APL-67 GYM MOD, KETTLE LEG REPAIR, TP HOLDER INSTALL: requirements and submission rules
23 requirements and 15 submission rules found in the solicitation documents for N6264927RA003. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1.
- Proposal Due Date: All copies of proposals shall be received by the Government no later than the date specified in SF33 block 9 (Front Page) of the Solicitation.
- OFFER: Offerors must provide all information required by this solicitation no later than 23 NOV 2026 at 10: 00 am Japan Standard Time (JST) 5.
- Questions shall be submitted no later than 17 NOV 2026 10:00 AM Japan Standard Time (JST), to ensure the Government is able to adequately address and respond to questions submitted.
- In accordance with DFARS Clause 252.246-7006 and DFARS PGI 246-710-70, Offerors will be required to complete and submit ATTACHMENT (IV) listed in Section J as part of their proposal package and ATTACHMENT (V) shall be completed no later than when the warranted items are presented for receipt and/or acceptance.
- The Contractor is required to submit a production schedule encompassing, to the C-1.5 Integrated Production Schedule: maximum extent possible, all contractor work requirements to the Government at the following milestones: 1.
- The contractor is required to ensure the schedule is submitted to the project team in order to integrate with existing project schedule and mitigate risks due to space/location constraints to avoid work stoppages.
- Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028 "Over and Above Work").
- Submit all CFRs to SRF-JRMC within five (5) working days of C-3.1 Condition Found Notification to Government: discovery of the condition.
- The Contractor shall submit all installation access applications to the FLEACT Yokosuka Visitor Control Center (VCC).
- The Contractor shall submit all prescribed documents (listed below) to the Government to facilitate the required security checks for all personnel requesting access. a.
- To submit recommended contract language to be incorporated into the Naval Supply Systems Command (NAVSUP) Contracts Handbook (CH) as NAVSUP component text, the language must not meet the requirements for a regulation clarification or change.
- In these cases, the government employee must submit a Visitor Access Request (VAR) to the main gate or applicable processing entity for your facility and assume responsibility to escort those without CAC Credentials.
- START-UP PERIOD All contractor resource onboarding documents must be submitted via the prime contractor.
- Title Date Change ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ Any changes provided by the Offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.
Requirements
| ID | Requirement |
|---|---|
| R1 | Firms who do not possess an active U.S MSRA/ABR as a Prime Contractor are ineligible for award.Section A |
| R2 | This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 252.225-7042.Section A |
| R3 | any offeror intending to provide a proposal to this solicitation shall request access by sending an email to: Irene.a.saito.civ@us.navy.mil, miwa.takahashi2.ln@us.navy.mil by 17 NOV 2026 10:00 am JST.Section A |
| R4 | The contractor is required to submit an itemized breakdown of the total price proposal using ATTACHMENT II Price Proposal Breakdown Sheet provided in Section J. Failure to properly complete and submit ATTACHMENT II by the specified closing date may cause rejection of the proposal.Section B |
| R5 | In accordance with paragraph (c) of the clause FAR 52.229-6, 'TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013),' the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations.Section H (special requirements) |
| R6 | The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Safety Data Sheet submitted under this contract.Section I (contract clauses) |
| R7 | The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause.Section I (contract clauses) |
| R8 | If the offeror deletes or modifies subparagraph (a)(2) above, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.Section K (representations) |
| R9 | If the Offeror has represented in paragraph (d) of this provision that it 'will provide covered defense telecommunications equipment or services,' the Offeror shall provide the following information as part of the offer: (1) A description of all covered defense telecommunications equipment and services offered... (2) An explanation of the proposed use of covered defense telecommunications equipment and services... (3) For services, the entity providing the covered defense telecommunications services... (4) For equipment, the entity that produced or provided the covered defense telecommunications equipment...Section K (representations) |
| R10 | The Offeror shall certify that they currently hold an active U.S. Navy MSRA/ABR Agreement, or expect to complete the MSRA/ABR certification process prior to the projected contract award date, in order for their offer to be considered.Section L (instructions to offerors) |
| R11 | The Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation.Section L (instructions to offerors) |
| R12 | Offerors shall fill in block 12 in front page of Standard Form 33 (SF 33) with 90 days.Section L (instructions to offerors) |
| R13 | Offerors shall include all anticipated testing work/T-Phase, to include testing work for anticipated standard interference work in your proposal.Section L (instructions to offerors) |
| R14 | Offerors are instructed to submit their proposal electronically via email to the personnel serving as POC for this procurement. Other submission methods WILL NOT be accepted. In the event that it is impossible to submit the proposal via email due to file size limitations, offerors are instructed to request a drop-off from the POC and submit the proposal via DoD SAFE.Section L (instructions to offerors) |
| R15 | For electronic copies, the files shall be in the format that is compatible with and capable of being opened with Microsoft Office Suite 2016 or Adobe Acrobat Reader 2017. The entire content of the proposal shall be in English. If any required document is written in a language other than English (e.g. Japanese), the offeror shall make effort to provide an English translation.Section L (instructions to offerors) |
| R16 | Solicitation (SF 33): The Offeror shall submit one copy of the completed SF33 with blocks 12 through 18 completed as well as all sections (e.g. Section K) with applicable fill-ins.Section L (instructions to offerors) |
| R17 | Solicitation Amendment (SF 30): If applicable, the Offeror shall submit one copy of all acknowledged SF30 by completing and signing block 15.Section L (instructions to offerors) |
| R18 | Price Summary: Offerors shall submit the fully completed price proposal utilizing Attachment (II) 'Proposal Breakdown Form' of Section J. Offerors shall also submit vendor quote's associated with Attachment (II).Section L (instructions to offerors) |
| R19 | Current MSRA or ABR Certification: Offerors who do not possess a current NAVSUP FLCY MSRA/ABR Agreement will be required to submit a copy of an approved/active U.S. Navy MSRA/ABR Agreement as a Prime Contractor as part of the proposal package. This solicitation is intended only for sources duly authorized to operate and do business in Japan, as prescribed by DFARS 252.225-7042. Contractors outside Japan must submit documentation that unambiguously demonstrates the Offeror's compliance with DFARS 252.225-7042 (e.g., proof of incorporation) as part of their proposal.Section L (instructions to offerors) |
| R20 | The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in attachment , Mission Essential Contractor Services, during periods of crisis. The offeror shall- (1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed; (2) Address in the plan, at a minimum- (i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves; (ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site; (iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home; (iv) Any established alert and notification procedures for mobilizing identified 'essential contractor service' personnel; and (v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.Section L (instructions to offerors) |
| R21 | In addition, an Offeror must be registered in the System for Award Management (SAM) at https://www.sam.gov.Section M (evaluation factors) |
| R22 | To be eligible for award, the Offeror shall meet the following criteria: Offer a total evaluated price determined to be fair and reasonable by the Contracting Officer; Obtain a technical acceptability rating of 'Acceptable'; Be determined responsible under FAR 9.104.Section M (evaluation factors) |
| R23 | Any Offeror who do not possess an active MSRA or ABR, or does not agree to execute a master agreement (MSRA/ABR) before award of a job order, will be rated as technically unacceptable and will not be eligible to receive an award.Section M (evaluation factors) |
Recent awards in NAICS 336611
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-05-15 | ROLLS-ROYCE MARINE NORTH AMERICA INC.Department of the Navy · PRODUCTION OF STATORS | $6.61 million |
| 2027-04-19 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · -C410A-MATERIAL SUPPORT-USS STERETT (DDG-104) | $629,825 |
| 2027-03-01 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · -C410A-MATERIAL SUPPORT-USS GREEN BAY (LPD-20) | $75,248 |
| 2027-02-19 | VIGOR MARINE LLCDepartment of the Navy · USS SAVANNAH (LCS 28) FY25 DSRA | $65.83 million |
| 2027-01-08 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · C410A-MATERIAL SUPPORT-USS GREEN BAY (LPD-20) | $32,145 |
| 2026-12-13 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · -C410A-MATERIAL SUPPORT-USS SOMERSET (LPD-25) | $54,343 |
Source: USAspending.gov, retrieved 2026-11-12. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.