Government-Owned, Contactor-Operated (GOCO) and Contractor-Owned/Contractor-Operated (COCO) fuel services at Marine Corps Air Ground Combat Center 29 Palms, CA: requirements and submission rules

115 requirements and 15 submission rules found in the solicitation documents for SPE603-26-R-0543. Use them as the start of your compliance matrix.

Solicitation number
SPE603-26-R-0543
Agency
DEPT OF DEFENSE / DEFENSE LOGISTICS AGENCY / DLA ENERGY / DLA ENERGY
NAICS
493190
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Responses due
30 November 2026 (2 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Past Performance Reference List (See Section J, Attachment VI): (2 page limit) This is submitted by the offeror by the solicitation closing date specified on the SF1449 and shall include (where there is performance pursuant to Section M) the following: Three references from whom DLA Energy can expect to receive Past Performance Questionnaires (PPQs) on past performance recent and relevant to this solicitation.
  • Cover Letter: (2-page limit) Offerors shall submit a cover page providing the following information: (1) RFP Number; (2) Proposal Title; (3) Technical Point of Contact, including name, telephone number, FAX number, e-mail address, and mailing address; and (4) Name, title, telephone number, and e- mail address for the authorized individual(s) pursuant to SUPPLEMENTAL: AUTHORIZED NEGOTIATORS. ii.
  • Acknowledgement of Solicitation Amendments: (no page limit) Offerors shall submit all signed SF-30, if applicable. vi.
  • NAME TITLE PHONE NUMBER E-MAIL ADDRESS SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT - REGISTRATION (DEVIATION 2026-O0038)(FEB 2026) The Offeror shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer or quotation in response to this solicitation and at the time of award.
  • (c) The Contractor shall submit complete termination inventory schedules no later than 120 days from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 120-day period.
  • (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
  • The Offeror shall obtain and provide the following identifying information: (1) Unique entity identifier (UEI).
  • Questions relating to the solicitation should be submitted no later than 10:00 A.M. local time (Fort Belvoir, VA) on Tuesday, September 8, 2026 to the above contacts.
  • The Government will accept no more than three PPQs when received directly from the offeror’s reference, due by the solicitation closing date on the SF1449.
  • Attachment A SPE603-26-R-0543-RFP 29 Palms, CA Page 137 of 149 or commercial service exception, the Offeror shall submit, at a minimum, information that is adequate for determining commerciality and evaluating the reasonableness of the price for this acquisition, including prices at which the same product or service or similar products or services have been sold in the commercial market.
  • 39 (f) The contractor shall submit each request for IT access and investigation through the contracting officer to the assigned or cognizant DLA Intelligence Personnel Security Office.
  • Submit signed and dated offers as specified by block 8 of the SF-1449 in this solicitation to micherie.dougherty@dla.mil and Radhiyah.Smith@dla.mil@dla.mil.
  • Font shall be 12-point Times New Roman (or similar font style) on an 8 ½” x 11” page with 1” margin. i.
  • Page limits are indicated for each submission element below and shall include all appendices and attachments unless otherwise stated. b.
  • Exceptions to Terms: (no page limit) Offerors shall state any exceptions to terms and conditions of the solicitation, including exceptions, to the Performance Work Statement (PWS) in its Technical Proposal.

Requirements

IDRequirement
R1Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. Weekly water drainage is necessary because water may accumulate below the datum plate, which may not be the lowest point in the tank, and therefore not be detected during gauging. Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.Section C (statement of work)
R2The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge.Section C (statement of work)
R3All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).Section C (statement of work)
R4Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below)Section C (statement of work)
R5All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.Section C (statement of work)
R6The Contractor shall prepare all documentation and systemically process related transactions in accordance with the information and instructions provided herein; DoD Manual 4140.25, DoD Management of Energy Commodities, available at the Washington Headquarters Service site, https://esd.whs.mil/issuances/dodm; and applicable DLA Energy publications listed belowSection C (statement of work)
R7Unless the Government has specifically stated that the Government will provide the hardware (usually at Government-owned facilities), the Contractor shall provide requisite hardware (specifications will be provided by the Government) capable of processing all applicable inventory and accounting transactions on a daily (on normal business days excluding weekend and holidays) through DLA Energy-provided applications or software.Section C (statement of work)
R8Applications require the Contractor to provide and have on-site high-speed internet access with a static Internet Protocol (IP) address, e-mail with individual user accounts, the current version of Adobe Acrobat, the most current version of Internet Explorer, Active Client, and DoD Root Certificates.Section C (statement of work)
R9The Contractor shall be responsible for (in conjunction with DLA Energy/DLA) identifying employees that will be processing inventory/accounting transactions for obtaining requisite systems access for those employees. DoD ADP Level III systems access requires a National Agency Check (NAC) investigation.Section C (statement of work)
R10The Contractor shall immediately notify DLA Energy when Contractor personnel with access privileges no longer work at the contract facility or no longer require access.Section C (statement of work)
R11Within one business day of each transaction/business event (excluding weekends and Government holidays), the Contractor shall input transaction data into the Accountable Property System of Record (APSR) or applications designated/provided by the Government.Section C (statement of work)
R12The Contractor shall record in the DLA Energy Accountable Property System of Record (APSR) the inventory (quantity corrected to 60 degrees Fahrenheit) of each Government-owned product stored at the facility.Section C (statement of work)
R13Contractor shall process EOM physical inventory adjustment transactions and operating gain/loss adjustment transactions for each DWWCF petroleum product grade within two business days following the last calendar day of each month.Section C (statement of work)
R14EOY transactions and inventories must be processed to EBS by close of business September 30th. The Contractor shall have the account reconciled in accordance with DoDM 4140.25 and/or DLA Energy P-1, Recording and Processing Inventory TransactionsSection C (statement of work)
R15Where DLA Energy has deployed an Electronic Point of Sale (EPoS) fixed or mobile device(s), the Contractor shall use the fixed and/or mobile EPoS device(s) to record inventory transactions and upload and reconcile them to the APSR daily. The Contractor shall follow DoD Manual 4140.25, and DLA Energy P-25, P-29 and P-30.Section C (statement of work)
R16The contractor shall verify and report Automatic Tank Gauging accuracy as required by DLA Energy P-7, Accountability and Custodial Responsibilities for Defense Working Capital Fund (DWCF) Inventory and Government Property.Section C (statement of work)
R17The contractor shall complete the Responsible Officer (RO) / Terminal Manager (TM) Daily Document Review Checklist and RO / TM End-of-Month Reconciliation Checklist as required by DLA Energy P-7Section C (statement of work)
R18The Contractor shall prepare inventory adjustment documents (DD Form 1348-8, DFSP Inventory Accounting Document and End of Month Report) in accordance with the DoDM 4140.25, Volume 9, DFSP Bulk Petroleum Inventory Management, Volume 10, DoD Management of Energy Commodities, Sales Accountability and Documentation Management, and DLA Energy P-1. The Contractor shall provide a detailed explanation on each inventory adjustment document explaining each gain and/or loss in excess of DLA Energy provided tolerances.Section C (statement of work)
R19Prior to removing a storage tank from service, the Contractor shall immediately notify the authorized Government representative by telephone, with follow-up confirmation in writing, providing the date and time the tank is scheduled to be removed from service. In addition, the Contractor shall provide the authorized Government representative a written estimate of unrecoverable tank bottoms.Section C (statement of work)
R20Prior to the end of the contract period, the Contractor shall provide the authorized Government representative a written estimate of unrecoverable tank bottoms.Section C (statement of work)
R21Government-owned fuel additives, slop fuel, and transmix stock at the DFSP will be treated as separate and distinct items, and all transactions shall be documented as outlined herein. Report these products in gallons and report them under the approved National Stock Number (NSN).Section C (statement of work)
R22CONUS storage Contractors shall maintain a daily written log of motor carrier performance to include: carrier, destination, number of trucks ordered, number of trucks furnished, and deficiencies. On the last business day of each calendar month, the Contractor shall forward a copy of the daily written logs to the DLA Energy Regional office having oversight of the motor carrier contract.Section C (statement of work)
R23The Contractor shall furnish the authorized Government representative a statement containing the names and handwritten signatures of persons authorized by the Contractor to receive and accept Government-owned product or property. The Contractor is required to provide the DLA Energy Contracting Officer/Property Administrator with written notification when previously authorized persons depart (leave, quit, or transfer, or otherwise cease working in a position in which the individual is authorized to receive and accept Government-owned product or property.,) and new personnel are appointed to these positions.Section C (statement of work)
R24To satisfy auditability requirements, DFSPs shall retain a minimum of three years (current fiscal year plus two additional years) of Inventory Documentation/Data on location. Source documents and data requiring retention beyond the three-year point shall be retired to a records retention center. Contractor shall contact the DLA Energy Records Management Officer via e-mail for disposition instructions at descrecords@dla.mil. The contractor shall provide DLA Energy copies of documents and/or provide any requested inventory information data/data within 3 business days. The contractor shall retain all documents listed below, and will upon request, scan and upload images of all documents into a US Government forms archive or records management storage system.Section C (statement of work)
R25The Contractor shall take all measures required by law and good business practice to prevent fuel spills (including, but not limited to, any spilling, leaking, pumping, pouring, emitting, emptying, or dumping into or onto any land or water). In the event that the Contractor's failure to take such measures results in a fuel spill, the Contractor shall be liable for the costs of spill containment, cleanup, and disposal. In addition, the Contractor shall reimburse the Government for any resulting fines or penalties.Section C (statement of work)
R26The Contractor shall not use the facilities (defined in FAR Part 45 GOVERNMENT PROPERTY) for any purpose other than that required for the performance of this contract.Section C (statement of work)
R27The Contractor shall not include any amount on account of rental of the facilities as an element of price or cost under this contract. The Contractor further agrees and represents that in no event will it include any amount or allowance for amortization, depreciation, or obsolescence of the facilities as an element of cost or price under any contract with the Government or any subcontract thereunder.Section C (statement of work)
R28Public Key Infrastructure (PKI) certification is required when work performed under this contract/task order requires access to DLA/DLA Energy or United States Government information systems.Section C (statement of work)
R29In cases where contract performance is not on a U.S. Government installation and is not within reasonable access of a RAPIDS site, the contractor shall obtain Department of Defense (DOD) PKI certificates through the External Certificate Authority (ECA) Program from one of three approved vendors.Section C (statement of work)
R30A National Agency Check with written Inquiry (NACI) or equivalent investigation shall be obtained for personnel using BSM-E applications.Section C (statement of work)
R31The Contractor will provide the Contracting Officer or designated Contracting Officer’s Representative (COR) the roster of employees requiring PKI certificates.Section C (statement of work)
R32The Contractor shall comply with all environmental laws and regulations applicable to its operations under this contract, both those in effect on the date of award and those enacted afterward.Section C (statement of work)
R33The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination.Section F (deliveries)
R34Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to affect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality.Section F (deliveries)
R35The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readinessSection F (deliveries)
R36Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.Section F (deliveries)
R37The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan.Section F (deliveries)
R38The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel.Section F (deliveries)
R39Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels, jet lubricating oil, and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish, periodically inspect, clean such strainers, and repair same, if necessary, keeping a written record thereof.Section F (deliveries)
R40Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. The Contractor will furnish such seals. Seal numbers will be indicated on shipping documents.Section F (deliveries)
R41Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.Section F (deliveries)
R42The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading.Section F (deliveries)
R43All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS).Section F (deliveries)
R44All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulations (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be recommended by the meter manufacturer or every 6 months, whichever is more frequent.Section F (deliveries)
R45In addition to gauging storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories or the purpose of detecting loss of products.Section F (deliveries)
R46Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.Section G
R47To access WAWF, the Contractor shall— (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.Section G
R48Offeror shall indicate below the complete mailing address (including the nine-digit zip code) to which remittances should be mailed if such address is other than that shown in Block 15a (Standard Form (SF) 33) for noncommercial items or Block 17a (SF 1449) for commercial items. In addition, if offeror did not incorporate its nine-digit zip code in the address shown in Block 15a of the SF 33 or in Block 17a of the SF 1449, the offeror shall enter it belowSection G
R49Immediately upon the discovery of a petroleum spill, leak, or seepage involving Defense Logistics Agency Energy (DLA Energy) owned product, the Contractor shall notify, by telephone, (1) the Quality Representative, (2) the designated Defense Energy Region, and (3) the Administrative Contracting Officer (ACO). In addition, if the said spill, leak, or seepage has reached, or if it might possibly reach, navigable waters, the Contractor shall immediately notify the Coast Guard by telephone (800) 424-8802, the appropriate Federal and State officials designated in State laws, and the ACO.Section H (special requirements)
R50Immediately upon discovery of a petroleum spill, leak, or seepage, the Contractor shall take all practicable measures available to contain and prevent further spreading of such spill, leak, or seepage. Measures taken by the Contractor will be in compliance with all local, State, and Federal laws and regulations.Section H (special requirements)
R51Any Contractor whose terminal stores product exclusively for DLA Energy use shall prepare and submit an approved Spill Prevention Control and Countermeasure Plan, Oil Pollution Prevention Operations Manual, and Oil Spill Contingency Plan, as applicable. These documents shall be submitted to the ACO and the Defense Energy Region specified in the DESIGNATION OF THE DEFENSE ENERGY REGION contract text of this solicitation as soon as practicable after contract award, but no later than 60 days after award notification.Section H (special requirements)
R52The Contractor shall be responsible for maintaining current telephone numbers of the agencies cited herein and in the Contingency Plan upon commencement of the contract period.Section H (special requirements)
R53Prior to beginning work on a contract, DLA requires all contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation (FBI) fingerprint check.Section H (special requirements)
R54Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security Programs, and DLA Issuance 4314, Personnel Security Program, all DoD contractor personnel who have access to Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearanceSection H (special requirements)
R55Contractor personnel shall not commence work on this effort until the investigation has been favorably adjudicated or the contractor employee has been waived into the position pending completion of adjudication.Section H (special requirements)
R56All contractor personnel who are granted access to Government and/or Federally-controlled information systems shall observe all local automated information system (AIS) security policies and procedures.Section H (special requirements)
R57The contractor shall provide, on a monthly basis, a listing of all personnel working under the contract that have CACs.Section H (special requirements)
R58Contractor personnel must additionally receive operations security (OPSEC) and information security (INFOSEC) awareness training.Section H (special requirements)
R59The contractor shall not bill for personnel, who are not working on the contract while that contractor employee’s clearance investigation is pending.Section H (special requirements)
R60Within 30 days after contract award, unless the Contracting Officer establishes a longer time period, the Contractor shall— (i) Have a written code of business ethics and conduct; and (ii) Make a copy of the code available to each employee engaged in performance of the contract.Section I (contract clauses)
R61The Contractor shall timely disclose, in writing, to the agency Office of the Inspector General (OIG), with a copy to the Contracting Officer, whenever, in connection with the award, performance, or closeout of this contract or any subcontract thereunder, the Contractor has credible evidence that a principal, employee, agent, or subcontractor of the Contractor has committed- (A) A violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the United States Code; or (B) A violation of the civil False Claims Act ( 31 U.S.C. 3729- 3733).Section I (contract clauses)
R62The Contractor shall only tender for acceptance those items that conform to the requirements of this contract.Section I (contract clauses)
R63By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for— (1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities.Section I (contract clauses)
R64The Contractor will not engage in any racially discriminatory DEI activitiesSection I (contract clauses)
R65The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.Section I (contract clauses)
R66The Contractor shall provide all information needed by the Federal facility to comply with the following: (1) The emergency planning reporting requirements of Section 302 of EPCRA. (2) The emergency notice requirements of Section 304 of EPCRA. (3) The list of Material Safety Data Sheets, required by Section 311 of EPCRA. (4) The emergency and hazardous chemical inventory forms of Section 312 of EPCRA. (5) The toxic chemical release inventory of Section 313 of EPCRA, which includes the reduction and recycling information required by Section 6607 of PPA.Section I (contract clauses)
R67The Contractor, if other than an individual, shall-within 30 days after award (unless a longer period is agreed to in writing for contracts of 30 days or more performance duration), or as soon as possible for contracts of less than 30 days performance duration- (1) Publish a statement notifying its employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition; (2) Establish an ongoing drug-free awareness program to inform such employees... (3) Provide all employees engaged in performance of the contract with a copy of the statement... (4) Notify such employees in writing... (5) Notify the Contracting Officer in writing within 10 days after receiving notice... (6) Within 30 days after receiving notice... take one of the following actions with respect to any employee who is convicted of a drug abuse violation... and (7) Make a good faith effort to maintain a drug-free workplace through implementation of paragraphs (b)(1) through (b)(6) of this clause.Section I (contract clauses)
R68The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.Section I (contract clauses)
R69Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained.Section I (contract clauses)
R70The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs.Section I (contract clauses)
R71The Contractor shall not knowingly provide compensation to a covered DoD official within 2 years after the official leaves DoD service, without first determining that the official has sought and received, or has not received after 30 days of seeking, a written opinion from the appropriate DoD ethics counselor regarding the applicability of post-employment restrictions to the activities that the official is expected to undertake on behalf of the Contractor.Section I (contract clauses)
R72The Contractor shall inform its employees in writing, in the predominant native language of the workforce, of contractor employee whistleblower rights and protections under 10 U.S.C. 4701, as described in subpart 203.9 of the Defense Federal Acquisition Regulation Supplement.Section I (contract clauses)
R73Contractor personnel who require routine physical access to a Federally-controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter.Section I (contract clauses)
R74The Contractor shall provide adequate security on all covered contractor information systems. To provide adequate security, the Contractor shall implement, at a minimum, the following information security protections: (1) For covered contractor information systems that are part of an information technology (IT) service or system operated on behalf of the Government... (2) For covered contractor information systems that are not part of an IT service or system operated on behalf of the Government... the covered contractor information system shall be subject to the security requirements in National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171Section I (contract clauses)
R75When the Contractor discovers a cyber incident that affects a covered contractor information system or the covered defense information residing therein, or that affects the contractor's ability to perform the requirements of the contract that are designated as operationally critical support and identified in the contract, the Contractor shall— (i) Conduct a review for evidence of compromise... and (ii) Rapidly report cyber incidents to DoD at https://dibnet.dod.mil.Section I (contract clauses)
R76When a Contractor discovers a cyber incident has occurred, the Contractor shall preserve and protect images of all known affected information systems identified in paragraph (c)(1)(i) of this clause and all relevant monitoring/packet capture data for at least 90 days from the submission of the cyber incident report to allow DoD to request the media or decline interest.Section I (contract clauses)
R77The Contractor shall— (1)(i) Have and maintain for the duration of the contract a current CMMC status at the following CMMC level, or higher: _CMMC Level 2 (Self) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI; and (ii) Consult 32 CFR 170.23 related to the flowdown of the CMMC requirements, and flow down the correct CMMC level to subcontracts and other contractual instruments; (2) Only process, store, or transmit FCI or CUI on contractor information systems that have a CMMC status at the CMMC level required in paragraph (d)(1) of this clause, or higher; (3) Complete on an annual basis, and maintain as current,an affirmation, by the affirming official (see 32 CFR 170.4), of continuous compliance with the requirements associated with the CMMC level required in paragraph (d)(1) of this clause in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) for each CMMC UID applicable to each of the contractor information systems that process, store, or transmit FCI or CUI and that are used in performance of the contractSection I (contract clauses)
R78The Contractor shall report annually, by October 31, at https://www.sam.gov, on the services performed under this contract or order, including any first-tier subcontracts, during the preceding Government fiscal year (October 1 - September 30).Section I (contract clauses)
R79The Contractor shall provide cooperative agreement holders, upon their request, with a list of those appropriate employees or offices responsible for entering into subcontracts under defense contracts.Section I (contract clauses)
R80Unless the Government determines that there is a compelling reason to do so, the Contractor shall not enter into any subcontract in excess of the threshold specified in Federal Acquisition Regulation 9.405-2(b) on the date of subcontract award with a firm, or a subsidiary of a firm, that is identified in the Exclusions section of the System for Award Management (SAM Exclusions) as being ineligible for the award of Defense contracts or subcontracts because it is owned or controlled by the government of a country that is a state sponsor of terrorism.Section I (contract clauses)
R81A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party that is identified, in SAM Exclusions, as being ineligible for the award of Defense contracts or subcontracts because it is owned or controlled by the government of a country that is a state sponsor of terrorism.Section I (contract clauses)
R82In accordance with 10 U.S.C. 2692, the Contractor is prohibited from storing, treating, or disposing of toxic or hazardous materials not owned by DoD on a DoD installation, except to the extent authorized by a statutory exception to 10 U.S.C. 2692 or as authorized by the Secretary of Defense.Section I (contract clauses)
R83The Contractor shall deliver only domestic end products unless, in its offer, it specified delivery of other end products in the Buy AmericanBalance of Payments Program Certificate provision of the solicitation. If the Contractor certified in its offer that it will deliver a qualifying country end product, the Contractor shall deliver a qualifying country end product or, at the Contractor’s option, a domestic end product.Section I (contract clauses)
R84The Contractor shall comply with all applicable laws and regulations regarding export-controlled items, including, but not limited to, the requirement for contractors to register with the Department of State in accordance with the ITAR.Section I (contract clauses)
R85(i) Effective through December 31, 2026, the Contractor shall not deliver under this contract any covered material melted or produced in any covered country, or any end item, manufactured in any covered country, that contains a covered material; and (ii) Effective January 1, 2027, the Contractor shall not deliver under this contract any covered material mined, refined, separated, melted, or produced in any covered country, or any end item, manufactured in any covered country, that contains a covered material (section 854, Pub. L. 118-31; 10 U.S.C. 4872).Section I (contract clauses)
R86The Contractor shall— (1) Not have any business operations with an authority of the Maduro regime or the government of Venezuela that is not recognized as the legitimate government of Venezuela by the U.S. Government; or (2) Have a valid license to operate in Venezuela issued by the Office of Foreign Assets Control of the Department of the Treasury.Section I (contract clauses)
R87The Contractor shall make a good faith effort to determine that forced labor from XUAR will not be used in the performance of this contract (section 855, Pub. L. 117-263).Section I (contract clauses)
R88In accordance with section 804 of the National Defense Authorization Act for Fiscal Year 2024 (Pub. L. 118-31), the Contractor is prohibited from entering into a subcontract or other contractual instrument for the procurement of products or services with any entity or individual that is known to be, or that is known to have fossil fuel business operations with an entity or individual that is, not less than 50 percent owned, individually or collectively, by— (1) An authority of the government of the Russian Federation; or (2) A fossil fuel company that operates in the Russian FederationSection I (contract clauses)
R89Contractor personnel shall not interrogate detainees.Section I (contract clauses)
R90The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, using the methodology described at 32 CFR 170.24, if necessary.Section I (contract clauses)
R91The Contractor shall ensure, consistent with the requirements of the applicable inspection clause in this contract, that the facilities, infrastructure, and equipment acquired, constructed, installed, repaired, maintained, or operated under this contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural integrity; (3) Electrical systems; (4) Plumbing; (5) Water treatment; (6) Waste disposal; and (7) Telecommunications networks.Section I (contract clauses)
R92If the transportation of supplies by sea is anticipated under this contract, the Contractor shall— (1) Notify the Contracting Officer and Maritime Administration (MARAD) at Cargo.Marad@dot.gov — (i) Within 3 business days after contract award; or (ii) Immediately prior to the shipment departure date necessary to meet delivery schedules, whichever is earlier; and (2) Include in the notification— (i) A statement of the Contractor's intent to transport supplies by sea; (ii) The contract number; and (iii) The task-order or delivery-order number, when applicable.Section I (contract clauses)
R93The Contractor shall use U.S.-flag vessels when transporting any supplies by sea under this contract.Section I (contract clauses)
R94If any registrants under the Lobbying Disclosure Act of 1995 have made a lobbying contact on behalf of the offeror with respect to this contract, the offeror shall complete and submit, with its offer, OMB Standard Form LLL, Disclosure of Lobbying Activities, to provide the name of the registrants.Section K (representations)
R95The Offeror will not be eligible for award of a contract, task order, or delivery order resulting from this solicitation if the Offeror does not have, for each of the contractor information systems that will process, store, or transmit FCI or CUI and that will be used in performance of a contract resulting from this solicitation— (i) The current CMMC status entered in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) at the CMMC level required by paragraph (b)(1) of this provision; and (ii) A current affirmation of continuous compliance with the security requirements identified at 32 CFR part 170 in SPRS.Section K (representations)
R96The Offeror shall provide, in the proposal, the CMMC unique identifier(s) (CMMC UIDs) issued by SPRS for each contractor information system that will process, store, or transmit FCI or CUI during performance of a contract, task order, or delivery order resulting from this solicitation.Section K (representations)
R97Offerors must call the POC above at 445-737-1305, if email verification is not received from DLA within 24 hours of offerors submitting their proposal.Section L (instructions to offerors)
R98All offerors shall clearly mark all correspondence sent in response to this solicitation with the words: 'OFFER UNDER [insert solicitation number specified on block 5 of 1449].'Section L (instructions to offerors)
R99Proposals must adhere to the below format (i.e., in their appropriate, relevant volume). Failure to provide the information requested in this section may result in a proposal being deemed non-responsive and/or unacceptable or result in assessed weaknesses and deficiencies.Section L (instructions to offerors)
R100Mandatory Solicitation Offeror Fill-in Information: (no page limit) 1. See Section C, Specifications/SOW/SOO/PWS, and complete all contractor fill-in information in its entirety. 2. See Section G, Contract Administration Data and complete all contractor fill-in information in its entirety. 3. See Section K, Representations and Certifications and complete all contractor fill-in information in its entirety; however, the offeror can exclude the solicitation fill-in information under a provision if the information requested is completed in System for Award Management (SAM).Section L (instructions to offerors)
R101Teaming Arrangements: If applicable, the offeror must disclose any teaming arrangement(s) at the earliest time known before award. If proposing as a team or a sub-contractor arrangement, an offeror MUST provide a summary of the responsibility of each teaming partner and sub-contractor. The submission shall indicate the percent at which the arrangement is designed, and whether it is a Partnership, Joint Venture and/or Prime/Sub relationship.Section L (instructions to offerors)
R102Volume I: Technical Proposal (80 page limit) See Section M.
R103If no past performance is available, the offeror must affirmatively submit a statement. (1 page limit)Section J
R104Volume III: Price (no page limit) Price Proposal Form (See Section J, Attachment I) is required for a price submission.Section J
R105The offeror agrees to hold the prices in its offer firm for 180 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.Section J
R106The Government requires a minimum acceptance period of 180 calendar days. If the offeror specifies an acceptance period which is less than that required by the Government, such offer may be rejected.Section J
R107Initial proposals, modifications and proposal revisions submitted via e-mail must contain offeror's signature included in the attachment to the e-mail communication.Section J
R108Attachments that are not in .pdf file format must be sent password protected for “read only” to ensure the integrity of the data submitted.Section J
R109Proposals submitted electronically through a single e-mail must be no more than 10 MB. DLA Energy’s mail server will reject messages larger than 10 MB.Section J
R110Each proposal shall be accompanied by a map (a city street map is satisfactory) showing the exact location of the facility, a schematic drawing showing the facility layout and its relation to other facilities in the area, a description of equipment to be provided, line systems, pump capacities, and a complete cleaning, maintenance and repair history for each storage tank, to include the last American Petroleum Institute (API) 653 inspection as well as the scheduled date for the next API 653 inspection.Section J
R111Offeror must verify that certified strapping charts are available for each tank offered and that such charts will be provided upon request.Section J
R112Offerors are required to provide the maximum safe fill capacity for each tank offered, including a summary of how the maximum safe fill capacity computation was calculated.Section J
R113If the proposal is based on providing a segregated system in lieu of the preferred dedicated system, offerors must submit a general description of such system including detailed handling procedures that shall be followed to ensure the quality of U.S. Government-owned product.Section J
R114The Licensee shall procure and keep continuously in effect during the term of this License a program of self-insurance with the following levels of coverage as shown below... Commercial General Liability (Occurrence Policy Only) Bodily Injury (Single Limit) $2,000,000 Property Damage $2,000,000 Fire/Legal Liability $2,000,000 Deductible $2,000,000 Worker’s Compensation $2,000,000Section M (evaluation factors)
R115The Licensee will not be allowed entry on the Premises until it first delivers a certificate or certificates of required insurance to the Licensor.Section M (evaluation factors)

Recent awards in NAICS 493190

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-07-23ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260469!TIRE,PNEUMATIC,VEHI$2,247
2026-07-23ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260531!TIRE,PNEUMATIC,VEHICULAR$981
2026-07-23ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260542!TIRE,PNEUMATIC,AIRCRAFT$9,231
2026-07-23ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260522!TIRE,PNEUMATIC,AIRCRAFT$461
2026-07-23ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260520!TIRE,PNEUMATIC,VEHICULAR$467
2026-07-23ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260455!TIRE,PNEUMATIC,VEHICULAR$10,553

Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.