RF Roof Replacement Project: requirements and submission rules

18 requirements and 0 submission rules found in the solicitation documents for RFP27-005JR. Use them as the start of your compliance matrix.

Solicitation number
RFP27-005JR
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / PRINCETON LAB - DOE CONTRACTOR
NAICS
238160
Set-aside
No Set aside used
Responses due
10 December 2026 (12 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • None detected automatically: read the instructions to offerors.

Requirements

IDRequirement
R1Provide all labor, tools, equipment and supervision required to facilitate the installation of new roofing in accordance with SOW titled: C-40 and C -41, RF Roof Replacement Project
R2*Please include the following document s with your proposal: (1) A Schedule of V alues (2) A progress schedule based on a notice -to-proceed date of 05 Jan 2027
R3Acceptance of Sample Subcontract terms and conditions. Please initial the applicable statement below in the space provided ( initial one statement only )
R4The Offeror agrees that this proposal will remain valid for 90 days from the closing date specified for this RFP.
R5PPPL will determine if an Offeror is a “responsible” prospective subcontractor, as the term is used in the Federal Acquisition Regulations (FAR) Subpart 9.1. Offerors determined not to be a responsible prospective subcontractor will not be eligible for award.
R6The Offeror shall provide a description of methods the offeror uses in managing construction on similar projects, including lower -tier subcontractor coordination. This should include organizational resources and experience in utilizing industry standard construction management software.
R7A consolidated list to include the name, position title, description of project responsibilities, full-time percentage, and resume for the following key personnel: (i) Project Manager (ii) Construction Superintendent (iii) Certified Safety Professional
R8Proposed key personnel must have experience successfully managing and supervising the construction of two (2) or more projects similar in scope or complexity to the RF Roof Replacement Project within the past ten (10) years.
R9Responsive Offerors shall list at least two (2) prior projects with references completed within the past ten (10) years that are of similar type, size, scope, and complexity to that described in the RFP.
R10Offerors shall include the following information about each project: a) Project title b) Contract amount at start and completion c) Description of work and location (project type, scope, size, etc.) d) Name, address, and telephone number of Owner or Owner’s Representative and Architect of Record e) A discussion of experienced delays and cost growth f) Any significant aspects worth noting
R11Three-year average EMR of 1.00 or less and a total recordable and DART case rate at or below 85% BLS TRC/DART Rate for heavy construction.
R12Submit copy of OSHA Forms 300 and 300A for 2024 – 2026
R13Submit explanation and/or supplemental data for periods that are out of tolerance.
R14Demonstrate that the Offeror’s 2024 – 2026 Insurance Experience Modification Rating averages equal to or less than 1.0 over a three-year period.
R15Provide backup documentation from an independent source, such as the insurance carrier, to verify ratings.
R16Joint ventures or teams shall submit the above information for each corporate entity in the joint venture or team.
R17The Offeror must submit their corporate ES&H Program (and discuss its application on the RF Roof Replacement Project) and Part 1 of the Construction Environmental Safety and Health Plan (Div. 1 Spec Section 013100), that includes acknowledgement regarding Worker Safety 10 CFR 851. Identify current and past projects that were certified under the OSHA Voluntary Protection Program.
R18The Offeror’s corporate quality program description shall be submitted along with the completed PQA Supplier Quality Survey. PPPL is interested in demonstrable capabilities to assure and control quality and information regarding how the Offeror will implement its Quality Assurance Program on this project

Recent awards in NAICS 238160

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-08-31SALTER COREYDepartment of Energy · REPLACE THE EXISTING ROOFING AT ELKTON REPEATER SOUTH DAKOTA AND SPALDING REPEATER IN NEBRASKA$23,777
2025-10-14NATIVE SOURCE ENTERPRISES, LLCDepartment of Energy · INSTALL ROOFING PAVERS AT THE CLARK REPEATER SITE$12,500
2025-07-28NATIVE SOURCE ENTERPRISES, LLCDepartment of Energy · REPLACE ROOFING AT THE HIGHMORE REPEATER$22,950
2025-07-01BRN GROUP LLCDepartment of Energy · SIOUX FALLS SUBSTATION, ROOF REPLACEMENT, WAREHOUSE, OFFICE, AND VEHICLE STORAGE BUILDING, SD$74,388
2025-03-10ELEVATION CONSTRUCTION OF TEXAS LLCDepartment of Energy · SIOUX FALLS SUBSTATION, ROOF REPLACEMENT, WAREHOUSE, OFFICE, AND VEHICLE STORAGE BUILDING, SD$0
2024-09-24TRI-STATE ROOFING CONTRACTORS, LLCDepartment of Energy · ROOF REPAIRS AND PREVENTATIVE MAINTENANCE$27,589

Source: USAspending.gov, retrieved 2026-11-03. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.