M82 Energetics: requirements and submission rules
45 requirements and 15 submission rules found in the solicitation documents for W519TC-27-R-A003. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- As a requirement under this solicitation, all Offerors must submit Representations/Certifications data into the System for Award Management (SAM) Database at https://www.sam.gov/.
- Any Offeror that has previously submitted Representations/Certified data in SAM are reminded to update the data prior to submitting its proposal and shall ensure its records are not expired. g.
- New/changed information shall be identified by a vertical line in the margin next to the change or addition and by using redline and strikeout features. e.
- Contractor questions regarding the solicitation and drawings are due no later than 27 November 2026 at 3:00 pm CST, to ensure that all questions can be answered and posted for all Offeror's knowledge prior to solicitation closing.
- Proposals are to be submitted no later than 3:00PM CST on 18 December 2026.
- Volume V-Acknowledgements and signatures This volume shall contain one completed signed electronic copy of the complete solicitation, SF33, and continuation sheets (Section A through M) and acknowledgement of all amendments (see Section L.5) L.3.2 Each Volume shall be clearly identified and shall begin at the top of a page.
- Offerors shall input their administrative information (e.g., Offeror Name, CAGE Code) in the designated unlocked cells and shall only input pricing data into the unlocked PROPOSED UNIT PRICE cells.
- L.4.4.3 - Commitment to Small Business The Offeror shall include a written statement of its established procedures to ensure timely payments to small business subcontractors in accordance with FAR 52.219-8, Utilization of Small Business Concerns (For those contracts under which it was required within the past three years om the closing date of this solicitation).
- Any pages over the maximum page limit for Volume 1 will not be considered in the evaluation.
- The title page, tables of contents, acronym lists, or index will not be counted against the maximum page limit. b.
- The font used shall not be less than 12 point.
- Font smaller than 12 point is ONLY acceptable in graphics, sketches, tables, charts, price matrix etc. but must be at least 8 point.
- This index shall not count against the page limitation for the technical factor proposal.
- Quality Manual submission will NOT count towards the maximum page limits.
- For clarify purposes, Offerors are required to clarify identify the corresponding changes in Offeror's proposal (e.g., use track changes to show date, vertical line in margin, bold and/or underline).
Requirements
| ID | Requirement |
|---|---|
| R1 | Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. |
| R2 | Offerors are cautioned to ensure their proposal is fully complete, including all fill-ins and blanks in the RFP. Any Offeror submitting a proposal agrees by submission that their proposal and the prices contained therein will be valid for 240 days after receipt of final proposals.Section A |
| R3 | The Offeror shall submit a completed Attachment 0001 - Price Matrix as found in section J. The pricing submitted in the Price Matrix shall be fully executable by the U.S. Government at the unit prices and quantity range limit specified in the Price Matrix. Prices are FOB Origin. Separately priced FAT CLINS shall also be completed for each item.Section M (evaluation factors) |
| R4 | A First Article Test (FAT) is required. FAT is due ninety (90) days after the date of contract. FAT instructions are listed within the CLIN detail under FAT CLINS 1001, 1002, 1003, 3001, 3002, and 3003.Section M (evaluation factors) |
| R5 | Contractors must be registered in the System for Award Management (SAM) in order to eligible for an award with the U.S Government. Application to this site can be found under the following link: www.sam.gov. failure to comply with SAM registration may deem a quote ineligible for award.Section M (evaluation factors) |
| R6 | Please provide your CAGE codeSection M (evaluation factors) |
| R7 | Please provide your DUNS numberSection M (evaluation factors) |
| R8 | Please provide your SAM unique Entity Identification (UEI) code.Section M (evaluation factors) |
| R9 | Contract and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information center Interstate Identification Index (NCICIII) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.Section M (evaluation factors) |
| R10 | Contractors must have a SAM.Gov account prior to accessing any TDP(s). You may request the drawings however, due to export restrictions, you must first be certified with US/Canada Joint Certification Program and obtain a certified DD Form 2345.Section M (evaluation factors) |
| R11 | Drawings are to be handled and distributed in accordance with DoDI 5200.48, DoDI 5230.24, DoDD 5230.25 and DoDI 2040.02' Any distribution of individual drawings to potential subcontractors shall be only to Qualified Contractors as specified in DoDD 5230.25 with a current DLA certified DD form 2345s and shall include the required 'NOTICE TO ACCOMPANY THE DISSEMINATION OF EXPORT-CONTROLLED TECHNICAL DATA' of DoDD 5230.25.Section M (evaluation factors) |
| R12 | Destruction Notice - Destroy by any means approved for destroying classified information or by any other means making the information unreadable, indecipherable, and unrecoverable, such as those identified in NIST SP 800-88 and in accordance with section 2002.14(f) of title 32, CFR. Destruction by unsuccessful bidders should occur immediately after notification of an unsuccessful bid, while successful bidders should destroy provided documents upon completion of their contract.Section M (evaluation factors) |
| R13 | Proposed firm-fixed unit prices are limited to two decimal places. All prices shall be stated in current U.S. dollars and cents for all ordering periods listed in the Price Matrix.L.4.3.1 |
| R14 | The proposal shall contain: L.4.3.2.1 An electronic copy in Microsoft Excel of the completed Price Matrix (Attachment 1). L.4.3.2.2 An addendum to explain any assumptions or other additional information considered necessary to explain the proposed pricing.L.4.3.2 |
| R15 | The Offeror shall enter its full name in the space provided. The Offeror shall enter unit prices for each cell in the spaces provided for Contractor fill-in. No other information is to be added to the Price Matrix, nor shall Offerors make any changes to the Price Matrix.L.4.3.3.2 |
| R16 | Each Offeror shall provide the information as required by this solicitation (including all attachments and exhibits) in the proper format as described in paragraph L.3. Proposals that do not contain all the information requested in the solicitation risk being determined unacceptable by the U.S. Government.L.1 |
| R17 | Proposals shall be specific, complete and address each of the designated requirements listed below. The proposal must not merely repeat the solicitation requirements but rather must provide documentary evidence explaining how contract requirements will be met by the Offeror.L.1 |
| R18 | the complete proposal shall be electronically submitted to the Contracting Officer, or their representative no later than the due date and time specified in the solicitation, to include any subsequent amendments. Proposals submitted by mail or hand-carried will not be evaluated. Proposals shall be submitted electronically to Michelle.m.lund3.civ@army.mil and michelleann.g.hulett.civ@army.mil. Electronic mail proposal submissions shall not exceed a size limit of 10MB (multiple emails may be utilized to complete the proposal submission).L.1 |
| R19 | The proposal shall be submitted in the English language and include all of the following: a. One completed signed electronic copy of the complete Solicitation, Standard Form 33 (DF33) and continuation sheets (Section A through M) and acknowledgement of all amendments. The solicitation and amendment(s) must be signed by an individual authorized to bind the Offeror.L.2 |
| R20 | Offerors are direct to thoroughly read the solicitation and fill in information on all appropriate clauses as stated in the solicitation. Specifically, the following clauses/attachments, which require fill-in information, but are not limited to : Attachment 0001 - Price Matrix Attachment 0003 - Past Performance Questionnaire Attachment 0004 - Small Business Participation Factor Section I, Clause 52.219-28 Section K, clause 52.204-24 Section K, Clause 52.209-7 Section K, Clause 52.225-18 Section K, Clause 252.204-7017. For any fill-ins that are no applicable, the Offeror must acknowledge by indicating N/A.L.2 |
| R21 | The proposal volumes, as reflected in L.3.1, shall be compiled using the Portable Document Format (.pdf).Section K (representations) |
| R22 | The Offeror's proposal shall be made valid for 240 days after the close of the RFP.Section K (representations) |
| R23 | Each proposal shall be submitted in separate volumes as set forth below. Each volume shall be numbered sequentially beginning at page one. a. Volume I- Technical Factor: Page Limit-100 pages... b. Volume II- Past Performance Factor: Cover: Solicitation Number, Offeror Name, CAGE, and DUNS-One Page limit... Section 2: Relevant Delivery and Quality Performance Narratives-Limited to two pages maximum for each reference... c. Volume III-Price Factor... d. Volume IV - Small Business Participation Factor... e. Volume V-Acknowledgements and signaturesL.3 |
| R24 | Volume I, Technical factor proposal, shall have a separate index, which contains narrative titles, which are crossed-referenced to the applicable RFP Requirement.L.4 |
| R25 | The Offeror shall provide a detailed manufacturing plan describing the method by which the Offeror intends to produce, inspect, package, and deliver the M82 Booster-Burster Assembly, Slider Assembly, Delay Assembly. This should include information as to whether the Offeror will manufacture the end item and materials/components in house, or a subcontractor will supply them in accordance with the Technical Data Package (TDP) and solicitation requirements. The manufacturing plan (MP) shall provide an operational flow chart, process map and a description of each operation and procedure that details how the components and assemblies will be produced. The Offeror shall include the cycle times, expected downtime, changeover times, and net rates for each operation. The offeror shall discuss expected scrap rates that will be incurred in producing the components.L.4.1.1 |
| R26 | The Offeror shall identify the key process parameters and any potential problem areas or risks of the manufacturing process operations shown in the proposal as well as any other adverse manufacturing events, resource shortages, raw material shortage, managing supply chain, and unscheduled process interruptions. The Offeror shall also describe, in detail, how it proposes to mitigate these risks and prepare for contingencies. All sub-contracted work (if any) shall be discussed in the same detail as in-house production.L.4.1.1 |
| R27 | The Offeror shall provide a detailed description and processes of proposed assembly line, including but not limited to test, inspection and build for all major assemblies, subassemblies, and parts to meet solicitation requirements. The MP shall also identify the locations of the engineering, manufacturing, and test facilities (either at the Offeror's location or a potential subcontractor location). The MP shall also describe the facilities for storage and vendor materials, including storage capacity, and environmental controls. The Offeror shall indicate which facilities and equipment are not currently owned or leased by the Offeror and indicate plans for obtaining the facilities and equipment.L.4.1.1 |
| R28 | The Offeror shall submit its General Quality Manual, which shall include a description of the Offeror's quality program. The general Quality Manual must provide objective evidence that the Offeror's quality program complies with the requirements of the solicitation listed in FAR 52.264-11, Higher Level Contract Quality Requirement.L.4.1.2 |
| R29 | The offeror shall supply a detailed description of their Quality Management System to include objective evidence, such as independent certifications, that the Offeror's quality program meets the requirements of ISO 9001:2015. In the event the Offeror proposes the use of a quality system other than that specified by ISO 90001:2008, the Offeror should describe the degree to which the proposed system is equivalent to and in compliance with ISO 90001:2015. If the Offeror is not currently compliant with ISO 9001:2008 requirements, the Offeror shall describe their plan to become compliant, including a schedule with milestones compared to the major milestones of the contract.L.4.1.2 |
| R30 | The Offeror shall supply a detailed description of the processes for control of key parameters to meet the requirements (including but not limited to performance and reliability) of the solicitations.L.4.1.2 |
| R31 | The offeror shall supply a description of quality methods and processes to ensure control of all requirements for the Booster-Burster Assembly.L.4.1.2 |
| R32 | The Offeror shall supply a detailed description of the processes for detection, segregation, and handling of non-conforming material.L.4.1.2 |
| R33 | The offeror shall describe the process by which the Quality System's requirements will be flown down to subcontractors and how the Offeror shall verify subcontractor compliance to the contractual quality requirements.L.4.1.2 |
| R34 | The Offeror shall provide a detailed description of the quality plan proposed to control and verify the requirements contained in this solicitation. The proposal should fully identify the inspections to be performed and their frequency. In addition, a complete description of all relevant inspection equipment including expected cycle times and downtime for each operation and major inspection equipment. The Offeror shall identify plans and concepts for process control including inspection equipment, methods, inspection points and frequency for dimensional inspections.L.4.1.2 |
| R35 | The Offeror shall submit a plan that details how to identify and prevent the occurrence of critical defects and how the Offeror can identify, notify, and recover from an occurrence of a critical defect during production.L.4.1.2 |
| R36 | The Offeror shall provide a detailed Program Management Plan Presented as a Gantt chart or a similar timeline visualization. The schedule must illustrate all major tasks, activities, and milestones, including their planned durations, dependencies, and logical sequencing. The timeline must cover the entire five-year Period of Performance, beginning from the date of contract award.L.4.1.3 |
| R37 | The Offeror shall identify all significant programmatic and technical risks and, for each risk, provide a detailed mitigation strategy and a corresponding contingency plan. The Offeror shall also identify all proposed Key Personnel and, for each individual, detail their specific qualifications and relevant experience that demonstrate their ability to successfully execute the project.L.4.1.3 |
| R38 | The Offeror provide details on all system management, business processes, and plans to control technical, cost, and schedule risk. The details should include a description of each appropriate system and whether it is already in use or propose new system, and if so, when it will be available. The plan should describe the required levels of engineering, hardware and resources, including risk management to ensure a production run that meets all solicitation.L.4.1.3 |
| R39 | Property Management Plan-The Offeror shall submit its Written Property Management Plan in accordance with Attachment 0002 and FAR 52.245-1, Government property.L.4.1.3 |
| R40 | The Offeror shall submit a detailed delivery schedule that is both clear and realistic. The schedule must outline all key milestones and demonstrate the Offeror's ability to meet the proposed delivery date(s).L.4.1.4 |
| R41 | The Offeror must complete the PPQ, Attachment 003, Sections IIA and IIB for each contract reference and send copies of the PPQ to the respondent(s) POC as identified in IIA. The Offeror shall include these documents in Volume II, Section 1 of the proposal. If the Offeror fails to provide proof of submission of the PPQ in volume II, Section 1 in the proposal, then the Offeror(s) Proposal shall be deemed non compliant.L.4.2 |
| R42 | The Offeror shall provide a descriptive relevant delivery and quality performance narrative of each submitted contract reference submitted in Section 1 that describes the objects of the contracted work effort detailing how the requirements are relevant to the requirements of this solicitation. Product Part Numbers and applicable National Sock Numbers (NSNs) shall be listed. The narrative shall include the average monthly and yearly contracted delivery quantities. The narrative shall also include how the Offeror managed their quality systems, and how the quality plan controlled and verified the requirements. The narrative description shall not exceed the two-page maximum for each contract reference.L.4.2 |
| R43 | In addition to the contract references, the Offeror shall identify every recent and relevant contract that it was awarded that encountered any performance problems... The Offeror shall also identify every recent and relevant contract that was terminated for default or cause, in whole or in part, within the past three years of issuance of this solicitation... IF there are no contracts meeting the descriptions of L.4.2.5 the Offeror must state as such.L.4.2 |
| R44 | The Offeror shall complete the Small Business Participation Plan, Attachment 0004, to show maximum practicable opportunities to small businesses to compete on this requirement in accordance with FAR 52.219-8, Utilization of Small Business Concerns.L.4.4 |
| R45 | For Other than Small Business ONLY - Compliance with terms and conditions of FAR 52.219-9, Small Business Subcontracting Plan (If required on recent contracts). The Other than Small Business Offerror shall provide three Individual Subcontracting Reports (ISRs) not required in any recent contracts, the Offeror shall so state. If the Offeror has less than three recent contracts, the Offeror shall provide the most recent ISR for each contract it has, and state that the Offeror does not have three recent contracts.L.4.4 |
Recent awards in NAICS 332993
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-08-12 | ACCURATE ENERGETIC SYSTEMS, LLCDepartment of the Army · TNT SUPP CHARGES DELIVERY ORDER | $1.79 million |
| 2026-08-03 | DAY & ZIMMERMANN LONE STAR LLCDepartment of the Army · GRENADES CONSOLIDATION CONTRACT (GCC) DELIVERY ORDER (DO) 6 FOR M67 FRAGMENTATION HAND GRENADES (NSN 1330-01-563-0592), M228 PRACTICE HAND GRENADES (NSN 1330-01-567-6575), AND M201A1 HAND GRENADE FUZE | $20.99 million |
| 2026-07-30 | NORTHROP GRUMMAN SYSTEMS CORPORATIONDepartment of the Army · CONTRACT W519TC-24-D-0007, DO W519TC-26-F-0171 IS EXECUTED TO AWARD A QUANTITY OF 659,392 EACH 20MM PGU-27A/B TP BP CARTRIDGES, DEPARTMENT OF DEFENSE IDENTIFICATION CODE (DODIC): AA24, NATIONAL STOCK | $12.97 million |
| 2026-07-30 | GENERAL DYNAMICS ORDNANCE & TACTICAL SYSTEMS, INC.Department of the Army · LW30 M848 DUMMY CARTRIDGES AWARD | $4.57 million |
| 2026-07-27 | GENERAL DYNAMICS ORDNANCE & TACTICAL SYSTEMS, INC.Department of the Army · QUANTITY OF 214,184 EACH 20MM PGU-28A/B SEMI-ARMOR PIERCING HIGH EXPLOSIVE INCENDIARY (SAPHEI) BULK PACK (BP) CARTRIDGES, DEPARTMENT OF DEFENSE IDENTIFICATION CODE (DODIC): AA22, NATIONAL STOCK NUMBER | $8.46 million |
| 2026-07-27 | GRAHAM TECHNOLOGIES LLCDepartment of the Air Force · F-15, FOREIGN MILITARY SALES, QATAR PROGRAM | $785,257 |
Source: USAspending.gov, retrieved 2026-11-18. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.