Submission rules that can disqualify a bid
- (c) All proposed part number changes shall be submitted pursuant to the requirements of the requirement entitled," ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, SPRRA127RA0170001 Page 25 of 55
- Whether or not such delay will occur will be solely at the discretion of the Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended.
- If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).
- To be technically acceptable and thus, eligible for award, a proposal must conform to ALL solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements provided within all sections of this solicitation and/or within its attached addenda.
- If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document.
Requirements
| ID | Requirement |
|---|---|
| R1 | NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30. |
| R2 | THIS REQUIREMENT IS LIMITED TO THE BOEING COMPANY (CAGE 8V613) AND WOODWARD HRT, INC. (CAGE 81873), IN ACCORDANCE WITH 10 U.S.C. (S) 3204(A)(1) AND FAR 6.302-1.Section A |
| R3 | BY REPLYING TO THIS SOLICITATION AND SUBMITTING A QUOTATION OR PROPOSAL, THE OFFEROR IS ACKNOWLEDGING ITS ABILITY TO SUPPORT THIS REQUIREMENT FOR THE FULL SOLICITED TIME PERIODSection A |
| R4 | SERIAL NUMBER REQUIREMENT REPORTING (SNRR) MARKINGS ARE REQUIRED.Section A |
| R5 | THE AVIATION MAINTENANCE MANAGEMENT SYSTEM-AVIATION (TAMMS-A) MARKINGS ARE REQUIRED.Section A |
| R6 | REUSABLE CONTAINER PRICE MUST BE INCORPORATED INTO THE UNIT PRICE.Section A |
| R7 | IUID MARKINGS ARE REQUIRED. "THE DFARS CLAUSE 252.211-7003 ITEM IDENTIFICATION AND VALUATION IS INCLUDED IN SECTION F".Section A |
| R8 | FACSIMILE PROPOSALS WILL NOT BE ACCEPTED. ALL PROPOSALS SHALL BE E-MAILEDSection A |
| R9 | THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; THEREFORE, YOU ARE REQUIRED TO SUBMIT OTHER THAN COST AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING DATA IF REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.Section A |
| R10 | THIS IS A DO DPAS RATED ORDER, AND YOU ARE REQUIRED TO NOTIFY DLA WITHIN 15 DAYS OF RECEIPT OF ORDER IF THE RATED ORDER CANNOT BE FULFILLED AS WRITTEN. THIS INCLUDES CONFLICTING RATED ORDER SCHEDULES.Section A |
| R11 | A SUBCONTRACTING PLAN WILL BE REQUIRED.Section A |
| R12 | The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.Section B |
| R13 | Wood Packaging Materials Requirement: ISPM-15 COMPLIANTSection D |
| R14 | The contractor shall comply with the higher-level quality standard titled Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National Standards Institute/American Society for Quality Control (ANSI/ASQC), International Organization for Standardization (ISO) Q9001 :2000, SAE AS9100, or a Department of Defense approved quality system Single Process Initiative (SPI). Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.Section H (special requirements) |
| R15 | Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.Section B |
| R16 | Offerers (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source Approval Request (SAR) package, for review and approval, to the Systems Readiness Directorate (SRO), Aviation and Missile Center, OEVCOM. Source approval must be obtained prior to being considered for contract award.Section B |
| R17 | Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3.Section B |
| R18 | The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract.Section B |
| R19 | The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials.Section B |
| R20 | The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request. The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers' franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-PRO- 010.Section B |
| R21 | The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National Conference of Standards Laboratories (ANSI /NCSL) 2540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment).Section B |
| R22 | If any of the items that are the subject of this procurement are also currently being sold to commercial customers and an FAA Form 8130- 3, Airworthiness Approval Tag, is required to accompany these parts, the offerer shall: a) Identify, in its proposal, these parts; and b) If awarded the contract, provide FAA Form 8130-3 to the Government upon delivery of the parts.Section B |
| R23 | Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO /IEC 163 88 -Information Technology -Automatic Identification and Data Capture Techniques -Bar Code Symbology Specification -Code 39.Section B |
| R24 | The Offeror represents that (1) It [ ] is [ ] is not a foreign person; and (2) If the Offeror indicates "is" in paragraph (d)(1) of this provision, then the Offeror represents that-I am claiming on the IRS Form W-14 [ ] a full exemption, or [ ] partial or no exemption [Offeror must select one] from the excise tax.Section K (representations) |
| R25 | The Offeror shall submit with its offer the IRS Form W-14. If the IRS Form W-14 is not submitted with the offer, exemptions will not be applied to any resulting contract and the Government will withhold a full 2 percent of each payment.Section K (representations) |
| R26 | The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.Section K (representations) |
| R27 | If the Offeror has represented in paragraph (d) of this provision that it "will provide covered defense telecommunications equipment or services," the Offeror shall provide the following information as part of the offer: (1) A description of all covered defense telecommunications equipment and services offered... (2) An explanation of the proposed use... (3) For services, the entity providing the covered defense telecommunications services... (4) For equipment, the entity that produced or provided the covered defense telecommunications equipment...Section K (representations) |
| R28 | For Contractors Using the ProPricer System: The original unedited ProPricer system generated Excel file is hereby requested. In Excel workbook format (.xlsx), provide a ProPricer system generated "detail cost breakdown" report, with "export full pricing" set to "annual". This excel file shall be a full working cost model containing the original columns, formulas, and worksheets only. Do not modify the ProPricer system generated Excel file in any manner. |
| R29 | If an offeror is unable to meet the government's required delivery schedule, the offeror shall clearly state this limitation in its proposal and propose its best realistic alternative delivery schedule. Any proposed alternative delivery schedule must be accompanied by a brief narrative explaining the rationale for the schedule and any potential mitigation strategies to minimize the delay to the government's baseline requirement.Section L (instructions to offerors) |
| R30 | Cost and Pricing Data. Offerors must provide all cost or pricing information required by FAR 15.4. Failure of a proposal to provide cost or pricing information required by FAR 15.4 will result in said proposal being deemed Unacceptable, and thus, ineligible for award.Section M (evaluation factors) |
Recent awards in NAICS 336413
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-03-31 | BELL BOEING JOINT PROJECT OFFICEDepartment of the Navy · NON-RECURRING ENGINEERING | $19.72 million |
| 2028-02-02 | PARKER-HANNIFIN CORPORATIONDepartment of the Air Force · MANUFACTURING AND REMANUFACTURING OF VALVES, PUMPS, FUEL NOZZLES, SENSORS,INDICATORS, MANIFOLDS, ETC. TO SUPPORT MULTIPLE WEAPONS SYSTEMS INCLUDING B1, F16, C5, KC135, C130, E3, ETC. | $4.02 million |
| 2027-11-01 | ATAP INCDepartment of the Air Force · SOURCING AND ACQUIRING COMMON STOCK EQUIPMENT VIA STRATEGIC REPLENISHMENT CONTRACT(SRC) | $3.57 million |
| 2027-09-13 | GE AVIATION SYSTEMS LLCDepartment of the Air Force · FY26 INDIA SOFTWARE | $55,344 |
| 2027-09-05 | CPI AEROSTRUCTURES INCDepartment of the Air Force · T-38 STRUCTURAL IMPROVEMENT MODIFICATION KITS | $10.68 million |
| 2027-07-14 | AMETEK THERMAL SYSTEMS INCDefense Logistics Agency · COOLER, LUBRICATING | $1.06 million |
Source: USAspending.gov, retrieved 2026-11-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.