Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu: requirements and submission rules
10 requirements and 0 submission rules found in the solicitation documents for SP060026R0813. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | By virtue of the signature below, [Offeror] hereby provides consent to DLA Energy – FEE to provide access to its proprietary information to [Nongovernment Advisor] for the purposes of evaluating its proposal for the above named Solicitation. |
| R2 | detailed discussion of the standards, procedures, and/or specifications that must be complied with to meet each of the service standards criteria listed in Table L-1 of the RFP. |
| R3 | Detailed description of operations and maintenance policies and procedures, including: Policies and Procedures -- effectiveness of specific polices/procedures; Activities, Tests, and Inspections |
| R4 | Proposed workforce, position by position (from apprentice through Installation Project Manager) and the qualifications (training, certifications, experience, and education) that a new hire is required to have to fill each position |
| R5 | Description of the type(s) of work that is envisioned to be potentially performed by subcontractors vice in-house staff. |
| R6 | Methods of obtaining, reviewing, and implementing customer feedback; detailed description of policies, procedures, and techniques for ensuring quality work is performed |
| R7 | Plan for providing Specialty Skills Training for military personnel (if required by the Solicitation), including: Levels of Training -- skill level provided, scheduling, trainer qualifications, training demand, currency of curriculum; Location of Training |
| R8 | initial repair, replacement, and improvement activities (to be completed within the first 5 years of the contract) that are required to bring the utility system up to all applicable requirements and standards imposed by law, as well as the standards typically applied by the Offeror to its other utility systems |
| R9 | These facilities will remain available through Contract No. SP0600XXCXXXX for any future mobilization missions |
| R10 | All equipment in place and installed property will remain in these facilities. |
Recent awards in NAICS 221310
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-26 | SWK STADTWERKE KAISERSLAUTERN VERSORGUNGS-AGDepartment of the Air Force · WATER PLANT FILTERS FOR RAB | $223,344 |
| 2026-08-05 | RILEY COUNTY RURAL WATER DIST 1Department of the Army · CONTRACT FOR RURAL WATER DISTRICT #1, RILEY COUNTY, KS TO PROVIDE ADDITIONAL CAPACITY VIA ~12,000 LF OF 4 AND 2 INCH WATER LINE AND APPURTENANCES FOR THE CORPS OF ENGINEERS AT STOCKDALE PARK, TUTTLE C | $494,700 |
| 2026-08-04 | GTA CONTAINERS, LLCDepartment of the Army · FIVE-YEAR INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) PRODUCTION CONTRACT FOR THE WATER STORAGE DISTRIBUTION SYSTEM (WSDS). DELIVERY ORDER TO ESTABLISH AND FUND 13 FULL RATE PRODUCTION WSDS SYSTEMS | $6.42 million |
| 2026-07-10 | KATADYN NORTH AMERICA INC.Department of the Air Force · 35 OSS IS PROCURING THE BELOW DESALINATORS, - FORTY-NINE (49) EA. KATADYN MRODS (MROD-06-LL1-RES) | $112,774 |
| 2026-07-08 | VEOLIA WTS SERVICES USA INCDepartment of the Navy · TASK ORDER IS TO SUPPORT THE NEED TO KEEP PRODUCTION OF THE REACTORS FOR NUCLEAR VESSELS, VALVES, AND BOILERS IN CONTINUED PERFORMANCE FOR NNSY CVN-78 USS GERALD R. FORD. | $16,045 |
| 2026-07-07 | VASTGLOBE LOGISTICS LLCDepartment of the Navy · PURCHASE OF MICRON FILTERS | $11,470 |
Source: USAspending.gov, retrieved 2026-11-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.