F-16 Grip Assembly, Contr: requirements and submission rules

27 requirements and 5 submission rules found in the solicitation documents for SPRHA4-27-Q-0036. Use them as the start of your compliance matrix.

Solicitation number
SPRHA4-27-Q-0036
Agency
DEPT OF DEFENSE / DEFENSE LOGISTICS AGENCY / DLA AVIATION / DLA AVIATION OGDEN / DLA AVIATION AT OGDEN, UT
NAICS
336413
Set-aside
Small Business Set Aside - Total
Responses due
01 December 2026 (3 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • (ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report: System Security Plan CAGE Codes supported by this plan Brief description of the plan architecture Date of assessment Total Score Date score of 110 will achieved
  • NAICS CODE: 336413 SIZE STD: 1,250 This acquisition is restricted to qualified sources: Guardian Electric (Cage 73949), Essex Industries (Cage 83533) Contractors desiring to become a qualified source must submit a qualification package.
  • (e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract.
  • FAR Clause # Title Date Change Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
  • The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https:// www.sam.gov) for entities excluded from receiving federal awards for ‘‘covered defense telecommunications equipment or services’’.

Requirements

IDRequirement
R1PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS (Date) 30 NOV 2026
R2Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
R3The contractor shall inform the Contract Administrator immediately if it cannot meet the contractual delivery schedule.
R4Solicitation approved for U.S. Contractors Only.
R5Cybersecurity Maturity Model Certification (CMMC) level I is required, see DFARS 252.204-7021 and DFARS 252.204-7025.Section B
R6Physical Item Markings: IAW MIL-STD-130
R7The First Article Test Report is to be submitted concurrently with the First Article.Section B
R8The Contractor shall comply with the standard(s) listed below. ISO 9001:2015Section B
R9Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY.Section B
R10Contractor shall notify the Government 30 days prior to shipment.Section B
R11If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature.Section C (statement of work)
R12The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.Section C (statement of work)
R13By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.Section C (statement of work)
R14The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request.Section C (statement of work)
R15The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes.Section C (statement of work)
R16All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
R17Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
R18Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
R19Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24. The following Distribution Statement shall be placed on the first sheet of each document and/or Associated Lists. DISTRIBUTION STATEMENT "B" Distribution authorized to U.S. Government agencies. (Test & Evaluation) (Oct 2026). Other requests for this document shall be referred to (416 SCMS/GUEAA, Hill AFB, UT 84056-5825).
R20For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the "First Article" item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the "First Article" container, the report shall be enclosed in a paper or plastic envelope.
R21Contractor shall deliver the Test/Inspection Report via e-mail to the following e-mail address: alan.christenson.1@us.af.mil
R22The contractor shall submit a letter of transmittal and send the Contractors Counterfeit Protection Plan (CPP) via e-mail to: alan.christenson.1@us.af.mil
R23The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. If any remediation is required the Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. If requested the contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.
R24In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order.Section K (representations)
R25A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b)Section K (representations)
R26Bidders who meet the conditions for waiver set forth below shall submit a bid or proposal on Bid/Offer "B" which does not require compliance with the First Article Approval provision set forth herein and furnish the following information in the individual solicitation: Contract No. __________________________, Contract Item No. _________, Date of Contract. __________, Name & Address of Government Agency issuing the Contract. Failure to include this information will render the IFB(s) non-responsive and may cause rejection of RFP(s).Section L (instructions to offerors)
R27Bidders/offerors who do not meet the conditions for waiver set forth below shall submit a bid on Bid/Offer, "A" which includes compliance with First Article Approval.Section L (instructions to offerors)

Recent awards in NAICS 336413

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2028-03-31BELL BOEING JOINT PROJECT OFFICEDepartment of the Navy · NON-RECURRING ENGINEERING$19.72 million
2028-02-02PARKER-HANNIFIN CORPORATIONDepartment of the Air Force · MANUFACTURING AND REMANUFACTURING OF VALVES, PUMPS, FUEL NOZZLES, SENSORS,INDICATORS, MANIFOLDS, ETC. TO SUPPORT MULTIPLE WEAPONS SYSTEMS INCLUDING B1, F16, C5, KC135, C130, E3, ETC.$4.02 million
2027-11-01ATAP INCDepartment of the Air Force · SOURCING AND ACQUIRING COMMON STOCK EQUIPMENT VIA STRATEGIC REPLENISHMENT CONTRACT(SRC)$3.57 million
2027-09-13GE AVIATION SYSTEMS LLCDepartment of the Air Force · FY26 INDIA SOFTWARE$55,344
2027-09-05CPI AEROSTRUCTURES INCDepartment of the Air Force · T-38 STRUCTURAL IMPROVEMENT MODIFICATION KITS$10.68 million
2027-08-31BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Department of the Air Force · AFLCMC/WI$66.85 million

Source: USAspending.gov, retrieved 2026-10-30. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free