24 requirements and 9 submission rules found in the solicitation documents for SPMYM227Q1155. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- (Not applicable if the offeror is required to provide this information Taxpayer Identification Number (TIN) ( to the SAM to be eligible for award.) (1) All offerors must submit the information required in paragraphs (l)(3) through (l)(5) of this provision to comply with debt collection requirements of 31 U.S.C.
- (e)For foreign supplies for which the Government will issue duty-free entry certificates in accordance with this clause, shipping documents submitted to Customs shall- (1) Consign the shipments to the appropriate- (i)Military department in care of the Contractor, including the Contractor's delivery address; or (ii)Military installation; and SPMYM227Q1155 Page 30 of 57
- (2) If the Offeror indicates "has" in paragraph (p)(1) of this provision, enter the following information: Immediate owner CAGE code: .____ Immediate owner legal name: .____ (Do not use a "doing business as" name) Is the immediate owner owned or controlled by another entity: Yes or No.
- (2) If the Offeror has indicated "is" in paragraph (r)(1) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order): Predecessor CAGE code: (or mark "Unknown").____ Predecessor legal name: .____ ( ).Do not use a "doing business as" name (s) [Reserved].
- (1)(i)Except for shipments consigned to a military installation, the Contractor shall- (A) Prepare any customs forms required for the entry of foreign supplies into the customs territory of the United States in connection with this contract; and (B) Submit the completed customs forms to the District Director of Customs, with a copy to DCMA St.
- (B) The Contractor shall submit requests to vary from NIST SP 800-171 in writing to the Contracting Officer, for consideration by the DoD CIO.
- (Oct 2025) OFFEROR REPRESENTATIONS AND CERTIFICATIONS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov.
- Any changes provided by the Offeror in paragraph (b)(2) of this provision do not automatically (1) Annual Representations and Certifications change the representations and certifications in SAM.
- If any registrants under the Lobbying Disclosure Act of 1995 have made a lobbying contact on behalf of the offeror with respect to this contract, the offeror shall complete and submit, with its offer, OMB Standard Form LLL, Disclosure of Lobbying Activities, to provide the name of the registrants.
Requirements
| ID | Requirement |
|---|---|
| R1 | NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30. |
| R2 | CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED |
| R3 | The contractor shall utilize the electronic invoicing upon delivery of supplies indicated herein. Invoice may be submitted not more than one every two weeks. Invoices must be submitted electronically using Wide Area Work Flow (WAWF) - Receipt and Acceptance. The contractor shall self-register at the web site: https://piee.eb.mil.Section A |
| R4 | Any new contractor, vendor or supplier requesting base access will be required to obtain a Defense Biometric Identification System (DBIDS) credential. NCACS credentials will no longer be issued. Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 30 June 2017.Section A |
| R5 | All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection.Section A |
| R6 | For access to the main, perimeter gates at any Navy Base Kitsap installation, contractors are required to be a US Citizen and have either: (a) DBIDS badge or (b) Request a One-day Visitor badge at Pass & ID.Section A |
| R7 | The following types of insurance are required in accordance with the clause entitled 'Insurance - Work on a Government Installation' (FAR 52.228-5) and shall be maintained in the minimum amounts shown below. The Contractor shall furnish a Certificate of Insurance with its offer to indicate compliance with insurance requirements. If insurance will not be obtained prior to award of a contract, the offeror shall indicate by checking this block ( ) that it intends to get the required insurance and shall send a certificate to the Contracting Officer prior to the start of performance.Section C (statement of work) |
| R8 | The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components.Section C (statement of work) |
| R9 | The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at .dscc.dmsms@dla.milSection C (statement of work) |
| R10 | The hardware or supplies furnished under this contract shall not contain mercury or compounds which contain mercury. In addition, the hardware or supplies furnished under this contract shall not have come into direct contact with mercury or mercury containing compounds.Section C (statement of work) |
| R11 | By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.Section C (statement of work) |
| R12 | In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.Section C (statement of work) |
| R13 | The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request.Section C (statement of work) |
| R14 | The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes.Section C (statement of work) |
| R15 | Marking shall be in accordance with ASTM-D-3951 (most current edition) and with the information set forth in paragraph (ii) below.Section D |
| R16 | All unit and exterior containers/packs shall, as a minimum, be marked as follows: 1. National stock number (NSN), when available, or Federal stock number (FSN), when NSN is not available, or part number when neither NSN or FSN are available. 2. Noun nomenclature cited on contract or order. 3. Quantity and unit of issue. 4. Contract, or order number. 5. From:... 6. To: (See delivery address on page 1 or in Section F)Section D |
| R17 | Preservation, packaging, and packing shall be in accordance with ASTM-D-3951 (most current edition), 'Standard for Commercial Packing.'Section D |
| R18 | The use of asbestos, excelsior, loose fill polystyrene, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited.Section D |
| R19 | All non-manufactured wood utilized in wood pallets and wood containers shall be heat treated to a minimum core temperature of 56 degrees centigrade for 30 minutes and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC).Section D |
| R20 | Items that are not being shipped via SMALL PARCEL SERVICE (UPS/FEDEX/DHL) are required to be on PALLETS.Section D |
| R21 | Contractors shall include the Transportation Control Number (TCN) and carrier shipment tracking information when submitting the DD250/iRAPT Receiving Report in Wide Area Workflow (WAWF) in order to assist with material inspection and acceptance.Section E |
| R22 | If United Parcel Service (UPS) or Federal Express services are used for transportation, each package must have a unique package identification number.Section F (deliveries) |
| R23 | To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site. |
| R24 | The Contractor shall ensure that all contract correspondence that is addressed to the United States Government is submitted in English or with an English translation.Section I (contract clauses) |
Recent awards in NAICS 238310
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-07-14 | USA CONSTRUCTION CODepartment of the Army · SPRAY FOAM INSULATION TO BE APPLIED TO CONTAINERIZED KITCHENS IN SUPPORT OF THE FORCE SUSTAINMENT PROGRAM AT LETTERKENNY ARMY DEPOT. | $1,388 |
| 2026-07-14 | USA CONSTRUCTION CODepartment of the Army · SPRAY FOAM INSULATION TO BE APPLIED TO CONTAINERIZED KITCHENS IN SUPPORT OF THE FORCE SUSTAINMENT PROGRAM AT LETTERKENNY ARMY DEPOT. | $1,388 |
| 2026-06-30 | SPECIALTY DISTRIBUTION GROUP, LLCDefense Logistics Agency · 3-1/2ID(3IPS) X 3/4 INCH (30) KFLEX ECO PC PART NUMBER RUPC03507EK | $319 |
| 2026-06-26 | COASTAL MARINE SERVICES, INC.Department of the Navy · C410B - FY26 HULLBOARD REMOVAL, REPAIR AND INSTALLATION, USS CHAFEE (DDG 90) | $8,992 |
| 2026-06-24 | COASTAL MARINE SERVICES, INC.Department of the Navy · C410B - FY26 HULLBOARD REMOVAL, REPAIR AND INSTALLATION, USS JACK H LUCAS (DDG 125) | $3,388 |
| 2026-06-17 | USA CONSTRUCTION CODepartment of the Army · SPRAY FOAM INSULATION TO BE APPLIED TO CONTAINERIZED KITCHENS IN SUPPORT OF THE FORCE SUSTAINMENT PROGRAM AT LETTERKENNY ARMY DEPOT. | $1,388 |
Source: USAspending.gov, retrieved 2026-11-23. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.