TenderAxiom

TenderAxiom · Opportunities

PANEL, INDICATING, LI: requirements and submission rules

48 requirements and 15 submission rules found in the solicitation documents for SPRDL1-27-R-A100. Use them as the start of your compliance matrix.

Solicitation number
SPRDL1-27-R-A100
Agency
DEPT OF DEFENSE / DEFENSE LOGISTICS AGENCY / DLA LAND / DLA LAND WARREN MICHIGAN / DLA LAND WARREN
NAICS
336320
Set-aside
Small Business Set Aside - Total
Responses due
30 December 2026 (32 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1.
  • All requests for demilitarization waivers must be submitted in writing through the PCO and the Army's SPRDL127RA100 Page 43 of 139
  • If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.
  • Vendors must be registered for a sam.gov account through https://login.gov in order to manage searches and track solicitations.
  • All bids and proposals must be submitted via email to the Contract Specialist on record.
  • The Data Custodian MUST be registered for a SAM.gov account through https://login.gov.
  • If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
  • ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change.
  • Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change.
  • DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
  • Supply chain traceability documentation shall include basic item description, part number; drawing or specification; national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.
  • When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results.
  • Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
  • (b) In order to be eligible to receive an award under this solicitation, the successful Offeror must be registered with the Department of Defense (DOD) System for Award Management (SAM).
  • (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.

Requirements

IDRequirement
R1Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date belowSection A
R2As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract Specialist listed on the solicitation. The email shall include subject header: Proposal Submission - SPRDL1-XX-X-XXXX (company name) on the solicitation.Section A
R3It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.Section A
R4If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA.Section A
R5Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation. (1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. (2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.Section A
R6The Supply Chain Traceability Documentation referred to in clause CS8001 (DLA WRN) Contractor Retention of Supply Chain Traceability Documentation is required to be submitted at the time of offer submission by all offerors other than the manufacturer of the item. Failure to submit acceptable traceability will constitute an offer that does not meet the terms and conditions of the solicitation and therefore will not be eligible for award.Section A
R7This solicitation is 100% Small Business Set-Aside.Section B
R8A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE WITH THE CLAUSE ENTITLED 'FIRST ARTICLE APPROVAL-- CONTRACTOR TESTING', FAR 52.209-3. First Article Test is required. Waiver may be authorized; see waiver provision in Section L.Section B
R9Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.Section B
R10To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS).Section C (statement of work)
R11Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.Section C (statement of work)
R12Stable Base drawings should be requested from the Contracting Office listed on page 1 of the contract not later than thirty days after award of contract.Section C (statement of work)
R13The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.Section C (statement of work)
R14The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings.Section C (statement of work)
R15If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.Section C (statement of work)
R16The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.Section C (statement of work)
R17The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.Section C (statement of work)
R18no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.Section C (statement of work)
R19No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.Section C (statement of work)
R20No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.Section C (statement of work)
R21By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.Section C (statement of work)
R22In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts.Section C (statement of work)
R23The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request.Section C (statement of work)
R24The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes.Section C (statement of work)
R25Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP. PRESERVATION: MILITARY LEVEL OF PACKING: -B- QUANTITY PER UNIT PACKAGE: -001- SPI NUMBER: -12674732, DATED - 09 OCT 24, REV-Section D
R26Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers.Section D
R27All unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129 including bar coding and a MSL label.Section D
R28All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee.Section D
R29A prototype package is required to validate the sizes and fit requirements of the SPI.Section D
R30When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.Section D
R31The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.Section E
R32A First Article Test Report shall be compiled by the Contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).Section E
R33Once the Government accepts the first production test item, or accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under Government design control.Section E
R34Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.Section F (deliveries)
R35To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.Section G
R36Contractor(s) awarded a contract with demilitarization requirements shall be responsible for maintaining an inventory system capable of recording, safeguarding and tracking all material, work in process, components associated or related to the performance of the contract for the purpose (not intended to be exclusive) of enabling the Contractor to fulfill its demilitarization obligations under this clause.Section H (special requirements)
R37This clause is a mandatory flow-down clause; accordingly, Contractor/Subcontractor must include this clause in subcontracts for work under this solicitation and resulting contract.Section H (special requirements)
R38The Contractor will demilitarization and apply TSCs as required on all contract excess property as dictated by the Government assigned demilitarization code and its definition and the demilitarization and trade security controls matrix in paragraph IX of this clause.Section H (special requirements)
R39During or upon completion of manufacturing under this contract, the prime Contractor shall notify the PCO in a timely manner that a Government representative is required to witness demilitarization of contract excess property produced under this contract whether the prime Contractor or a Subcontractor is performing the demilitarization.Section H (special requirements)
R40Upon award, the Contractor shall designate the personnel with signature authority who can contractually bind the Contractor. Additionally, the Contractor shall provide the Procuring Contracting Officer (PCO) with a list of e-mail addresses for all administrative and technical personnel assigned to this contract.Section I (contract clauses)
R41The Contractor shall test 2 unit(s) of Lot/Item CLIN 0011 as specified in this contract. At least 16 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.Section I (contract clauses)
R42The Contractor shall submit the first article test report within 360 calendar days from the date of this contract to usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil [insert address of the Government activity to receive the report] marked 'FIRST ARTICLE TEST REPORT: Contract No. ____, Lot/Item No. ____.'Section I (contract clauses)
R43Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities.Section I (contract clauses)
R44The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract.Section I (contract clauses)
R45The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause.Section I (contract clauses)
R46In accordance with 40 CFR 82.84(a)(5), the Contractor shall label products that contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j(b), (c), (d), and (e) and 40 CFR part 82, subpart ESection I (contract clauses)
R47The Contractor shall- (1)(i) Have and maintain for the duration of the contract a current CMMC status at the following CMMC level, or higher: CMMC Level 2 (Self) Contracting Officer insert: CMMC Level 1 (Self); CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUISection I (contract clauses)
R48The Contractor shall- Submit to the Contracting Officer- (i) The CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract; and (ii) Any changes in the CMMC UIDs generated in SPRS throughout the life of the contract, task order, or delivery order, if applicable

Recent awards in NAICS 336320

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-08-17MWCKC CONSULTING LLCDefense Logistics Agency · 8512306690!GENERATOR,ENGINE AC$2,198
2026-08-13TRIMAN INDUSTRIES INCDefense Logistics Agency · 8512303603!ARMATURE,MOTOR$3,378
2026-08-12AVIARMS SUPPORT CORPDefense Logistics Agency · 8512288307!PANEL,CONTROL BOX$2,776
2026-08-11MIDWAY INDUSTRIAL SUPPLY INC.Defense Logistics Agency · 8512296417!LAMP UNIT,VEHICULAR$975
2026-08-11EQUIPMENT PARTS SALESDefense Logistics Agency · 8512294672!LEAD,IGNITION,ENGIN$480
2026-08-10SEAHORSE DEFENSE SUPPLY, LLCDefense Logistics Agency · 8512294199!LIGHT SET,STOP LIGH$3,464

Source: USAspending.gov, retrieved 2026-11-22. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.