NSF Ecosystem for Low-dimensional Electronics: Growth, Assembly, Nanoelectronics, and Translation (NSF ELEGANT): requirements and submission rules
23 requirements and 6 submission rules found in the solicitation documents for NSF-OTASO-FY26-ELEGANT. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 6.0 Proposal Format Proposals shall be in 12-point font on letter-sized pages with 1" margins, submitted as a single PDF.
- 1 Technology, Innovation and Partnerships (TIP) Directorate Ecosystem for Low-dimensional Electronics: Growth, Assembly, Nanoelectronics, and Translation (ELEGANT) OTHER TRANSACTION AGREEMENT SOLUTIONS OFFERING (OTASO) Solicitation Number: NSF-OTASO-FY26-ELEGANT Issue Date: Thursday, September 17, 2026 Proposal Due Date: Friday, December 18, 2026 Program Director: Michael Huff, Ph.D.
- Eastern Time on December 18, 2026 and must be submitted as a single PDF file to pkbreen@nsf.gov with the subject line: NSF ELEGANT Proposal Submission — [Ecosystem Coordinator] or [Expert Performer Team — Theme Name], as applicable.
- Ecosystem Coordinator proposals shall not exceed 20 single-sided pages and Expert Perform Team Proposals shall not exceed 25 pages, exclusive of the title page and appendices.
- All proposing organizations must be actively registered in SAM (www.sam.gov) prior to submitting a proposal.
- Questions must be submitted to pkbreen@nsf.gov by 5:00 p.m.
Requirements
| ID | Requirement |
|---|---|
| R1 | Every activity funded under ELEGANT must be in service of an industry-adoptable Translational Endpoint — the industry-adoptable deliverable against which performers are selected and held accountable. |
| R2 | Strong and sustained industry participation is a central program requirement. |
| R3 | An organization may submit a proposal as Ecosystem Coordinator or as an Expert Performer Team, but not both. |
| R4 | All offerors must be U.S.-based incorporated entities — institutions of higher education, for-profit organizations, nonprofit organizations, or formally established consortia of such entities. |
| R5 | Each proposal must identify a Principal Director, affiliated with and a full-time employee of the lead organization, who will be responsible for a resulting award. |
| R6 | Proposals may also include a Co-Principal Director, who, must also be a full-time employee of the proposing organization. |
| R7 | Individuals may only be named as Principal Director or Co-Principal Director on one proposal. |
| R8 | Foreign sub-awardees are not permitted. |
| R9 | Prime awardees must retain substantive technical responsibility. |
| R10 | Organizations wishing to collaborate must do so through a prime awardee/sub-awardee structure; NSF will not issue separate OT Agreements to sub-awardees. |
| R11 | Funded work shall overwhelmingly be performed in the United States, with use of domestic fabrication, characterization, and testing infrastructure to the maximum extent practicable. |
| R12 | Additional sub-awardees proposed after award require NSF Agreement Officer prior written approval. |
| R13 | Title Page (one page; excluded from page limit). Organization name, UEI number, point of contact; proposed Principal Director and any Co-Principal Directors; and major proposed sub-awardees whose anticipated sub-award value exceeds 10 percent of the total proposed budget ("Major Sub-Awardees"), with organization name, UEI, Principal Investigator or equivalent, and a one-sentence role description for each. This page must identify the target Translation Theme(s) or that the proposal is for the Ecosystem Coordinator role. |
| R14 | Appendix A: Budget and Justification (excluded from page limit). A 6-year budget broken out by annual performance period with sub-totals for each 2-year phase, including a detailed Year 1 milestone payment structure with associated KPIs and performance-based metrics, and planning-level budget estimates, KPIs and metrics for Years 2–6. Costs shall be presented at the total team level, with each Major Sub-Awardee's costs separately identified and justified. The KPI, metrics and milestone payment structure shall be tied to the Coordination and Support Plan (for Coordinator role) or theTranslation Strategy and Approach (for Expert roles), including an explicit mapping of proposed KPIs to the applicable Go/No-Go milestone(s). |
| R15 | If the team is proposing industry cost-share contributions, identify each contribution separately, including its form, anticipated value, and applicable phase. |
| R16 | Appendix B: CVs and Current and Pending Support (excluded from page limit). For research security purposes all senior and key personnel must submit CVs and current and pending support disclosures and foreign connection disclosures on NSF-approved forms. |
| R17 | Appendix C: IP and Data Management Plan (excluded from page limit). Include a description of pre-existing IP licensing relationships relevant to ELEGANT. |
| R18 | Appendix D: Letters of Commitment (excluded from page limit). Signed one-page letters from parties (other than the proposer and sub-awardees) who are contributing meaningful value to the effort — such as providing in-kind resources, technical expertise, facility or equipment access, or data. Include a description of the party's intended role. |
| R19 | 6.2 Ecosystem Coordinator Specific Elements: 6.2.1 Coordination and Support Plan. Proposed approach to cross-theme technical integration, program-wide milestone tracking, and program coordination, including: Pollinator and Shepherd recruitment, deployment, and management; roadmap development; IP management; standards engagement; and ELEGANT Industry Secretariat support. The plan should be aligned with and cross-reference the milestones, KPIs and metrics in Appendix A. 6.2.2 Experience and Qualifications. Organizational and personnel experience in: semiconductor roadmapping, including industry alignment; large-scale R&D program coordination; advanced microelectronics; IP management, licensing, and technology transfer; standards and roadmap development; and multi-stakeholder technology translation programs. 6.2.3 Industry Relationships. Existing relationships with the domestic semiconductor ecosystem — manufacturers, equipment suppliers, materials suppliers, EDA vendors, and standards bodies — relevant to ELEGANT's coordination and transition objectives. 6.2.4 Conflicts of Interest. NSF will assess conflicts of interest during negotiation and work with performers to develop a plan to mitigate such conflicts. |
| R20 | 6.3 Expert Performer Team Specific Elements: 6.3.1 Translation Strategy and Approach. Proposed approach to achieving the target Theme's Translational Endpoint, including: technical approach and innovations; anticipated outcomes at the end of each Phase; strategy for achieving Go/No-Go milestone(s); approach to integrating with adjacent Teams and Themes; and, for Themes subject to parallel investment, explanation of why the proposed approach is most likely to survive down-selection. The plan should be aligned with and cross-reference the milestones, KPIs and metrics in Appendix A. 6.3.2 Experience and Qualifications. Organizational and personnel experience in the specific technical domain of the target Theme; lab-to-fab translation in semiconductor or advanced materials; industry collaboration; and milestone-driven execution of large R&D programs. 6.3.3 Industry Partnerships. Description of the team's strategy for developing and sustaining partnerships, including organizations such as peers, suppliers, customers, etc. that have already expressed interest in collaborating, the nature of their anticipated involvement, and the plan for deepening engagement as program results mature. Proposals should describe how the team will attract and formalize partnerships in advance of Go/No-Go 1 and 2. 6.3.4 Workforce Development. Anticipated workforce gaps and capability needs in the target Theme's domain, and proposed strategies for addressing them, including integration of students, trainees, early-career researchers, and technical staff. |
| R21 | Recording by offerors is strictly prohibited. |
| R22 | In compliance with the CHIPS and Science Act of 2022, Section 10636 (person or entity of concern prohibition) (42 U.S.C. 19235) and Section 10632 (malign foreign talent program prohibition) (42 U.S.C. § 19232), the following are not eligible to serve as ELEGANT Ecosystem Coordinator or Expert Performer Teams or otherwise participate under this solicitation: U.S. Proscribed Party Lists... Any “foreign entities of concern” as defined in section 10638(3) of the CHIPS and Science Act of 2022... Individuals who are a party to a Malign Foreign Talent Recruitment Program. |
| R23 | NSF requires research security training certifications from OT contractors identified as senior/key personnel. |
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.