Wiring Harness, Branched: requirements and submission rules
11 requirements and 1 submission rules found in the solicitation documents for SPRTA1-27-R-0025. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Please provide a proposal no later than 4:00 PM CST on 20 November 2026.
Requirements
| ID | Requirement |
|---|---|
| R1 | Please provide your best price and delivery proposal for the part number based on the quantity listed. |
| R2 | Surplus: Surplus is not authorized |
| R3 | Requested Delivery: 30 October 2027 |
| R4 | MARKING IS TO BE PERFORMED IN ACCORDANCE WITH THE LATEST VERSION OF MIL-STD-130 |
| R5 | ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). |
| R6 | CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). |
| R7 | Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. |
| R8 | Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking. |
| R9 | Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158. |
| R10 | New users will need to gain access to the Shipping Instruction Request (SIR) under the PIEE Transportation tile by requesting the appropriate role which will be submitted to the cognizant Government Administrator (GAM) and Contractor Administrator/Account Manager (CAM) to gain systems access, roles, and permissions. |
| R11 | Do not move any freight to a water or aerial port prior to shipping or it will become frustrated. |
Recent awards in NAICS 336413
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-03-31 | BELL BOEING JOINT PROJECT OFFICEDepartment of the Navy · NON-RECURRING ENGINEERING | $19.72 million |
| 2028-02-02 | PARKER-HANNIFIN CORPORATIONDepartment of the Air Force · MANUFACTURING AND REMANUFACTURING OF VALVES, PUMPS, FUEL NOZZLES, SENSORS,INDICATORS, MANIFOLDS, ETC. TO SUPPORT MULTIPLE WEAPONS SYSTEMS INCLUDING B1, F16, C5, KC135, C130, E3, ETC. | $4.02 million |
| 2027-11-01 | ATAP INCDepartment of the Air Force · SOURCING AND ACQUIRING COMMON STOCK EQUIPMENT VIA STRATEGIC REPLENISHMENT CONTRACT(SRC) | $3.57 million |
| 2027-09-13 | GE AVIATION SYSTEMS LLCDepartment of the Air Force · FY26 INDIA SOFTWARE | $55,344 |
| 2027-09-05 | CPI AEROSTRUCTURES INCDepartment of the Air Force · T-38 STRUCTURAL IMPROVEMENT MODIFICATION KITS | $10.68 million |
| 2027-08-31 | BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Department of the Air Force · AFLCMC/WI | $66.85 million |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.