TenderAxiom

TenderAxiom · Opportunities

F-16 Grip Assembly, Contr: requirements and submission rules

40 requirements and 5 submission rules found in the solicitation documents for SPRHA4-27-Q-0036. Use them as the start of your compliance matrix.

Solicitation number
SPRHA4-27-Q-0036
Agency
DEPT OF DEFENSE / DEFENSE LOGISTICS AGENCY / DLA AVIATION / DLA AVIATION OGDEN / DLA AVIATION AT OGDEN, UT
NAICS
336413
Set-aside
Small Business Set Aside - Total
Responses due
01 December 2026 (3 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • (ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report: System Security Plan CAGE Codes supported by this plan Brief description of the plan architecture Date of assessment Total Score Date score of 110 will achieved
  • NAICS CODE: 336413 SIZE STD: 1,250 This acquisition is restricted to qualified sources: Guardian Electric (Cage 73949), Essex Industries (Cage 83533) Contractors desiring to become a qualified source must submit a qualification package.
  • (e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract.
  • FAR Clause # Title Date Change Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
  • The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https:// www.sam.gov) for entities excluded from receiving federal awards for ‘‘covered defense telecommunications equipment or services’’.

Requirements

IDRequirement
R1Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
R2The contractor shall inform the Contract Administrator immediately if it cannot meet the contractual delivery schedule.
R3Solicitation approved for U.S. Contractors Only.
R4Cybersecurity Maturity Model Certification (CMMC) level I is required, see DFARS 252.204-7021 and DFARS 252.204-7025.Section B
R5Physical Item Markings: IAW MIL-STD-130
R6The First Article Test Report is to be submitted concurrently with the First Article.Section B
R7Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report. Contractor will coordinate submission with contract administrator.Section B
R8The Contractor shall comply with the standard(s) listed below. ISO 9001:2015Section B
R9Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY.Section B
R10Contractor shall notify the Government 30 days prior to shipment.Section B
R11Approved First Articles will be returned to the contractor at the contractor’s expense for shipment with the production items.Section B
R12If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature.Section C (statement of work)
R13The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.Section C (statement of work)
R14In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.Section C (statement of work)
R15By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.Section C (statement of work)
R16In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts.Section C (statement of work)
R17The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request.Section C (statement of work)
R18The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes.Section C (statement of work)
R19Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.Section D
R20The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government. Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing.Section F (deliveries)
R21To access WAWF, the Contractor shall— (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
R22Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution.Section I (contract clauses)
R23The Contractor shall deliver 1 units(s) of Lot/Item 0001AB within 150 calendar days from the date of this contract to the Government at B FB2029 for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification.
R24If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval.Section I (contract clauses)
R25The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.Section I (contract clauses)
R26This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).Section I (contract clauses)
R27The Contractor shall provide a unique item identifier for the following: (i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more...Section I (contract clauses)
R28In accordance with section 848 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2020 and section 817 of the NDAA for FY 2023, the Contractor shall not— (1) Provide or use an unmanned aircraft system (UAS), or any related services or equipment, that— (i) Is manufactured in a covered foreign country, or by an entity domiciled in a covered foreign country; (ii) Uses flight controllers, radios, data transmission devices, cameras, or gimbals manufactured in a covered foreign country, or by an entity domiciled in a covered foreign country; (iii) Uses a ground control system or operating software developed in a covered foreign country, or by an entity domiciled in a covered foreign country; or (iv) Uses network connectivity or data storage located in, or administered by an entity domiciled in, a covered foreign country; (2) Provide or use a system for the detection or identification of a UAS, or any related services or equipment, that is manufactured in a covered foreign country or by an entity domiciled in a covered foreign country; or (3) On or after October 1, 2024, be an entity that operates equipment, as determined by the Secretary of Defense, from— (i) Da-Jiang Innovations, or any subsidiary or affiliate of Da-Jiang Innovations; (ii) Any entity that produces or provides unmanned aircraft systems and is included on the Consolidated Screening List... or (iii) Any entity that produces or provides unmanned aircraft systems and— (A) Is domiciled in a covered foreign country; or (B) Is subject to unmitigated foreign ownership, control, or influence by a covered foreign country...Section I (contract clauses)
R29Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.Section I (contract clauses)
R30In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order.Section K (representations)
R31The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.Section K (representations)
R32A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b)...Section K (representations)
R33Bidders who meet the conditions for waiver set forth below shall submit a bid or proposal on Bid/Offer "B" which does not require compliance with the First Article Approval provision set forth herein and furnish the following information in the individual solicitation: Contract No. __________________________, Contract Item No. _________, Date of Contract. __________, Name & Address of Government Agency issuing the Contract. Failure to include this information will render the IFB(s) non-responsive and may cause rejection of RFP(s).Section L (instructions to offerors)
R34Bidders/offerors who do not meet the conditions for waiver set forth below shall submit a bid on Bid/Offer, “A” which includes compliance with First Article Approval.Section L (instructions to offerors)
R35All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
R36Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
R37Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
R38Contractor shall deliver the Test/Inspection Report via e-mail to the following e-mail address: alan.christenson.1@us.af.mil
R39The contractor shall submit a letter of transmittal and send the Contractors Counterfeit Protection Plan (CPP) via e-mail to: alan.christenson.1@us.af.mil
R40The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. If any remediation is required the Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. If requested the contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.

Recent awards in NAICS 336413

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2028-03-31BELL BOEING JOINT PROJECT OFFICEDepartment of the Navy · NON-RECURRING ENGINEERING$19.72 million
2028-02-02PARKER-HANNIFIN CORPORATIONDepartment of the Air Force · MANUFACTURING AND REMANUFACTURING OF VALVES, PUMPS, FUEL NOZZLES, SENSORS,INDICATORS, MANIFOLDS, ETC. TO SUPPORT MULTIPLE WEAPONS SYSTEMS INCLUDING B1, F16, C5, KC135, C130, E3, ETC.$4.02 million
2027-11-01ATAP INCDepartment of the Air Force · SOURCING AND ACQUIRING COMMON STOCK EQUIPMENT VIA STRATEGIC REPLENISHMENT CONTRACT(SRC)$3.57 million
2027-09-13GE AVIATION SYSTEMS LLCDepartment of the Air Force · FY26 INDIA SOFTWARE$55,344
2027-09-05CPI AEROSTRUCTURES INCDepartment of the Air Force · T-38 STRUCTURAL IMPROVEMENT MODIFICATION KITS$10.68 million
2027-08-31BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Department of the Air Force · AFLCMC/WI$66.85 million

Source: USAspending.gov, retrieved 2026-10-27. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.