KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS: requirements and submission rules

44 requirements and 15 submission rules found in the solicitation documents for RFP-383167-CD. Use them as the start of your compliance matrix.

Solicitation number
RFP-383167-CD
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / FERMILAB - DOE CONTRACTOR
NAICS
237130
Set-aside
No Set aside used
Responses due
18 December 2026 (20 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • The submittal shall contain the same information pertaining to the original specified product for purposes of comparison.
  • Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.
  • BY (Signature in ink)(Print or Type Name) TITLE (Print or Type) REQUEST FOR PROPOSAL NO: 383167-CD Kautz Road Substation Construction, UIP Subproject 2- KRS December 18, 2026, 4:00 p.m./Central Time All proposal to be sent electronically to cdaley@fnal.gov TITLE OF PROJECT: DUE DATE AND TIME: SUBMITTAL LOCATION: THE OFFEROR SHALL SUBMIT THIS COMPLETED FORM WITH THEIR WRITTEN PROPOSAL
  • Submit 10 lb samples of each material to be used.
  • When an application shows completion of an item, submit final waivers no later than the next application submitted after showing completion.
  • The General Contractor shall submit to FermiForward one (1) printed copy and one (1) electronic copy in Adobe portable document format (PDF).
  • Submit Construction schedule no later than 45 days after the Notice of Award.
  • These drawings shall be submitted not later than the approved schedule for shop drawing transmittal, shall contain all required detailed information, and shall be submitted in logical order to facilitate proper review.
  • Submit PDF copies within seven (7) days of end of each training module.
  • Shop drawings and schedules of all trades shall be submitted by the General Contractor, who shall indicate by signed stamp on the drawings, that he has checked the shop drawings and that the work shown is in accordance with the Subcontract requirements and that it has been checked for dimension and relationship with the work of all trades.
  • Quality Control Inspector Qualifications: Along with Quality Control Plan, Contractor shall submit written qualifications for all inspectors to be assigned Quality Control functions for structural steel work, including general inspection, bolting inspection, welding inspection, and non-destructive testing.
  • Provide adequate time margins between device characteristics such that selective operation is achieved.
  • Submit certification signed by the producer certifying that recycled crushed concrete complies with IEPA requirements as “clean” containing no contaminates if any used.
  • Within ten (10) business days after subcontract award, the General contractor shall submit the following to FermiForward for acceptance.
  • These items must be submitted and accepted by FermiForward prior issuance of NTP.

Requirements

IDRequirement
R1Please enter your total firm fixed price in words and numbers: (Dollars)($ )Firm Fixed Price
R2This Offer may be accepted for a period of One Hundred Twenty (120) calendar days after the opening date unless the offeror specifies a longer acceptance period than FFDG’s minimum requirement.
R3The Subcontractor Annual Representations & Certifications (SARC) is made a part of this subcontract.
R4ENCLOSED IS BID GUARANTEE, CONSISTING OF: IN THE AMOUNT OF
R5All offering entities are directed to enter pricing for the lump sum, fixed price proposed for the entire specified project on the “Total Proposal” Price line above.
R6Offerors are to indicate on each Alternate whether their pricing would be an ADD or a DEDUCT to/from the Base Bid Amount above
R7Corporate Quality Assurance Plan: The General Contractor shall furnish with the bid or proposal a copy of their corporate Quality Assurance Plan. Failure to submit such a document could constitute a non-responsive bid or proposal.
R8Submittals with General Contractor’s proposal: 1. Construction Environmental Safety and Health Certification, which includes acknowledgement regarding Worker Safety 10 CFR 851; (See Article 1.8); 2. Experience Modification Rating (EMR) Rates and Occupational Safety Health Administration (OSHA) 300 log for last three years. Reference the Fermilab Subcontractor Safety Information Questionnaire; 3. General Contractor’s ES&H Program (if required by Article 1.9); and 4. If required by Section 01 00 10 , Resume’ of the General Contractor’s Safety Representative.
R9APPENDIX B – SCHEDULE OF TECHNICAL REQUIREMENTS: Vendors must complete this form and attach it to their quotation. [345kV MOTOR OPERATED HORIZONTAL BREAK DISCONNECT SWITCH]
R10The following documentation shall be provided by the manufacturer as a part of the proposal: 1. Preliminary outline drawings. 2. A complete list of exceptions to the specification listed by specification paragraph number or a written statement indicating complete compliance with the specification. 3. Description of the manufacturer’s warranty. [Harmonic Filter - Reactors]
R11The following documentation shall be provided by the manufacturer as a part of the proposal: 1. Preliminary outline drawings. 2. Fully completed Harmonic Filter Resistor Proposal Data Sheets (Section 3.8). 3. A complete list of exceptions to the specification listed by specification paragraph number or a written statement indicating complete compliance with the specification. Exceptions to this specification may result in the proposal being disqualified. 4. Description of the manufacturer’s warranty. [Harmonic Filter - Resistors]
R12The following documentation shall be provided by the manufacturer as a part of the proposal: 1. Preliminary outline drawings. 2. Preliminary one-line diagrams and fuse loss protection schematics. 3. Method by which simulations/calculations will be accomplished. 4. A complete list of exceptions to the specification listed by specification paragraph number or a written statement indicating complete compliance with the specification. 5. Fully completed Capacitor Bank Proposal Data Sheets (Section 3.10). 6. Description of the manufacturer’s warranty. [Harmonic Filter - Capacitors]
R13The General Contractor shall identify the personnel requiring access to the WBPMS within fifteen (15) working days after the Subcontract Award.
R14The General Contractor shall participate in a preconstruction conference no later than 15 days after Subcontract Award.
R15Under no circumstances shall any excavation work be performed without the FermiForward-Coordinated JULIE for all areas of excavation.
R16General Contractor Safety Representative is required on the project. Reference Section 01 31 00, Article 1.15 for further information... the General Contractor’s Safety Representative shall have completed the OSHA 30-hour construction safety course and have a minimum of 10 years of construction safety experience consistent with the type of activities included in the scope of work.
R17FermiForward also requires the General Contractor Field Superintendent to have completed an OSHA 30-hour construction safety course.
R18As connections to existing MV infrastructure are needed, FermiForward’s Lockout /Tagout (LOTO) II training will be required.
R19All individuals requiring access to the FermiForward secured site must possess a valid Real ID or other acceptable document as listed on Fermilab website... Work taking place outside of the FermiForward secured site as defined by Guardhouse location does not require a valid Real ID.
R20It is expected that the General contractor will fully utilize Building Information Modelling, up to a minimum of Level of Development (LOD) 400, which shall be created using the latest version of Revit.
R21If a basis of design product does not meet compliance per the Buy American Act it will be the responsibility of the General Contractor to select and equivalent product that satisfies all Buy American Act requirements.
R22The General Contractor shall hold and save FermiForward and the Government, its officers and agents, free and harmless from liability of any nature occasioned by the General contractor’s performance.
R23The General contractor shall be responsible for receiving, unloading, unpacking, inventorying, and inspecting the FermiForward-furnished materials, and provide FermiForward with a written report of findings and/or discrepancies.
R24The General contractor must install electrical power distribution with ground-fault circuit protection, subject to FermiForward approval.
R25When Fermilab toilet facilities are not available to the General contractor, the General contractor shall provide an adequately serviced chemical toilet for every twenty (20) personnel on the project.
R26The General contractor is required to notify the FermiForward Construction Coordinator prior to the commencement of any regulated waste generation and off -site shipments of any waste materials destined for disposal.
R27The General contractor shall provide and maintain locked construction fences around the construction limits and as required for the protection of public and FermiForward employees. Provide signage at all entrances to the construction site with the General contractor ’s company name and contact information. Signage shall include “ Danger”, “Construction Area”, “Do Not Enter”.
R28Substitutions for Convenience are not permitted.
R29Develop, submit, and implement a Construction Waste Management plan to recycle or salvage at a minimum 50 percent by weight, excluding metals, of the non-hazardous construction, demolition and land clearing materials, excluding soil, for compliance with DOE Guiding Principles.
R30All fall hazards equal to or greater than six (6) feet will have 100% fall protection for all General Contractor and Trade Sub-contractor employees.
R31Provide EPDs covering concrete mixtures which account for a minimum of 90% of concrete by volume, and for a minimum of 90% of steel reinforcement by weight
R32A minimum of 50% of the wood materials used for formwork (e.g., dimensional lumber, plywood, other engineered wood products) shall be “FSC Certified” products which have been harvested in accordance with the rules of the Forest Stewardship Council (www.fscus.org)... The FSC requirement may be satisfied by utilizing salvaged wood materials in the same percentage.
R33Concrete reinforcement shall contain a minimum of 90% combined post-industrial and post-consumer recycled content where the percentage of recycled content is based on the weight of the component materials.
R34Provide EPDs covering steel shapes which account for a minimum of 90% of steel by weight
R35The Contractor is responsible for the design of connections when they are not fully defined on the Contract Documents. The Engineer shall be licensed in the state in which the project is located.
R36The fabricator shall have a minimum of 5 years experience in similar types of fabrication... The erector shall have a minimum of 5 years experience in similar types of erection.
R37The manufacturer of this equipment shall have produced similar electrical equipment for a minimum period of ten (10) years. When requested by the Engineer, an acceptable list of installations with similar equipment shall be provided demonstrating compliance with this requirement. [Medium Voltage Cable Bus]
R38The manufacturer shall provide eighteen (18) months warranty from the date of shipment against any cable bus failure when installed in compliance with manufacturer’s written instructions and any applicable national or local code.
R39CCVT shall be covered by a five-year warranty from date of first energization against failure due to design or to defects in workmanship or material.
R40Warranty Period Five years, effective from the date product is received on site by the Contractor. [Dry-Type, Medium-Voltage Transformers]
R41Warranty Period: Five years from date of Substantial Completion. [Diesel Engine Generators]
R42Warranty Period: Five years from date of Substantial Completion. [Digital, Addressable Fire-Alarm System]
R43The structure of the Telecom building shall be designed and constructed to criteria in Section 4.2, Attachment 2, and in accordance with the IBC 2021. A structural analysis report prepared and sealed by a Licensed Structural Engineer (S.E.) in the State of Illinois shall be submitted.
R44The Vendor is required to meet all Illinois state requirements for the construction, inspection, certification and approval of the telecom building.

Recent awards in NAICS 237130

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-24FOUR TRIBES CIVIL CONSTRUCTION LLCDepartment of Energy · EO 14398, KESWICK SUBSTATION AND REDDING MAINTENANCE FACILITY CABLE AND WAVEGUIDE BRIDGE PROJECT$373,652
2026-09-23SITE WORK SOLUTIONSDepartment of Energy · WESTERN AREA POWER ADMINISTRATION (WAPA) REQUIREMENT TO REPAIR TWO (2) AUTOMATED SLIDING ENTRY GATES AT THE SIERRA NEVADA REGION (SNR) HEADQUARTERS FACILITY LOCATED IN FOLSOM, CA. WORK SHALL BE PERFOR$94,600
2026-09-23COMPLETE CONCRETE, INC.Department of Energy · CHEYENNE AREA COMM BUILDING ELECTRICAL REPAIRS$563,692
2026-09-16COMPLETE CONCRETE, INC.Department of Energy · MIDLAND REPEATER - EROSION AND FENCE REPAIR PROJECT, SOUTH DAKOTA$78,748
2026-09-16ADDISON CONSTRUCTION CODepartment of Energy · THE STEGALL SUBSTATION STAGE 07 PHASE 01 PROJECT TO REPLACE END OF LIFE EQUIPMENT AND INSTALLS A NEW CONTROL BUILDING.$441,986
2026-09-09COMPLETE CONCRETE, INC.Department of Energy · ALCOVA-NORTH CODY BREAKER FOUNDATIONS REPLACEMENT$148,709

Source: USAspending.gov, retrieved 2026-11-06. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.