RFP SC-27-723 Hazardous & Flammable Gas Cabinets and Install: requirements and submission rules

32 requirements and 3 submission rules found in the solicitation documents for RFP-SC-27-723. Use them as the start of your compliance matrix.

Solicitation number
RFP-SC-27-723
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / AMES LABORATORY - DOE CONTRACTOR
NAICS
238290
Set-aside
No Set aside used
Responses due
08 January 2027 (41 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • SUBMIT your Representations and Certifications Supplemental to: Andrew Saxton via email at saxton@ameslab.gov.
  • If your firm is NOT registered in SAM, then you are required to complete both SECTIONS I (a) Entity Information and I (b) Business Size.
  • If your proposed cost for work is $10,000 or more, your firm MUST be registered in SAM, and you are required to complete SECTION I(a) only, & ALL Parts of SECTION II.

Requirements

IDRequirement
R1ALL suppliers and subcontractors that desire to be considered for a purchase order or subcontract award valued at $10,000 or more are required to register their company in the Official U.S. Government System for Award Management (SAM) and complete annual representations and certifications electronically in SAM accessed through www.sam.gov.
R2NEW DOMESTIC OR FOREIGN SUPPLIERS MUST ATTACH A COPY OF YOUR CURRENT IRS FORM W-9, OR W-8 BEN, ACCORDINGLY, TO THIS REPRESENTATIONS & CERTIFICATIONS SUPPLMENTAL DOCUMENT.Section I (contract clauses)
R3FOR AN EXISTING SUPPLIER THAT HAS PREVIOUSLY SUBMITTED TO THE LABORATORY A W-9 OR W-8 BEN AND NOW ITS COMPANY NAME OR ADDRESS HAS CHANGED, YOU MUST PROVIDE SUCH NOTICES ON YOUR COMPANY LETTERHEAD. A CURRENT W-9 OR W-8 BEN IS REQUIRED FOR COMPANY NAME CHANGES.Section I (contract clauses)
R4The Offeror shall list as foreign end products those end products manufactured in the United States that do not qualify as domestic end products. For those foreign end products that do not consist wholly or predominantly of iron or steel or a combination of both, the Offeror shall also indicate whether these foreign end products exceed 55 percent domestic content, except for those that are COTS items. If the percentage of the domestic content is unknown, select “no”.Section I (contract clauses)
R5The Offeror shall separately list the line item numbers of domestic end products that contain a critical component (see FAR 25.105).Section I (contract clauses)
R6The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.Section I (contract clauses)
R7Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including— (A) A description of the foreign and domestic construction materials; (B) Unit of measure; (C) Quantity; (D) Price; (E) Time of delivery or availability; (F) Location of the construction project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.Section I (contract clauses)
R8A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.Section I (contract clauses)
R9the offeror's response to this solicitation shall, to the extent feasible, complete the representation in paragraph (b) of this provision to either state that none of the data qualify as limited rights data or restricted computer software, or identify which of the data qualifies as limited rights data or restricted computer software.Section I (contract clauses)
R10The offeror further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will – (1) Obtain identical certifications from proposed subcontractors before the award of subcontracts under which the subcontractor will be subject to the Equal Opportunity clause; (2) Retain the certifications in the files; and (3) Forward the following notice to the proposed subcontractorsSection I (contract clauses)
R11Suspect/counterfeit parts shall not be used in the performance of any work resulting from this offer, whether on or off the Laboratory site, nor shall suspect/counterfeit parts be included in any supplies furnished as a result of this offer.Section I (contract clauses)
R12A PERSON AUTHORIZED TO MAKE LEGALLY BINDING COMMITMENTS ON BEHALF OF THE OFFEROR MUST SIGN BELOW. BY SIGNING BELOW, THE OFFEROR CERTIFIES, UNDER PERJURY OF LAW, THAT THESE REPRESENTATIONS AND CERTIFICATIONS SUPPLEMENTAL ARE ACCURATE, CURRENT, AND COMPLETE.Section I (contract clauses)
R13If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
R14If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026.Section I (contract clauses)
R15Prior to excavation and site planting on the job site, the contractor shall contact utility companies to locate underground utilities effecting the excavations and planting on the job site. Excavation shall not proceed until all utilities are located and indicated. The contractor shall maintain the identifying devices throughout the duration of the project.
R16The contractor shall comply with 10 CFR 851.C rules and regulations throughout the construction activities on the project.Section I (contract clauses)
R17Contractors shall verify all dimensions and conditions effecting the work shown on the contract documents. Any conflicts found shall be reported to the Architect before proceeding with the work.
R18During the process of work, all penetrations through walls, ceilings, and floors will require a permit to be filed to ensure that radiation scanning can be completed prior to work commencing.
R19All LOTO and electrical shutdowns will need to be communicated to the owner with ample amount of time for building wide notification that will need to be scheduled. See table for required timelines.
R20Every member of the construction crew will be required to be registered through TASF and have possession of a badge while on site.
R21All construction crew members must complete an Ames Lab site and safety orientation before beginning work.Section I (contract clauses)
R22Verify all legacy hazardous material in scope of work with Ames Lab ESH, including asbestos, radiation contamination, and beryllium contamination before work begins.
R23CONTRACTOR TO PURCHASE PARKING PASSES AND UTILIZE HIGHLIGHTED LOTSection I (contract clauses)
R24NOTIFY OWNER NOT LESS THAN THE FOLLOWING IN ADVANCE OF ACTIVITIES THAT WILL AFFECT OWNER'S OPERATIONS: 1. NO LESS THAN TWO (2) MONTHS AHEAD OF SCHEDULED ACTIVITY, PROVIDE ACCURACRY WITHIN ONE (1) WEEK. 2. NO LESS THAT TWO (2) WEEKS AHEAD OF SCHEDULED ACTIVITY, PROVIDE ACCURACT WITHIN ONE (1) DAY.Section I (contract clauses)
R25The contractor shall perform a fire flow test in accordance with NFPA 291 to verify the flow test data given above. The data given above shall be the basis of design unless the available pressure or flow has decreased. Notify owners representative if flow test data differs from the data above. A fire protection engineer or an engineer experienced in water flow testing shall perform or witness the required flow testing and sign the report prior to the first sprinkler system submittal.Section I (contract clauses)
R26Contractor shall prepare hydraulic calculations based upon the configuration of the actual system design as shown on contractor's shop drawings.
R27Contractor shall perform hydraulic calculations required to verify system modifications provide adequate flow and pressure to existing system components, as well as to new system components.
R28Prior to tying into any existing exhaust ductwork, the contractor shall notify and coordinate with Ames Lab ESH Industrial Hygiene and Health Physics a minimum of 10 calendar days in advance so the owner can verify the presence of hazards. Connection work shall not proceed until the owner has confirmed the duct is clear for work.Section I (contract clauses)
R29Contractor shall secure and pay all fees and permits pertaining to work.
R30Work indicated in these documents shall be performed by individuals licensed to perform such work by the state in which the work is performed and adequately qualified to work on the associated eqmt, system, etc.
R31Perform elec work on de-energized systems only. Where work on existing systems will require interruption of elec service, temporary provisions acceptable to the owner for temporary power shall be utilized until the work is complete.Section I (contract clauses)
R32Obtain all permits required to fully complete indicated work.

Recent awards in NAICS 238290

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-10-27UNIVERSALTRADES, LLCDepartment of Energy · SEMI-ANNUAL OVERHEAD DOOR MAINTENANCE FOR THE SDMO REGION, EO 14398$48,288
2026-09-25P. B. DISTRIBUTING CO INCDepartment of Energy · SEMI-ANNUAL OVERHEAD DOOR MAINTENANCE FOR THE SDMO REGION, EO 14398$0
2026-09-01MAYOINTHEMIX LLCDepartment of Energy · WESTERN AREA POWER ADMINISTRATION (WAPA) ROCKY MOUNTAIN REGION (RMR) HAS A REQUIREMENT FOR A PROJECT TITLED LOVELAND FIELD MAINTENANCE BUILDING DOOR TO REMOVE AND DISPOSE OF EXISTING DOORS, FRAMES, GL$45,764
2026-05-15UNDERWOOD FEDERAL SOLUTIONS LLCDepartment of Energy · REPLACE DOORS AND FACIA AT THE ARMOUR O&M$14,510
2026-04-20COLORADO CUSTOM LIFT INCDepartment of Energy · ELEVATOR SERVICES FOR RMR MONTROSE COUNTY, CO LOCATION$521
2026-04-09BRAZOS VALLEY ENTERPRISE LLCDepartment of Energy · DL ELEC BUILDING GARAGE DOOR REPLACEMENT & ADDITION$38,260

Source: USAspending.gov, retrieved 2026-11-17. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.