TenderAxiom

TenderAxiom · Opportunities

Cylinder, Assembly, A: requirements and submission rules

46 requirements and 12 submission rules found in the solicitation documents for SPRTA1-27-R-0001. Use them as the start of your compliance matrix.

Solicitation number
SPRTA1-27-R-0001
Agency
DEPT OF DEFENSE / DEFENSE LOGISTICS AGENCY / DLA AVIATION / DLA AVIATION OKLAHOMA CITY / DLA AVIATION AT OKLAHOMA CITY, OK
NAICS
336413
Set-aside
No Set aside used
Responses due
04 December 2026 (6 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the offeror’s proposal.2.6 Proposal SubmissionProposals may be e-mailed or sent by mail to the KO and received by the closing date.
  • If the offeror submits past performance reference for a significant subcontractor, the offeror must submit a consent letter (Attachment (insert number)) executed by each significant subcontractor, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information.
  • IMPORTANT:Contractor is not is required to sign this document and return copies to the issuing office.14.DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.15A.
  • The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https:// www.sam.gov) for entities excluded from receiving federal awards for ‘‘covered defense telecommunications equipment or services’’.(c) Representation.
  • Proposals sent by mail shall be submitted in sealed envelopes or packages addressed to the KO at the address shown on the front page of solicitation.
  • Signature by the offeror on the SF 1447 constitutes an offer which the Government may accept.Section B – Supplies or Services and Costs/PricesAll pricing information shall be addressed in Section B – The Schedule of the solicitation.
  • Results of the PAS (if conducted) will be evaluated to determine each offeror's capability to meet the requirements of the solicitation.1.8 Solicitation Requirements (Terms and Conditions)Offerors are required to meet all solicitation requirements, such as terms and conditions, and representations and certifications, in addition to those identified as factors.
  • The altered mechanical properties or chemical composition must be within specification and be part of the certification data submitted to the government.
  • For each identified effort for a commercial customer, the offeror must also submit a client authorization letter (Attachment (insert number)) authorizing release to the Governmentof requested information on the offeror’s performance.3.4.3 Specific ContentOfferors may explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
  • Submit with First Article Exhibit.Req No / PriRequiredDeliveryA FA8111 1 LO SEE FORM 260ProposedDeliveryA FA8111 1 LOCertificate of ComplianceBid A - First Article RequiredItem No.0001ADFirm Fixed PriceQuantityU/IUnit PriceAmount1 LOCLIN ACRN ACRN Total0001AD ABCERTIFICATE OF COMPLIANCEPriority:RLimitations of Liability: Other Than High Value Item
  • After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to—(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C.
  • Reference Documents: The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as cited in the current issue of the DODISS at the time of the solicitation.

Requirements

IDRequirement
R1Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returningcopies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers.
R2BIDDER/OFFEROR TO COMPLETEBLOCKS 11, 13, 15, 21, 22, and 27
R3Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
R4COMPETITION EXPECTED. Offerors must be approved sources.
R5The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.
R6Contractor's notification to ACO and 423SCMS/GUEATinker.First.Article@us.af.mil of test time and location due 45 days prior to start of testing.
R7Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).
R8The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.) Title Number Date Tailoring ISO 9001-2015 2008
R9The Contractor shall test unit(s) of Lot/Item as specified in this contract. At least 45 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
R10The Contractor shall submit the first article test report within 180 calendar days from the date of this contract to FA8111 marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. 0001AB"
R11The Contractor shall provide a unique item identifier for the following: (i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more... (ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule
R12The Contractor will not engage in any racially discriminatory DEI activities
R13The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.
R14The contractor shall indicate the location where supplies will be inspected, if different from the production location: Commercial and Government Entity (CAGE) code: Address: Applicable to contract line item numbers(s) (CLIN(s)):
R15By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.
R16The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request.
R17The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes.
R18If the Offeror is the prospective awardee and is not currently an approved source cited in the procurement item description (PID) on the schedule page of this solicitation, the Offeror will be requested by the Contracting Officer to provide documented evidence prior to award sufficient to establish that the item being offered is (or will be) the exact item cited in the PID and is (or will be) manufactured by an approved source cited in the PID, modified (if necessary) to conform to any additional requirements set forth in the PID, and is (or will be) manufactured by or under the direction of an approved source cited in the PID.
R19Since the item being acquired is a critical safety item, the Contractor shall immediately provide notification and documentation of the changes to the Contracting Officer when any changes occur in the Contractor’s business status or relationship with the approved source(s) after award of this contract
R20The Contractor shall immediately provide to the Contracting Officer notification (and documentation, if available) of any of the following changes the Contractor becomes aware of: (1) Later revisions to drawings, specifications or standards that differ from the revision cited in the procurement item description (PID) in the contract; (2) Changes in the manufacturing process; (3) A change in the approved source’s manufacturing location; or (4) A transfer of manufacturing facilities by the approved source since last manufacture.
R21Offerors are required to complete electronic annual representations and certifications in SAM accessed via https://www.sam.gov as a part of required registration.
R22In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order.
R23The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS)(https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.
R24If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.
R25If the Offeror represents it is a foreign person in paragraph (d)(1) of this provision, then— (1) The clause at FAR 52.229–12, Tax on Certain Foreign Procurements, will be included in any resulting contract; and (2) The Offeror shall submit with its offer the IRS Form W–14.
R26Bidders who meet the conditions for waiver set forth below shall submit a bid or proposal on Bid/Offer "B" which does notrequire compliance with the First Article Approval provision set forth herein and furnish the following information in the individual solicitation: Contract No. __________________________, Contract Item No. _________, Date of Contract. __________, Name & Address of Government Agency issuing the Contract. Failure to include this information will render the IFB(s) non-responsive and may cause rejection of RFP(s).
R27Bidders/offerors who do not meet the conditions for waiver set forth below shall submit a bid on Bid/Offer, “A” which includes compliance with First Article Approval.
R28By submission of its offer, the Offeror represents that— (i) It will not provide or use a UAS, as described in paragraph (b)(1) of this provision, in the performance of any contract, subcontract, or other contractual instrument resulting from this solicitation; and (ii) It will not provide or use a system for the detection or identification of a UAS, as described in paragraph (b)(2) of this provision, in the performance of any contract, subcontract, or other contractual instrument resulting from this solicitation. (2) It is not an entity described in paragraph (b)(3) of this provision.
R29The offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated in the solicitation and the attachments of the solicitation.
R30The offer shall make a clear statement in the proposal documentation volume that the proposal is valid until this date.
R31The offeror’s proposal shall include a signed copy of the solicitation, Sections A through K, and all other informationdescribed in this section and shown in the table below.
R32Completion of blocks 12, 13, 14, 15, and 27, with name, title, and date included in block 27 of the SF 1447 is required.
R33All pricing information shall be addressed in Section B – The Schedule of the solicitation. Information shall be limited to Contract Line Item Number (CLIN), Sub-CLIN or ELIN level pricing, including unit and extended pricing as specified in Section B.
R34Completion of Inspection and Acceptance clause shall be completed.
R35Complete F.O.B. Origin Clause IAW FAR 47.305(b).
R36Complete Activity Address Clause and if applicable, annotate remittance address within proposal.
R37Complete clauses as applicable to your proposal.
R38the proposal must comply with all aspects of the technical requirements as established by the National Stock Number, Part Number, and accompanying technical data attachments to be eligible for award and be considered technically acceptable in accordance with Section M
R39Provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
R40Provide the mailing address, telephone and fax numbers and facility codes for the cognizant Contract Administration Office, DCAA, and Government Paying Office. Also, provide the name and telephone and fax number for the Administrative Contracting Officer (ACO).
R41Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; size of business (large or small); and labor surplus area designation. This same information must be provided if the work for this contract will be performed at any other location(s). List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subcontractor, and the percentage of work to be performed at each location.
R42Exceptions taken to terms and conditions of this prospective contract, to any of its formal attachments or to other parts of the solicitation shall be identified. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the solicitation.
R43ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC).
R44Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
R45Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
R46Request access to the Procurements Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ on all Defense Contract Management Agency (DCMA Contracts) for FOB: Origin, Foreign Military Sales (FMS), and FOB: Destination OCONUS/Export movements to obtain the appropriate DOD regulatory clearances, shipping documentation and instructions.

Recent awards in NAICS 336413

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2028-03-31BELL BOEING JOINT PROJECT OFFICEDepartment of the Navy · NON-RECURRING ENGINEERING$19.72 million
2028-02-02PARKER-HANNIFIN CORPORATIONDepartment of the Air Force · MANUFACTURING AND REMANUFACTURING OF VALVES, PUMPS, FUEL NOZZLES, SENSORS,INDICATORS, MANIFOLDS, ETC. TO SUPPORT MULTIPLE WEAPONS SYSTEMS INCLUDING B1, F16, C5, KC135, C130, E3, ETC.$4.02 million
2027-11-01ATAP INCDepartment of the Air Force · SOURCING AND ACQUIRING COMMON STOCK EQUIPMENT VIA STRATEGIC REPLENISHMENT CONTRACT(SRC)$3.57 million
2027-09-13GE AVIATION SYSTEMS LLCDepartment of the Air Force · FY26 INDIA SOFTWARE$55,344
2027-09-05CPI AEROSTRUCTURES INCDepartment of the Air Force · T-38 STRUCTURAL IMPROVEMENT MODIFICATION KITS$10.68 million
2027-08-31BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Department of the Air Force · AFLCMC/WI$66.85 million

Source: USAspending.gov, retrieved 2026-11-03. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.