SPRRA127RA007, PUMP, AXIAL PISTONS: requirements and submission rules
27 requirements and 5 submission rules found in the solicitation documents for SPRRA1-27-R-A007. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1.
- Whether or not such delay will occur will be solely at the discretion of the Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended.
- If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).
- To be technically acceptable and thus, eligible for award, a proposal must conform to ALL solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements provided within all sections of this solicitation and/or within its attached addenda.
- (c) If the offeror deletes or modifies subparagraph (a)(2) above, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
Requirements
| ID | Requirement |
|---|---|
| R1 | OFFER (Must be fully completed by offeror) |
| R2 | THIS REQUIREMENT IS FOR LIMITED SOURCE TO THE BOEING COMPANY, CAGE 77272, EATON AEROSPACE LLC, CAGE 62983, BOEING DISTRIBUTION SERVICES, INC, 2V484, AND JAMAICA BEARINGS CO INC, CAGE 04836 IAW 10 U.S.C. 2304 (C)(1) FAR 6.302-1 (A)(2).Section A |
| R3 | The source and part number of the item the offeror intends to supply must be stated in the offer.Section B |
| R4 | Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source Approval Request (SAR) package, for review and approval, to the Systems Readiness Directorate (SRD), Aviation and Missile Center, DEVCOM. Source approval must be obtained prior to being considered for contract award.Section B |
| R5 | Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.Section B |
| R6 | IUID MARKINGS ARE REQUIRED. "THE DFARS CLAUSE 252.211-7003 ITEM IDENTIFICATION AND VALUATION IS INCLUDED IN SECTION F".Section A |
| R7 | The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.Section B |
| R8 | The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022, Information technology - International symbology specification - Data matrix; ECC200 data matrix specification.Section I (contract clauses) |
| R9 | SUBCONTRACTING PLAN APPLIES TO REQUIREMENTS OVER $950K+ REQUIREMENTS SET ASIDE TO LARGE BUSINESS SOLE SOURCE AND COMPETITIVE ACQUISITIONS "(SUPPLIER NAME)____ APPROVED SUBCONTRACTING PLAN IS HEREBY INCORPORATED BY REFERENCE AND MADE A PART OF THIS CONTRACT."Section A |
| R10 | THIS IS A DO DPAS RATED ORDER, AND YOU ARE REQUIRED TO NOTIFY DLA WITHIN 15 DAYS OF RECEIPT OF ORDER IF THE RATED ORDER CANNOT BE FULFILLED AS WRITTEN. THIS INCLUDES CONFLICTING RATED ORDER SCHEDULES. IF NO RESPONSE IS RECEIVED DURING THE REQUIRED RESPONSE TIME, THE CONTRACTOR SELF-ATTESTS ORDER ACCEPTANCE AS IS.Section A |
| R11 | YOU ARE REQUIRED TO SUBMIT OTHER THAN COST OR PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST OR PRICING DATA IF REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.Section A |
| R12 | Offerors must provide all cost or pricing information required by FAR 15.4. Failure of a proposal to provide cost or pricing information required by FAR 15.4 will result in said proposal being deemed Unacceptable, and thus, ineligible for award.Section M (evaluation factors) |
| R13 | FOR CONTRACTORS USING THE PROPRICER SYSTEM: THE ORIGINAL UNEDITED PROPRICER SYSTEM GENERATED EXCEL FILE IS HEREBY REQUESTED. IN EXCEL WORKBOOK FORMAT (.XLSX) PROVIDE A PROPRICER SYSTEM GENERATED "DETAIL COST BREAKDOWN" REPORT, WITH "EXPORT FULL PRICING" SET TO "ANNUAL". THIS EXCEL FILE SHALL BE A FULL WORKING COST MODEL CONTAINING THE ORIGINAL COLUMNS, FORMULAS, AND WORKSHEETS ONLY. DO NOT MODIFY THE PROPRICER SYSTEM GENERATED EXCEL FILE IN ANY MANNER. EXCEL TABS TO INCLUDE: 1) P-SHEET (NEEDED AT MINIMUM) 2) DIRECT RATES 3) INDIRECT RATES 4) CERS (IF APPLICABLE) 5) CER FACTORS (IF APPLICABLE)Section A |
| R14 | The Contractor shall comply with the higher-level quality standard(s) listed below. ISO 9001:2015 OR EQUIVALENTSection E |
| R15 | The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in- Any subcontract for critical and complex items (see 46.203(b) and (c)); or When the technical requirements of a subcontract require-(i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.Section E |
| R16 | Party to Pay Transportation Cost: Contractor Point Type: DestinationSection F (deliveries) |
| R17 | To access WAWF, the Contractor shall- (1)Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2)Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site. |
| R18 | Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO /IEC 16388 - Information Technology - Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.Section H (special requirements) |
| R19 | The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National Conference of Standards Laboratories (ANSI /NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment).Section H (special requirements) |
| R20 | The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.Section H (special requirements) |
| R21 | Item shall be marked per MIL-STD-130.Section H (special requirements) |
| R22 | Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.Section H (special requirements) |
| R23 | All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.Section B |
| R24 | If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited.Section B |
| R25 | If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does" provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation: The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.Section K (representations) |
| R26 | If the Offeror has represented in paragraph (d) of this provision that it "will provide covered defense telecommunications equipment or services," the Offeror shall provide the following information as part of the offer: (1) A description of all covered defense telecommunications equipment and services offered... (2) An explanation of the proposed use... (3) For services, the entity providing the covered defense telecommunications services... (4) For equipment, the entity that produced or provided the covered defense telecommunications equipment...Section K (representations) |
| R27 | Offerors electing to submit this data must furnish at least the following information: name and address of the contracting entity; the contract number; award and completion dates; the dollar value; the contract type; the items or services provided; two references, with title and phone number; and any problems encountered and the corrective action taken by the offeror.Section M (evaluation factors) |
Recent awards in NAICS 336413
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-03-31 | BELL BOEING JOINT PROJECT OFFICEDepartment of the Navy · NON-RECURRING ENGINEERING | $19.72 million |
| 2028-02-02 | PARKER-HANNIFIN CORPORATIONDepartment of the Air Force · MANUFACTURING AND REMANUFACTURING OF VALVES, PUMPS, FUEL NOZZLES, SENSORS,INDICATORS, MANIFOLDS, ETC. TO SUPPORT MULTIPLE WEAPONS SYSTEMS INCLUDING B1, F16, C5, KC135, C130, E3, ETC. | $4.02 million |
| 2027-11-01 | ATAP INCDepartment of the Air Force · SOURCING AND ACQUIRING COMMON STOCK EQUIPMENT VIA STRATEGIC REPLENISHMENT CONTRACT(SRC) | $3.57 million |
| 2027-09-13 | GE AVIATION SYSTEMS LLCDepartment of the Air Force · FY26 INDIA SOFTWARE | $55,344 |
| 2027-09-05 | CPI AEROSTRUCTURES INCDepartment of the Air Force · T-38 STRUCTURAL IMPROVEMENT MODIFICATION KITS | $10.68 million |
| 2027-08-31 | BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Department of the Air Force · AFLCMC/WI | $66.85 million |
Source: USAspending.gov, retrieved 2026-11-20. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.