TenderAxiom

TenderAxiom · Opportunities

M82 Energetics: requirements and submission rules

63 requirements and 15 submission rules found in the solicitation documents for W519TC-27-R-A003. Use them as the start of your compliance matrix.

Solicitation number
W519TC-27-R-A003
Agency
DEPT OF DEFENSE / DEPT OF THE ARMY / AMC / ACC / ACC-CTRS / ACC RI / W6QK ACC-RI
NAICS
332993
Set-aside
No Set aside used
Responses due
18 December 2026 (20 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1.
  • Contract Specialist: MichelleAnn Hulett, michelleann.g.hulett.civ@army.mil L.1.3 the complete proposal shall be electronically submitted to the Contracting Officer, or their representative no later than the due date and time specified in the solicitation, to include any subsequent amendments.
  • (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the W519TC27RA003 Page 72 of 154
  • As a requirement under this solicitation, all Offerors must submit Representations/Certifications data into the System for Award Management (SAM) Database at https://www.sam.gov/.
  • Any Offeror that has previously submitted Representations/Certified data in SAM are reminded to update the data prior to submitting its proposal and shall ensure its records are not expired. g.
  • New/changed information shall be identified by a vertical line in the margin next to the change or addition and by using redline and strikeout features.
  • Contractor questions regarding the solicitation and drawings are due no later than 27 November 2026 at 3:00 pm CST, to ensure that all questions can be answered and posted for all Offeror's knowledge prior to solicitation closing.
  • Proposals are to be submitted no later than 3:00PM CST on 18 December 2026.
  • (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
  • Volume V-Acknowledgements and signatures This volume shall contain one completed signed electronic copy of the complete solicitation, SF33, and continuation sheets (Section A through M) and acknowledgement of all amendments (see Section L.5) L.3.2 Each Volume shall be clearly identified and shall begin at the top of a page.
  • Offerors shall input their administrative information (e.g., Offeror Name, CAGE Code) in the designated unlocked cells and shall only input pricing data into the unlocked PROPOSED UNIT PRICE cells.
  • L.4.4.3 - Commitment to Small Business The Offeror shall include a written statement of its established procedures to ensure timely payments to small business subcontractors in accordance with FAR 52.219-8, Utilization of Small Business Concerns (For those contracts under which it was required within the past three years om the closing date of this solicitation).
  • Any pages over the maximum page limit for Volume 1 will not be considered in the evaluation.
  • The title page, tables of contents, acronym lists, or index will not be counted against the maximum page limit.
  • The font used shall not be less than 12 point.

Requirements

IDRequirement
R1All Offerors are required to complete a Small Business Participation Plan. Offerors should propose the level of participation of small businesses (as a small business prime and/or small business subcontractors) in the performance of the acquisition relative to the goals set forth in the evaluation of this area.
R2Check the applicable size and categories for the PRIME Offeror only – Check all applicable boxes: ( ) Other than Small Business Prime Or ( ) Small Business Prime, also categorized as a ( ) Small Disadvantaged Business (SDB) ( ) Women-Owned Small Business (WOSB) ( ) Historical Underutilized Business Zone (HUBZone) Small Business ( ) Veteran-Owned Small Business (VOSB) ( ) Service-Disabled Veteran-Owned Small Business (SDVOSB)
R3Submit the total combined percentage of work to be performed by Other than Small Businesses, and Small Businesses (include the percentage of work to be performed both by Prime and Subcontractors). Percentages are to be based on total contract value, including options... When combined, Other than Small, and Small Business totals must equal 100%... When combined, Prime and Subcontracted totals must equal 100%
R4Please indicate the total percentage of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories shall be counted in each category
R5List principle supplies/services to be performed by Small Businesses: Name of Company Identify Type of Service/Supply
R6Offerors are cautioned to ensure their proposal is fully complete, including all fill-ins and blanks in the RFP. Any Offeror submitting a proposal agrees by submission that their proposal and the prices contained therein will be valid for 240 days after receipt of final proposals.Section A
R7Price Matrix - The Offeror shall submit a completed Attachment 0001 - Price Matrix as found in section J. The pricing submitted in the Price Matrix shall be fully executable by the U.S. Government at the unit prices and quantity range limit specified in the Price Matrix. Prices are FOB Origin. Separately priced FAT CLINS shall also be completed for each item.Section M (evaluation factors)
R8Contractors must be registered in the System for Award Management (SAM) in order to eligible for an award with the U.S Government... failure to comply with SAM registration may deem a quote ineligible for award.Section M (evaluation factors)
R9Please provide your CAGE code... Please provide your DUNS number... Please provide your SAM unique Entity Identification (UEI) code.
R10Contract and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information center Interstate Identification Index (NCICIII) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and proceduresSection M (evaluation factors)
R11Contractors must have a SAM.Gov account prior to accessing any TDP(s). You may request the drawings however, due to export restrictions, you must first be certified with US/Canada Joint Certification Program and obtain a certified DD Form 2345... Once certified, the data custodian listed on your company's certified DD Form 2345 must submit the request for TDP access in FBO using the link provided. The data custodian must also be the one to complete the Non-Disclosure Agreement.Section M (evaluation factors)
R12Drawings are to be handled and distributed in accordance with DoDI 5200.48, DoDI 5230.24, DoDD 5230.25 and DoDI 2040.02' Any distribution of individual drawings to potential subcontractors shall be only to Qualified Contractors as specified in DoDD 5230.25 with a current DLA certified DD form 2345s and shall include the required 'NOTICE TO ACCOMPANY THE DISSEMINATION OF EXPORT-CONTROLLED TECHNICAL DATA' of DoDD 5230.25.Section M (evaluation factors)
R13Destruction Notice - Destroy by any means approved for destroying classified information or by any other means making the information unreadable, indecipherable, and unrecoverable, such as those identified in NIST SP 800-88 and in accordance with section 2002.14(f) of title 32, CFR. Destruction by unsuccessful bidders should occur immediately after notification of an unsuccessful bid, while successful bidders should destroy provided documents upon completion of their contract.Section M (evaluation factors)
R14The delay detonator shall not be exposed to the atmosphere for more than 8 hours. Delay assemblies shall be stored in humidity controlled containers prior to packaging and shipment. Delay assemblies shall be prepared for shipment in containers which comply with the Code of Federal Regulations (49CFR) and the rules and regulations applicable to the mode of transportation. Number 2 unit or Number 4 unit size desiccant per MIL-D-3464 shall be placed inside each container. In addition, each intermediate carton, set-up box or comparable container, after blunting corners, shall be placed in a water-and-vapor-proof bag manufactured in accordance with Type I, Class E of MILDTL- 117. All excess air shall be exhausted from within the bag and the bag then sealed. The box/container shall not be deformed when the bag is sealed. The seal shall be located at the top edge of the bag to provide for a minimum of two subsequent seals, if required. The seal shall comply with the heat seal requirements of MIL-STD-2073-1E.Section B
R15The total weight for each box/container should not exceed 37 lbs and should be sized ergonomic for handling. Boxes will be marked with the following information (at a minimum): NSN, nomenclature and drawing, Qty per box, lot number and vendor name.Section B
R16CLIN 0001 Booster Burster Assembly produced in accordance with Drawings: 13-19-154_RevH dated 12-01-20 13-19-156_RevF dated 12-01-20 13-19-168_RevK dated 21-04-22 13-19-170_RevH dated 25-06-10 13-19-200_RevE dated 10-12-15 13-19-201_RevE dated 10-12-13 136-33-14_RevC dated 15-03-24 136-33-15_RevC dated 15-03-24
R17CLIN 0002 Delay Assembly shall be produced in accordance with Drawings: 13-19-149_RevE dated 11-08-05 13-19-155_RevF dated 15-03-24 13-19-165_RevK dated 21-11-18 13-19-171_RevM dated 21-09-03 13-19-198_RevG dated 12-01-23 13-19-202_RevE dated 10-12-13 13-19-203_RevE dated 11-05-26 13-19-204_RevE dated 10-12-13 13-19207_RevE dated 21-09-03 13-19-338_RevD dated 12-01-23
R18CLIN 0003 Slider Assembly is to be produced in accordance with Drawings: 13-19-152RevF dated 10-12-13 13-19-167RevF dated 10-12-15
R19LOT NUMBERING: Containers shall be clearly marked in accordance with MIL-STD-1168.Section D
R20PACKAGING (PRESERVATION/PACKING/MARKING): Containers shall be clearly marked, at a minimum, with the information as follows: a. Name of contractor b. Contract / Purchase Order Number c. Description of items contained therein d. Lot / Batch Number(s)Section D
R21The Department of War (DoW) preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-41-, MIL-STD-1235 and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.Section E
R22The Contractor is required to perform all required measurements for all components and prepare a FAT Report detailing all of the measured inspections. Every requirement of every drawing and specification must be measured and reported. Also, all material certifications along with Certificates of Analyses are to be included in the FAT Report. All FAT units will be individually marked for identification purposes, and the accompanying FAT Report will list each unit along with all required drawing and/or specification requirements. The FAT Report along with the identified FAT units will be presented to the government for verification purposes at the time of the FAT.Section E
R23For those material(s) identified below, a Certificate of Compliance (COC) shall be made available to the Government Quality Assurance Representative (QAR). The COC shall address compliance with all applicable requirements of the material specification(s) listed below... The COC shall contain the following: a. Name and address of supplier. b. Purchase Order/Contract Number. c. Identification of material by specification, revision, amendment and dates, together with type, grade, size etc. d. Quantity of material. e. Date, signature, and title of the authorized representative of the contractor that is attesting to the accuracy of the report content.Section E
R24The Contractor shall comply with the higher-level quality standard(s) listed below. ISO 9001:2015... The Contractor shall include applicable requirements of the higher-level quality standard(s)... and the requirement to flow down such standards, as applicable, to lower-tier subcontractsSection E
R25A First Article Test (FAT) is required. FAT is due ninety (90) days after the date of contract.Section M (evaluation factors)
R26Initial delivery of production quantity is due 120 days after FAT Approval (AFATA).Section M (evaluation factors)
R27Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.Section H (special requirements)
R28In accordance with FAR clause 52.245-1 (b) Property management, the Contractor shall have internal controls to manage (control, use, preserve, protect, repair and maintain) Government property in its possession accountable to the contract... Offerors shall provide a written plan detailing its internal controls to manage Government property in its possession, to include the use of appropriate net-centric electronic applications that are required for Government-Furnished Property (GFP). The Offeror's property management plan must address all desired outcomes in FAR clause 52.245-1(f)(1), Contractor plans and systems, separately and specifically.Section H (special requirements)
R29Submission of the contractor's Property Management System (PMS) Procedure shall be made in accordance with CDRL A00X no later than thirty days after award to the Property Administrator for review/concurrence and final approval by the Contracting Officer. Any proposed changes to the contractor's processes shall be submitted to the Property Administrator for review/concurrence and final Contracting Officer approval prior to implementation of the changes.Section H (special requirements)
R30At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.Section I (contract clauses)
R31The Contractor shall submit the first article test report within See CLINs calendar days from the date of this contract to The PCO marked 'FIRST ARTICLE TEST REPORT: Contract No. See CLINs, Lot/Item No. See CLINs.'Section I (contract clauses)
R32The Contractor shall provide a unique item identifier for... CLIN 0001 Slider Assembly, CLIN 0002 Delay Assembly, CLIN 0003 Booster-Burster... The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022
R33The Contractor shall comply with the requirements of DoD Manual 5100.76, as specified in the statement of work... The Contractor shall notify the cognizant DCSA field office of any subcontract involving AA&E within 10 days after award of the subcontract.Section I (contract clauses)
R34Offerors shall examine each part and provide the requested information in order to determine Cost Accounting Standards (CAS) requirements applicable to any resultant contract... Any offeror submitting a proposal which, if accepted, will result in a contract subject to the requirements of 48 CFR chapter 99 must, as a condition of contracting, submit a Disclosure Statement as required by 48 CFR 9903.202.Section K (representations)
R35The offeror shall check 'yes' below if the contract award will result in a required or unilateral change in cost accounting practice, including unilateral changes requested to be desirable changes. [ ] Yes [ ] No. If the offeror checked 'Yes' above, the offeror shall- (1) Prepare the price proposal in response to the solicitation using the changed practice for the period of performance for which the practice will be used; and (2) Submit a description of the changed cost accounting practice to the Contracting Officer and the Cognizant Federal Agency Official as pricing support for the proposal.
R36For Freight Classification Purposes, Offeror Describes This Commodity as ____.Section K (representations)
R37The Offeror represents that it [ ] does, [ ] does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.Section K (representations)
R38If the Offeror has represented in paragraph (d) of this provision that it 'will provide covered defense telecommunications equipment or services,' the Offeror shall provide the following information as part of the offer: (1) A description of all covered defense telecommunications equipment and services offered... (2) An explanation of the proposed use... (3) For services, the entity providing the covered defense telecommunications services... (4) For equipment, the entity that produced or provided the covered defense telecommunications equipmentSection K (representations)
R39Each proposal shall be submitted in separate volumes as set forth below. Each volume shall be numbered sequentially beginning at page one. a. Volume I- Technical Factor: Page Limit-100 pages... b. Volume II- Past Performance Factor... c. Volume III-Price Factor... d. Volume IV - Small Business Participation Factor... e. Volume V-Acknowledgements and signaturesL.3
R40Volume I, Technical factor proposal, shall have a separate index, which contains narrative titles, which are crossed-referenced to the applicable RFP Requirement. This index shall not count against the page limitation for the technical factor proposal. All information shall be specific to the: a. Booster-Burster Assembly b. Slider Assembly c. Delay Assembly
R41The Offeror shall provide a detailed manufacturing plan describing the method by which the Offeror intends to produce, inspect, package, and deliver the M82 Booster-Burster Assembly, Slider Assembly, Delay Assembly. This should include information as to whether the Offeror will manufacture the end item and materials/components in house, or a subcontractor will supply them in accordance with the Technical Data Package (TDP) and solicitation requirements. The manufacturing plan (MP) shall provide an operational flow chart, process map and a description of each operation and procedure that details how the components and assemblies will be produced. The Offeror shall include the cycle times, expected downtime, changeover times, and net rates for each operation. The offeror shall discuss expected scrap rates that will be incurred in producing the components.L.4.1.1
R42The Offeror shall identify the key process parameters and any potential problem areas or risks of the manufacturing process operations shown in the proposal as well as any other adverse manufacturing events, resource shortages, raw material shortage, managing supply chain, and unscheduled process interruptions. The Offeror shall also describe, in detail, how it proposes to mitigate these risks and prepare for contingencies. All sub-contracted work (if any) shall be discussed in the same detail as in-house production.L.4.1.1
R43The Offeror shall provide a detailed description and processes of proposed assembly line, including but not limited to test, inspection and build for all major assemblies, subassemblies, and parts to meet solicitation requirements. The MP shall also identify the locations of the engineering, manufacturing, and test facilities (either at the Offeror's location or a potential subcontractor location). The MP shall also describe the facilities for storage and vendor materials, including storage capacity, and environmental controls. The Offeror shall indicate which facilities and equipment are not currently owned or leased by the Offeror and indicate plans for obtaining the facilities and equipment.L.4.1.1
R44The Offeror shall submit its General Quality Manual, which shall include a description of the Offeror's quality program. The general Quality Manual must provide objective evidence that the Offeror's quality program complies with the requirements of the solicitation listed in FAR 52.264- 11, Higher Level Contract Quality Requirement.L.4.1.2
R45The offeror shall supply a detailed description of their Quality Management System to include objective evidence, such as independent certifications, that the Offeror's quality program meets the requirements of ISO 9001:2015. In the event the Offeror proposes the use of a quality system other than that specified by ISO 90001:2008, the Offeror should describe the degree to which the proposed system is equivalent to and in compliance with ISO 90001:2015. If the Offeror is not currently compliant with ISO 9001:2008 requirements, the Offeror shall describe their plan to become compliant, including a schedule with milestones compared to the major milestones of the contract.L.4.1.2
R46The Offeror shall supply a detailed description of the processes for control of key parameters to meet the requirements (including but not limited to performance and reliability) of the solicitations.L.4.1.2
R47The offeror shall supply a description of quality methods and processes to ensure control of all requirements for the Booster-Burster Assembly.L.4.1.2
R48The Offeror shall supply a detailed description of the processes for detection, segregation, and handling of non-conforming material.L.4.1.2
R49The offeror shall describe the process by which the Quality System's requirements will be flown down to subcontractors and how the Offeror shall verify subcontractor compliance to the contractual quality requirements.L.4.1.2
R50The Offeror shall provide a detailed description of the quality plan proposed to control and verify the requirements contained in this solicitation. The proposal should fully identify the inspections to be performed and their frequency. In addition, a complete description of all relevant inspection equipment including expected cycle times and downtime for each operation and major inspection equipment. The Offeror shall identify plans and concepts for process control including inspection equipment, methods, inspection points and frequency for dimensional inspections.L.4.1.2
R51The Offeror shall submit a plan that details how to identify and prevent the occurrence of critical defects and how the Offeror can identify, notify, and recover from an occurrence of a critical defect during production.L.4.1.2
R52The Offeror shall provide a detailed Program Management Plan Presented as a Gantt chart or a similar timeline visualization. The schedule must illustrate all major tasks, activities, and milestones, including their planned durations, dependencies, and logical sequencing. The timeline must cover the entire five-year Period of Performance, beginning from the date of contract award.L.4.1.3
R53The Offeror shall identify all significant programmatic and technical risks and, for each risk, provide a detailed mitigation strategy and a corresponding contingency plan. The Offeror shall also identify all proposed Key Personnel and, for each individual, detail their specific qualifications and relevant experience that demonstrate their ability to successfully execute the project.L.4.1.3
R54The Offeror provide details on all system management, business processes, and plans to control technical, cost, and schedule risk. The details should include a description of each appropriate system and whether it is already in use or propose new system, and if so, when it will be available. The plan should describe the required levels of engineering, hardware and resources, including risk management to ensure a production run that meets all solicitation.L.4.1.3
R55Property Management Plan-The Offeror shall submit its Written Property Management Plan in accordance with Attachment 0002 and FAR 52.245-1, Government property.L.4.1.3
R56The Offeror shall submit a detailed delivery schedule that is both clear and realistic. The schedule must outline all key milestones and demonstrate the Offeror's ability to meet the proposed delivery date(s).L.4.1.4
R57The Offeror must complete the PPQ, Attachment 003, Sections IIA and IIB for each contract reference and send copies of the PPQ to the respondent(s) POC as identified in IIA. The Offeror shall include these documents in Volume II, Section 1 of the proposal. If the Offeror fails to provide proof of submission of the PPQ in volume II, Section 1 in the proposal, then the Offeror(s) Proposal shall be deemed non compliant.L.4.2
R58The Offeror shall provide a descriptive relevant delivery and quality performance narrative of each submitted contract reference submitted in Section 1 that describes the objects of the contracted work effort detailing how the requirements are relevant to the requirements of this solicitation. Product Part Numbers and applicable National Sock Numbers (NSNs) shall be listed. The narrative shall include the average monthly and yearly contracted delivery quantities. The narrative shall also include how the Offeror managed their quality systems, and how the quality plan controlled and verified the requirements. The narrative description shall not exceed the two-page maximum for each contract reference.L.4.2
R59In addition to the contract references, the Offeror shall identify every recent and relevant contract that it was awarded that encountered any performance problems. For any contract meeting this description, provide the following information: a. Contract number and Order number, if applicable b. NSN c. Part Number d. POC/Contracting Officer to include email addresses and telephone number. e. Provide a copy of any Corrective Action Plan (CAR) or Product Quality Deficiency Report (PQDR) f. State any corrective actions taken to avoid reoccurrence. g. Describe the extent to which the corrective action has been successful, identifying a U.S Government POC who can confirm the success of the corrective measures. h. The Offeror shall identify any violations related to Occupational Safety & Health Administrative (OSHA). i. Federal Legal Settlements or Fines... j. CAGE code/ DUNS k. U.S. Government Contracting Activity, address, and telephone number. l. Contracting Officer's Name and telephone number m. Contracting Officer's Representative name and telephone number, if applicable. n. Contract Type... o. Award Price p. Final or projected final price q. Major/Key subcontractors who performed > 25% of the award... The Offeror shall also identify every recent and relevant contract that was terminated for default or cause, in whole or in part, within the past three years of issuance of this solicitation... IF there are no contracts meeting the descriptions of L.4.2.5 the Offeror must state as such. Failure to include this information or a statement may be a cause for rejection of an Offeror's proposal as incomplete.L.4.2
R60Offerors must propose a firm fixed unit price for every line item. This includes: a. Production Units: For CLINs 0001, 0002, and 0003, for each quantity range shown. b. First Article Test (FAT): For CLINs 1001, 1002, and 1003. c. Option Units: For CLINs 2001, 2002, and 2003 d. Transportation and Delivery Costs... offerors shall exclude all outbound transportation, freight, and delivery costs from their proposed firm-fixed-unit prices.L.4.3
R61The Offeror shall complete the Small Business Participation Plan, Attachment 0004, to show maximum practicable opportunities to small businesses to compete on this requirement in accordance with FAR 52.219-8, Utilization of Small Business Concerns.L.4.4
R62For Other than Small Business ONLY - Compliance with terms and conditions of FAR 52.219-9, Small Business Subcontracting Plan (If required on recent contracts). The Other than Small Business Offerror shall provide three Individual Subcontracting Reports (ISRs) not required in any recent contracts, the Offeror shall so state. If the Offeror has less than three recent contracts, the Offeror shall provide the most recent ISR for each contract it has, and state that the Offeror does not have three recent contracts.L.4.4
R63The offeror shall complete the following checklist, providing location of requested information, or an explanation of why the requested information is not provided. In preparation of the offeror's checklist, offerors may elect to have their prospective subcontractors use the same or similar checklist as appropriate. PROPOSAL ADEQUACY CHECKLISTL.5

Recent awards in NAICS 332993

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-08-03DAY & ZIMMERMANN LONE STAR LLCDepartment of the Army · GRENADES CONSOLIDATION CONTRACT (GCC) DELIVERY ORDER (DO) 6 FOR M67 FRAGMENTATION HAND GRENADES (NSN 1330-01-563-0592), M228 PRACTICE HAND GRENADES (NSN 1330-01-567-6575), AND M201A1 HAND GRENADE FUZE$20.99 million
2026-07-30NORTHROP GRUMMAN SYSTEMS CORPORATIONDepartment of the Army · CONTRACT W519TC-24-D-0007, DO W519TC-26-F-0171 IS EXECUTED TO AWARD A QUANTITY OF 659,392 EACH 20MM PGU-27A/B TP BP CARTRIDGES, DEPARTMENT OF DEFENSE IDENTIFICATION CODE (DODIC): AA24, NATIONAL STOCK $12.97 million
2026-07-30GENERAL DYNAMICS ORDNANCE & TACTICAL SYSTEMS, INC.Department of the Army · LW30 M848 DUMMY CARTRIDGES AWARD$4.57 million
2026-07-27GENERAL DYNAMICS ORDNANCE & TACTICAL SYSTEMS, INC.Department of the Army · QUANTITY OF 214,184 EACH 20MM PGU-28A/B SEMI-ARMOR PIERCING HIGH EXPLOSIVE INCENDIARY (SAPHEI) BULK PACK (BP) CARTRIDGES, DEPARTMENT OF DEFENSE IDENTIFICATION CODE (DODIC): AA22, NATIONAL STOCK NUMBER$8.46 million
2026-07-27GRAHAM TECHNOLOGIES LLCDepartment of the Air Force · F-15, FOREIGN MILITARY SALES, QATAR PROGRAM$785,257
2026-07-17GENERAL DYNAMICS ORDNANCE AND TACTICAL SYSTEMS, INC.Department of the Army · SEE BASE IDIQ CONTRACT.$4.23 million

Source: USAspending.gov, retrieved 2026-11-07. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.