F-16 - Circuit Card Assembly: requirements and submission rules
20 requirements and 0 submission rules found in the solicitation documents for SPRHA4-27-R-0034. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | Deviations from specifications identified in drawings or this document are not authorized without prior approval by 416 S CMS/GUEAA Engineering. |
| R2 | Contractors drawings shall be changed or su pplemented by c ontractor for IUID compliance. |
| R3 | Label shall contain all data on existing label, (if existing label is to be replaced), only delete existing label with government engineering permission. |
| R4 | Use HRI (Human Readable) and Machine Readable Matrix. (USAF not equiped to read barcode). |
| R5 | IUID Matrix needs to be highly visible, in a location easily accessible. |
| R6 | IUID marking must be permanent. |
| R7 | MIL - STD-130, ISO 15434, ISO 15415, and ISO 15418, (Part Marking as per MIL-STD-130 in lieu of FPS-3008) |
| R8 | Minimum 1/8 inch lettering on Human readable to include: a. Cage (17V) b. P/N (1P) c. Serial Number (IS) |
| R9 | Minimum 1/4 inch square on Machine Readable 2D Matrix -construct 2 - to include a. Cage (17V) b. P/N (1P) c. Serial Number (IS) |
| R10 | Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and disposition counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. |
| R11 | These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. |
| R12 | The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. |
| R13 | The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies. |
| R14 | The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, paragraph 3, 3.1, 3.2, 3.3, appendix H) |
| R15 | The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, paragraph 4.1.1, 4.1.2.e., appendix A) |
| R16 | The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D) |
| R17 | The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, paragraph 4.1.2, 4.1.3, appendix B, C, D) |
| R18 | The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16 March 2012. (Ref. AS5553, paragraph 4.1.4, 4.1.5, appendix E) |
| R19 | Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423. |
| R20 | Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. |
Recent awards in NAICS 334412
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-07-30 | RAYTHEON COMPANYDefense Logistics Agency · SPARES | $1.76 million |
| 2026-07-23 | FAIRWINDS TECHNOLOGIES LLCDefense Logistics Agency · PUMP,CENTRIFUGAL | $1.03 million |
| 2026-07-23 | H C MERCHANDISERS, INC.Defense Logistics Agency · 8512259434!CIRCUIT BREAKER | $3,579 |
| 2026-07-23 | JSF BIDDING INCDefense Logistics Agency · 8512258221!PRINTED CIRCUIT BOA | $370 |
| 2026-07-23 | MMC METROLOGY LAB, INC.Department of the Navy · GAGE,PRESSURE,DIAL | $11,250 |
| 2026-07-22 | FAIRWINDS TECHNOLOGIES LLCDefense Logistics Agency · STATOR SLEEVE,CB | $449,214 |
Source: USAspending.gov, retrieved 2026-11-13. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.