A-E Cost Estimation Services: requirements and submission rules
18 requirements and 10 submission rules found in the solicitation documents for RFQ_481463. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 4.0 FORMS OF QUOTATION AND MANNER OF SUBMISSION A complete quotation, including the signed Quotation Pricing Sheet (Enclosure 2), must be received by BSA no later than the due date and time listed on page 1 of this RFQ.
- Questions Due Date: 20 Nov 2026 Quote Due Date & Time: 4 Dec 2026 at 5 PM EST Contract Type: Firm-Fixed Price Payment Terms: Net 30, Net 10 for Small Businesses
- Quotations, including their withdrawal or modification, received after the closing date shall be considered late.
- Email submissions must include the signed Quotation Pricing Sheet (Enclosure 2).
- All questions must be submitted via email.
- (see Clause 4.14) 4.6 Test and Inspection Procedures Test and inspection procedures required to demonstrate satisfactory completion of requirements must be prepared by the Supplier and submitted to the Buyer for approval sixty (60) calendar days prior to use of such procedures.
- 4.7.2 At least sixty (60) calendar days prior to use on items deliverable to the Buyer, the Supplier must submit to the Buyer copies of all applicable process procedures for review and approval.
- Revisions or changes to Buyer-approved special process procedures must be submitted to the Buyer for review and approval prior to implementation.
- In case of drop shipment, a copy of the certificate must be submitted to the Buyer at the time of shipment.
- The Supplier is required to: 4.18.1 Submit the first article(s) to the Buyer’s representative for test/inspection to be conducted at the Supplier’s facility by the Buyer’s representative.
Requirements
| ID | Requirement |
|---|---|
| R1 | It is the responsibility of the contractor to affirm its Representations and Certifications and size status are accurate and up to date in the System for Award Management (SAM) (www.SAM.gov). |
| R2 | The Offeror shall furnish all labor, services, and materials in strict accordance with the attached Draft Contract (Enclosure 1). |
| R3 | Accordingly, the contractors must furnish as part of the offer all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the company to (i) determine whether the product offered meets the salient characteristics requirements of the solicitation, and (ii) establish exactly what the company would be binding itself to purchase by making an offer. |
| R4 | The offeror shall provide the following information as it relates to their previous experience to meet contractual requirements: • Have prepared three (3) construction cost estimates for clients, where the work was valued at greater than $75 million. |
| R5 | The offeror shall provide the following information as it relates to their firm and key personnel’s previous experience to meet contract requirements: • At least one Estimator with ten (10) years or more experience estimating large scale projects 100,000 square feet or more. Must hold a Certified Professional Estimator (CPE) Certification from the American Society of Professional Estimators or equivalent. |
| R6 | The Contractor shall complete and return the Quotation Pricing Sheet (Enclosure 2) attached to this document. Prices shall be all inclusive and quoted in U.S. dollars, FOB, Brookhaven National Laboratory, Upton, Long Island, New York (freight included), including any import duties, customs, and associated costs, if applicable. |
| R7 | BSA requires all its vendors/contractors to be registered in the U.S. Government supplier database entitled System for Award Management (SAM) with their Unique Entity ID number (UEI #). |
| R8 | The successful contractor will be required to complete the following forms (if applicable): • Vendor ACH Authorization Form, Enclosure (3). • W-9 Form, Enclosure (4). |
| R9 | The Supplier must have and maintain an effective quality system that will, as a minimum, comply with all of the requirements as designated by the following: 3.1.1 A quality system certified/registered to the ISO 9001 standard: (latest revision as of the date of issuing the procurement documentation). 3.1.2 A quality system that meets the requirements of the ISO 9001 standard: “Quality Management Systems – Requirements” (latest revision as of the date of issuing the procurement documentation). 3.1.3 Conformance to Supplier’s/Manufacturer’s quality program or system. 3.1.4 Other: Refer to procurement documentation, (e.g. PO, Statement of Work [SOW], specifications, drawings) for quality requirements. |
| R10 | Supplier or Distributor must allow BSA representatives, BSA customers, and regulatory agencies right of entry into the Supplier’s facilities to determine and verify product, processes, records, personnel, material, procedures, and systems. |
| R11 | No change(s) are permitted to be made to any Buyer requirements, (e.g. part number, model number, etc.) without the prior written approval of the Buyer. |
| R12 | It is the responsibility of the Supplier to impose applicable requirements from this document upon their subcontractors. |
| R13 | The Supplier is responsible to provide items that conform to the requirements of the PO regardless of any assessments, surveillances, inspections and/or tests by the Buyer or its representatives at either the Supplier’ or Buyer’s facility. |
| R14 | The Supplier is responsible for notifying the Buyer of any recalls or alerts associated with this PO. |
| R15 | The Supplier must employ procedures that assure adequate protection of material and equipment during shipment and while in storage. Such protection must include special environmental packaging, as necessary. All items shipped (originally packaged or repackaged) to BNL or other locations cited in the PO or contract, must comply with the requirements for preservation, packaging and marking as stated in the latest revision of ASTM Standard D 3951 Standard Practice for Commercial Packaging. |
| R16 | The Supplier must calibrate any M&TE used in the fulfillment of the PO requirements against certified standards that are traceable to the National Institute of Standards and Technology (NIST), or some other recognized national or international standard, or physical constant. The Supplier must notify the Buyer of any condition found during the calibration, servicing or repair of measuring and test equipment that can affect the end item requirements. |
| R17 | The Supplier shall verify the procurement source and associated documentation certifying authenticity. Appropriate incoming inspection and / or test methods shall be used to detect potential suspect counterfeit items. The Supplier shall flow this requirement down to all sub-tier suppliers to prevent the inadvertent use of suspect counterfeit items. Distributors shall not modify, rework or repair any items shipped on this order. |
| R18 | Any and all product recall alerts, product bulletins, or safety alerts must be communicated by email directly to ProductRecallAlert@BNL.gov. Provide the Purchase Order Number(s) and names of purchasers with notification to assist BNL in locating and identifying the subject material. |
Recent awards in NAICS 541330
The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-28 | LEONARDO TECHNOLOGIES, INC.Department of Energy · IIJA FUNDING TECHNICAL AND ENGINEERING SUPPORT SERVICES FOR THE OFFICE OF HYDROCARBONS AND GEOTHERMAL ENERGY OFFICE ACTIVITIES INCLUDE PROVIDING SOUND PROFESSIONAL, TECHNICAL, AND PROGRAMMATIC APPROAC | $200,000 |
| 2026-10-26 | MSS SERVICES, INC.Department of Energy · INSPECTION SERVICES FOR YUMA SERVICE CENTER (YSC) SECURITY CAMERA AND ELECTRONIC SECURITY SYSTEM (ESS) INSTALLATION PROJECT | $54,403 |
| 2026-10-19 | MSS SERVICES, INC.Department of Energy · ALCOVA-NORTH CODY INSPECTION SERVICES - WESTERN AREA POWER ADMINISTRATION (WAPA) CONSTRUCTION INSPECTION SERVICES BLANKET PURCHASE AGREEMENT (BPA) - UPPER GREAT PLAINS, ROCKY MOUNTAIN, DESERT SOUTHWES | $37,673 |
| 2026-10-01 | HAZEN AND SAWYER, D.P.C.Federal Energy Regulatory Commission · ENVIRONMENTAL CONSULTING SERVICES | $91,600 |
| 2026-09-29 | KBENSKO CONSULTING, LLCFederal Energy Regulatory Commission · ENGINEERING GEOLOGIST SUBJECT MATTER EXPERT CONSULTING | $97,500 |
| 2026-09-28 | CONVERGE FEDERAL SOLUTIONS JV, LLCDepartment of Energy · NETL PITTSBURGH, PA B920 SWITCHGEAR REPLACEMENT ENGINEERING SERVICES & CONSTRUCTION SUPPORT | $120,652 |
Source: USAspending.gov, retrieved 2026-11-02. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.