A-E Services for Electron Injector Complex: requirements and submission rules

28 requirements and 1 submission rules found in the solicitation documents for RFP_476957. Use them as the start of your compliance matrix.

Solicitation number
RFP_476957
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / BROOKHAVEN NATL LAB -DOE CONTRACTOR
NAICS
541330
Set-aside
No Set aside used
Responses due
30 November 2026 (2 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • An application with drawings, specifi cations and Engineers Report and Letter of Compliance shall be submitted to the Suffolk County Department of Health for approval.

Requirements

IDRequirement
R1BNL and the contractor will obtain the services of an independent soils laboratory to conduct in-place compaction tests throughout construction.A.9
R2For the design of facilities and equipment and purchase of equipment NFPA 70-2017 or the most recent version is acceptable for use. Designers and vendors must specify which version is being used.
R3The following requirements are in the Project Specifications and will be the responsibility of the Contractor: Utilize Low-Emitting Materials. Develop and implement an IAQ During Construction Plan.
R4The following requirements are in the Project Specifications and will be the responsibility of the Contractor: Meet the Resource Conservation and Recovery Act (RCRA) requirements for recycled content. Meet Section 9002 of the Farm Security and Rural Investment Act (FSRIA) requirements for the use of bio-based materials. Develop and implement a Construction Waste Management Plan and divert at least 50% of the construction waste from landfills.
R5All cable tray / rack systems are to be directly supported on slabs-on-grade. Hanging cable tray / rack systems from superstructure of pre-fabricated metal enclosures and pre-engineered metal buildings is strictly prohibited.
R6All vibration-sensitive equipment identified here must be structurally isolatedA.9
R7All motorized equipment must include local isolators to mitigate vibration and protect against structural interference.A.9
R8For frost protection, exterior footings must be embedded at least 3.5 feet below the finished grade. Interior footings in heated areas should be at least 1.5 feet below the finished floor slab.A.9
R9Micropiles shall have a 9.625-inch diameter, 0.500-inch-thick Grade 50 steel casing, and a full-length #9 Grade 75 threaded bar, grouted to a minimum strength of 4,000 psi. The casing shall extend at least 20 feet below the pile cap, with a minimum 15-foot bond length pressure-grouted to 75 psi.A.9
R10Backfill placement and compaction should follow best practices, with hand-operated compactors within 10 feet of the walls to prevent excessive lateral soil pressures.A.9
R11Strict excavation and installation procedures must be understood and followed by the Contractor to ensure stability is maintained during all modifications to existing corrugated steel structures.A.9
R12It should be clearly noted that penetrations and trenches within the existing IR10 tunnel slab is strictly prohibited, as the slab is a crucial piece of the arch plate system’s stability in resisting thrust forces.A.9
R13For all buildings all underslab sanitary waste and vent piping 3 inch and larger will be video inspected after installation and before slab pour to verify installation and make possible repairs prior to final slab pour.A.9
R14For all buildings all underslab storm drain piping 3 inch and larger will be video inspected after installation and before slab pour to verify installation and make possible repairs prior to final slab pour.A.9
R15The Contractor will furnish and install all devices and circuits and mount the control panel(s). Brookhaven staff will make all final connections of the circuits to the control panel.A.9
R16Emergency Responder Communication Enhancement System (ERCES): These systems must meet survivability requirements to ensure it will continue to operate during a fire. The system must have redundant primary power sources and stand-by or back-up power to operate at 100% capacity for at least 12 hours.
R17All luminaires will have field-replaceable drivers and boards. The replacement of an entire fixture due to component failure is not permitted.
R18Contractor to provide adequate amount of fiber cable feed into the new facility.
R19Please make note “No” new telecommunications cable will utilize the tunnel; all communications cabling will be routed in the existing manhole infrastructure.
R20The work area conduits shall not be filled with multiple cables beyond 40% fill. No work area conduit will be installed below grade. The work area conduits shall be sized to support the initial installation of cable, plus a minimum of 35% growth.A.9
R21Access control systems are IT Systems that require complete Certification and Accreditation and must obtain Authority to Operate before connecting to the network. Access control systems shall be cyber secured to national cybersecurity standards (NIST 800 or the ISA 62443 series).A.9
R22Electric door locks will be fail secure (apply power to unlock/cut power to lock) and shall utilize 24VDC power... Key cylinders to override the electric lock shall be provided in order to facilitate entry into the building in event of power outages exceeding battery capacity. Door hardware power supplies will be included in the security design and furnished and installed by the security contractor adjacent to iSTAR panels.A.9
R23Contractor will furnish and install a four-channel media converter to be mounted in an existing data rack in Building 631 in order to tie the cameras into the existing security network.A.9
R24The Contractor will designate commissioning team members for each subcontractor responsible for installation, startup and operation of associated equipment and systems.
R25Startup reports and Prefunctional Checklists executed by Contractor are utilized to achieve this [verify work is installed in accordance with Contract Documents].A.9
R26Functional Tests executed by Contractor and witnessed by the Commissioning Authority are utilized to achieve this [verify and document functional performance].A.9
R27Detailed operation and maintenance (O&M) data submittals by Contractor are utilized to achieve this [verify O&M manuals are complete].A.9
R28Formal training conducted by Contractor is utilized to achieve this [verify Owner's operating personnel are adequately trained].A.9

Recent awards in NAICS 541330

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-10-28LEONARDO TECHNOLOGIES, INC.Department of Energy · IIJA FUNDING TECHNICAL AND ENGINEERING SUPPORT SERVICES FOR THE OFFICE OF HYDROCARBONS AND GEOTHERMAL ENERGY OFFICE ACTIVITIES INCLUDE PROVIDING SOUND PROFESSIONAL, TECHNICAL, AND PROGRAMMATIC APPROAC$200,000
2026-10-26MSS SERVICES, INC.Department of Energy · INSPECTION SERVICES FOR YUMA SERVICE CENTER (YSC) SECURITY CAMERA AND ELECTRONIC SECURITY SYSTEM (ESS) INSTALLATION PROJECT$54,403
2026-10-19MSS SERVICES, INC.Department of Energy · ALCOVA-NORTH CODY INSPECTION SERVICES - WESTERN AREA POWER ADMINISTRATION (WAPA) CONSTRUCTION INSPECTION SERVICES BLANKET PURCHASE AGREEMENT (BPA) - UPPER GREAT PLAINS, ROCKY MOUNTAIN, DESERT SOUTHWES$37,673
2026-10-01HAZEN AND SAWYER, D.P.C.Federal Energy Regulatory Commission · ENVIRONMENTAL CONSULTING SERVICES$91,600
2026-09-29KBENSKO CONSULTING, LLCFederal Energy Regulatory Commission · ENGINEERING GEOLOGIST SUBJECT MATTER EXPERT CONSULTING$97,500
2026-09-28CONVERGE FEDERAL SOLUTIONS JV, LLCDepartment of Energy · NETL PITTSBURGH, PA B920 SWITCHGEAR REPLACEMENT ENGINEERING SERVICES & CONSTRUCTION SUPPORT$120,652

Source: USAspending.gov, retrieved 2026-10-30. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.