Anchor Plate, Wire R: requirements and submission rules
28 requirements and 13 submission rules found in the solicitation documents for W31P4Q27RA011. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1.
- (d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).
- The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV.
- The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).
- Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO.
- Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO.
- The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below.
- (b) The marking shall include the National Stock Number (NSN), Commercial and Government Entity (CAGE) Code, Part Number, and Nomenclature.
- The Offeror shall indicate which option applies by checking one of the following boxes: [ ] (i) Paragraph (e) applies. [ ] (ii) Paragraph (e) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.
- FAR/DFARS Provision # Title Date Change ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Any changes provided by the Offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.
- (c) Offers submitted in response to this solicitation shall identify, to the extent known at the time an offer is submitted to the Government, the technical data or computer software that the Offeror, its subcontractors or suppliers, or potential subcontractors or suppliers, assert should be furnished to the Government with restrictions on use, release, or disclosure.
- (c) If the offeror deletes or modifies subparagraph (a)(2) above, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
- If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document.
Requirements
| ID | Requirement |
|---|---|
| R1 | Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer. |
| R2 | Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the Government for implementation. |
| R3 | Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings. |
| R4 | Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below. |
| R5 | Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management Agency (DCMA) technical representative. |
| R6 | The Contractor shall mark all items delivered under this contract in accordance with the latest version of MIL-STD-130, "Identification Marking of U.S. Military Property", unless otherwise specified in the contract or technical data package. |
| R7 | Where Item Unique Identification (IUID) is required by DFARS 252.211-7003, the contractor shall provide the IUID mark in accordance with the aforementioned standard and applicable contract attachments. All labels and markings must remain legible and affixed through the normal expected life of the item. |
| R8 | All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo. |
| R9 | All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KDHT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations |
| R10 | All WPM shall include certification/quality markings in accordance with the ALSC standard. |
| R11 | If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. |
| R12 | Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. |
| R13 | Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. |
| R14 | CERTIFICATION: VENDORS MUST HOLD AN ACTIVE CERTIFICATION IN THE JOINT CERTIFICATION PROGRAM (JCP). VERIFICATION IS ACCESSIBLE VIA THE DLA JCP PORTALSection A |
| R15 | ONCE CERTIFIED, INTERESTED DOD CONTRACTORS MUST REQUEST THE tamela.d.riggs.civ@army.mil. DRAWINGS DIRECTLY FROM THE POINT OF CONTACT ATSection A |
| R16 | NOTE: ALL REQUESTS MUST INCLUDE VENDOR'S CAGE CODE FOR VERFICATION.Section A |
| R17 | Mark for Shipment as specified and in accordance with MIL STD 129.Section D |
| R18 | The Contractor shall comply with the higher-level quality standard(s) listed below. ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: OPERATION REQUIREMENTS ONLY (PARAGRAPH 7.1, 7.2, 7.4, 7.5, AND 7.6)Section E |
| R19 | The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontractsSection E |
| R20 | To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.Section G |
| R21 | By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for- ... Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.Section I (contract clauses) |
| R22 | The Contractor shall not deliver any data or software with restrictive markings unless the data are listed on the Attachment.Section I (contract clauses) |
| R23 | The Offeror represents that- (1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed... and (2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.Section K (representations) |
| R24 | For statistical purposes only, the offeror shall indicate whether the place of manufacture of the end products it expects to provide in response to this solicitation is predominantly- (1) [ ] In the United States... or (2) [ ] Outside the United States.Section K (representations) |
| R25 | If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does" provide covered defense telecommunications equipment or services... then the Offeror shall complete the following additional representation... [and disclosures if applicable].Section K (representations) |
| R26 | The Offeror's assertions, including the assertions of its subcontractors or suppliers or potential subcontractors or suppliers, shall be submitted as an attachment to its offer in the following format, dated and signed by an official authorized to contractually obligate the OfferorSection K (representations) |
| R27 | Offerors are invited to state an opinion on whether the quantity(ies) of supplies on which bids, proposals or quotes are requested in this solicitation is (are) economically advantageous to the Government.Section L (instructions to offerors) |
| R28 | Any contract awarded as a result of this solicitation will be [ ] DX rated order; [X] DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR700), and the Contractor will be required to follow all of the requirements of this regulation.Section L (instructions to offerors) |
Recent awards in NAICS 332510
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-07-27 | MOUNT PROSPECTS NORTHWEST ELECTRICAL SUPPLY CO., INC.Missile Defense Agency · PROCUREMENT OF LEGRAND WIREMOLD FLOORSOURCE SERIES PREWIRED RAISED FLOOR POWER BOXES AND LEGRAND WIREMOLD WALKERFLEX CABLE SETS TO BE USED FOR RECONFIGURATION OF OFFICE SPACE IN MDA VON BRAUN III FACI | $102,385 |
| 2026-07-23 | KAMPI COMPONENTS CO INCDefense Logistics Agency · 8512259756!REPAIR KIT,EXHAUST DE-SMOKE T | $899 |
| 2026-07-23 | OSHKOSH DEFENSE LLCDefense Logistics Agency · 4572465527!FENDER,VEHICULAR | $4,689 |
| 2026-07-23 | OSHKOSH DEFENSE LLCDefense Logistics Agency · 4572465525!CHOCK,WHEEL-TRACK | $11,356 |
| 2026-07-23 | OSHKOSH DEFENSE LLCDefense Logistics Agency · 4572465523!SHAFT,SHOULDERED | $32,790 |
| 2026-07-23 | OSHKOSH DEFENSE LLCDefense Logistics Agency · 4572465130!HOOD,ENGINE COMPARTMENT | $54,080 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.