOUR COMPANY’S POINT OF CONTACT (Name/ph #/ eMail) |
| R27 | If an Outside CPA/Consultant/Non DoD agency has reviewed your Accounting System, please provide a copy of the Report |
| R28 | [Insert name and title of individual responsible for design of the accounting system] Name: Signature: Title: Date: Contractor: |
Recent awards in NAICS 561210
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-07-01 | SIEMENS INDUSTRY INCDepartment of the Air Force · SIEMENS AIR GAPPED SYSTEM. | $127,768 |
| 2026-10-01 | MEDIA PLUMBING & HEATING INCDepartment of the Army · FIRE ALARM PREVENTATIVE MAINTENANCE, INSPECTION, TESTING AND REMEDIAL REPAIRS SERVICE CONTRACT | $242,760 |
| 2026-10-01 | HAMHED LLCDepartment of the Army · PROVIDE CUSTODIAL SERVICES FOR THE SOUTH ALABAMA AREA ENGINEER AND FORT RUCKER RESIDENT OFFICE, BUILDING 613, FORT RUCKER, ALABAMA. BOTH THE LOCATION AND THE LAYOUT OF BUILDING 613 ARE SHOWN ON EX 2. | $20,340 |
| 2026-09-20 | KBR SERVICES, LLCDepartment of the Air Force · ENGINEERING SUPPORT SERVICES AT ALI AL SALEM AIR BASE, KUWAIT | $357,498 |
| 2026-09-20 | NATIVE AMERICAN PRIDE CONSTRUCTORS, LLCDepartment of the Air Force · SOUTHCOM DOMINICAN REPUBLIC SAFE BOAT | $1.00 million |
| 2026-09-15 | NEWIMAR SOCIEDAD ANONIMADepartment of Defense Education Activity · TOTAL MAINTENANCE CONTRACT SERVICES FOR SPAIN | $433,878 |
Source: USAspending.gov, retrieved 2026-11-18. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.