Government-Owned, Contactor-Operated (GOCO) and Contractor-Owned/Contractor-Operated (COCO) fuel services at Marine Corps Air Ground Combat Center 29 Palms, CA: requirements and submission rules
45 requirements and 4 submission rules found in the solicitation documents for SPE603-26-R-0543. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 39 (f) The contractor shall submit each request for IT access and investigation through the contracting officer to the assigned or cognizant DLA Intelligence Personnel Security Office.
- (v) Volume XII, Table 52, shall be used to convert cubic meter at 15 degrees Centigrade to barrels at 60 degrees Fahrenheit.
- (vi) If the original measurement is by weight and quantity is required in U.S. gallons, then-- (A) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit.
- (B) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
Requirements
| ID | Requirement |
|---|---|
| R1 | Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present.Section C (statement of work) |
| R2 | Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt. Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product.Section C (statement of work) |
| R3 | Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.Section C (statement of work) |
| R4 | The samples identified in the solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. The Contractor must provide these samples using qualified personnel, facilities, and equipment on-site and shall include all associated costs in the monthly service charge.Section C (statement of work) |
| R5 | All samples must be taken in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1).Section C (statement of work) |
| R6 | The tests identified in this solicitation attachment entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING are a required part of the services to be provided. Those tests identified in the attachment which are part of a higher order analysis (defined as follows: Composite Samples, Storage Tanks After Receipt, Interface Mixture, Dormant Stocks, and Individual Tests, including particulate contamination) shall be provided by the Contractor using one of the following options (the Contractor shall check the appropriate box below)Section C (statement of work) |
| R7 | All facilities and equipment to be provided, whether that of a Contractor or a commercial laboratory, must conform to the standards for such facilities and equipment established by the Occupational Safety and Health Act and the National Fire Protection Association or local regulations, whichever is more stringent.Section C (statement of work) |
| R8 | The Contractor shall prepare all documentation and systemically process related transactions in accordance with the information and instructions provided herein; DoD Manual 4140.25, DoD Management of Energy Commodities, available at the Washington Headquarters Service site, https://esd.whs.mil/issuances/dodm; and applicable DLA Energy publicationsSection C (statement of work) |
| R9 | Unless the Government has specifically stated that the Government will provide the hardware (usually at Government-owned facilities), the Contractor shall provide requisite hardware (specifications will be provided by the Government) capable of processing all applicable inventory and accounting transactions on a daily (on normal business days excluding weekend and holidays) through DLA Energy-provided applications or software.Section C (statement of work) |
| R10 | Applications require the Contractor to provide and have on-site high-speed internet access with a static Internet Protocol (IP) address, e-mail with individual user accounts, the current version of Adobe Acrobat, the most current version of Internet Explorer, Active Client, and DoD Root Certificates.Section C (statement of work) |
| R11 | Within one business day of each transaction/business event (excluding weekends and Government holidays), the Contractor shall input transaction data into the Accountable Property System of Record (APSR) or applications designated/provided by the Government.Section C (statement of work) |
| R12 | The Contractor shall record in the DLA Energy Accountable Property System of Record (APSR) the inventory (quantity corrected to 60 degrees Fahrenheit) of each Government-owned product stored at the facility.Section C (statement of work) |
| R13 | Contractor shall process EOM physical inventory adjustment transactions and operating gain/loss adjustment transactions for each DWWCF petroleum product grade within two business days following the last calendar day of each month.Section C (statement of work) |
| R14 | Where DLA Energy has deployed an Electronic Point of Sale (EPoS) fixed or mobile device(s), the Contractor shall use the fixed and/or mobile EPoS device(s) to record inventory transactions and upload and reconcile them to the APSR daily.Section C (statement of work) |
| R15 | The contractor shall verify and report Automatic Tank Gauging accuracy as required by DLA Energy P-7, Accountability and Custodial Responsibilities for Defense Working Capital Fund (DWCF) Inventory and Government Property.Section C (statement of work) |
| R16 | The contractor shall complete the Responsible Officer (RO) / Terminal Manager (TM) Daily Document Review Checklist and RO / TM End-of-Month Reconciliation Checklist as required by DLA Energy P-7Section C (statement of work) |
| R17 | The Contractor shall prepare inventory adjustment documents (DD Form 1348-8, DFSP Inventory Accounting Document and End of Month Report) in accordance with the DoDM 4140.25, Volume 9, DFSP Bulk Petroleum Inventory Management, Volume 10, DoD Management of Energy Commodities, Sales Accountability and Documentation Management, and DLA Energy P-1. The Contractor shall provide a detailed explanation on each inventory adjustment document explaining each gain and/or loss in excess of DLA Energy provided tolerances.Section C (statement of work) |
| R18 | Prior to removing a storage tank from service, the Contractor shall immediately notify the authorized Government representative by telephone, with follow-up confirmation in writing, providing the date and time the tank is scheduled to be removed from service. In addition, the Contractor shall provide the authorized Government representative a written estimate of unrecoverable tank bottoms.Section C (statement of work) |
| R19 | Prior to the end of the contract period, the Contractor shall provide the authorized Government representative a written estimate of unrecoverable tank bottoms.Section C (statement of work) |
| R20 | CONUS storage Contractors shall maintain a daily written log of motor carrier performance to include: carrier, destination, number of trucks ordered, number of trucks furnished, and deficiencies. On the last business day of each calendar month, the Contractor shall forward a copy of the daily written logs to the DLA Energy Regional office having oversight of the motor carrier contract.Section C (statement of work) |
| R21 | The Contractor shall furnish the authorized Government representative a statement containing the names and handwritten signatures of persons authorized by the Contractor to receive and accept Government-owned product or property. The Contractor is required to provide the DLA Energy Contracting Officer/Property Administrator with written notification when previously authorized persons departSection C (statement of work) |
| R22 | To satisfy auditability requirements, DFSPs shall retain a minimum of three years (current fiscal year plus two additional years) of Inventory Documentation/Data on location. Source documents and data requiring retention beyond the three-year point shall be retired to a records retention center.Section C (statement of work) |
| R23 | The contractor shall provide DLA Energy copies of documents and/or provide any requested inventory information data/data within 3 business days. The contractor shall retain all documents listed below, and will upon request, scan and upload images of all documents into a US Government forms archive or records management storage system.Section C (statement of work) |
| R24 | The Contractor shall take all measures required by law and good business practice to prevent fuel spills (including, but not limited to, any spilling, leaking, pumping, pouring, emitting, emptying, or dumping into or onto any land or water).Section C (statement of work) |
| R25 | The Contractor shall not use the facilities (defined in FAR Part 45 GOVERNMENT PROPERTY) for any purpose other than that required for the performance of this contract.Section C (statement of work) |
| R26 | Public Key Infrastructure (PKI) certification is required when work performed under this contract/task order requires access to DLA/DLA Energy or United States Government information systems.Section C (statement of work) |
| R27 | The Contractor will provide the Contracting Officer or designated Contracting Officer’s Representative (COR) the roster of employees requiring PKI certificates.Section C (statement of work) |
| R28 | The Contractor shall comply with all environmental laws and regulations applicable to its operations under this contract, both those in effect on the date of award and those enacted afterward.Section C (statement of work) |
| R29 | The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination.Section F (deliveries) |
| R30 | Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to affect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality.Section F (deliveries) |
| R31 | The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver.Section F (deliveries) |
| R32 | Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels, jet lubricating oil, and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish, periodically inspect, clean such strainers, and repair same, if necessary, keeping a written record thereof.Section F (deliveries) |
| R33 | Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. The Contractor will furnish such seals. Seal numbers will be indicated on shipping documents.Section F (deliveries) |
| R34 | Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.Section F (deliveries) |
| R35 | The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading.Section F (deliveries) |
| R36 | All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS).Section F (deliveries) |
| R37 | In addition to gauging storage tanks to determine quantities issued or received, the Contractor will gauge each active storage tank daily and each inactive storage tank weekly and compute physical inventories or the purpose of detecting loss of products.Section F (deliveries) |
| R38 | the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.Section G |
| R39 | Offeror shall indicate below the complete mailing address (including the nine-digit zip code) to which remittances should be mailed if such address is other than that shown in Block 15a (Standard Form (SF) 33) for noncommercial items or Block 17a (SF 1449) for commercial items.Section G |
| R40 | Immediately upon the discovery of a petroleum spill, leak, or seepage involving Defense Logistics Agency Energy (DLA Energy) owned product, the Contractor shall notify, by telephone, (1) the Quality Representative, (2) the designated Defense Energy Region, and (3) the Administrative Contracting Officer (ACO). In addition, if the said spill, leak, or seepage has reached, or if it might possibly reach, navigable waters, the Contractor shall immediately notify the Coast Guard by telephone (800) 424-8802, the appropriate Federal and State officials designated in State laws, and the ACO.Section H (special requirements) |
| R41 | Immediately upon discovery of a petroleum spill, leak, or seepage, the Contractor shall take all practicable measures available to contain and prevent further spreading of such spill, leak, or seepage. Measures taken by the Contractor will be in compliance with all local, State, and Federal laws and regulations.Section H (special requirements) |
| R42 | Any Contractor whose terminal stores product exclusively for DLA Energy use shall prepare and submit an approved Spill Prevention Control and Countermeasure Plan, Oil Pollution Prevention Operations Manual, and Oil Spill Contingency Plan, as applicable. These documents shall be submitted to the ACO and the Defense Energy Region specified in the DESIGNATION OF THE DEFENSE ENERGY REGION contract text of this solicitation as soon as practicable after contract award, but no later than 60 days after award notification.Section H (special requirements) |
| R43 | Prior to beginning work on a contract, DLA requires all contractor personnel working on the Federally-controlled facility to have, at a minimum, an initiated National Agency Check with Written Inquiries (NACI) or NACI equivalent and favorable completion of a Federal Bureau of Investigation (FBI) fingerprint check.Section H (special requirements) |
| R44 | Contractor personnel must additionally receive operations security (OPSEC) and information security (INFOSEC) awareness training.Section H (special requirements) |
| R45 | Within 30 days after contract award, unless the Contracting Officer establishes a longer time period, the Contractor shall— (i) Have a written code of business ethics and conduct; and (ii) Make a copy of the code available to each employee engaged in performance of the contract.Section I (contract clauses) |
Recent awards in NAICS 493190
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-08-18 | ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512316611!TIRE,PNEUMATIC,VEHI | $113 |
| 2026-07-30 | ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512269330!TIRE,PNEUMATIC,VEHICULAR | $335,152 |
| 2026-07-30 | ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512269282!TIRE,PNEUMATIC,VEHICULAR | $89,692 |
| 2026-07-23 | ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260469!TIRE,PNEUMATIC,VEHI | $2,247 |
| 2026-07-23 | ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260531!TIRE,PNEUMATIC,VEHICULAR | $981 |
| 2026-07-23 | ASRC FEDERAL FACILITIES LOGISTICS, LLCDefense Logistics Agency · 8512260542!TIRE,PNEUMATIC,AIRCRAFT | $9,231 |
Source: USAspending.gov, retrieved 2026-11-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.