USS HIGGINS (DDG 76) SRA 6C1, Bundle #1: requirements and submission rules
42 requirements and 15 submission rules found in the solicitation documents for N6264926RA032. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1.
- Proposal Due Date: All copies of proposals shall be received by the Government no later than the date specified in SF33 block 9 (Front Page) of the Solicitation.
- OFFER: Offerors must provide all information required by this solicitation no later than 13 April 2026 at 10:00 AM Japan Standard Time (JST).
- For classified contracts, if the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Access Request (VAR) via the Defense Information Security System (DISS).
- Except for changes identified in writing and signed by the Contracting Officer, the Contractor shall notify the Administrative Contracting Officer in writing promptly, within calendar days from the date that the Contractor identifies any Government conduct that the _3 N6264926RA032 Page 26 of 51
- (d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
- Any exception to the Government's technical requirements /specifications must be resolved prior to the solicitation closing date.
- In accordance with DFARS Clause 252.246-7006 and DFARS PGI 246-710-70, Offerors will be required to complete and submit Attachment (V) listed in Section J as part of their proposal package and Attachment (VI) shall be completed no later than when the warranted items are presented for receipt and/or acceptance.
- Late proposals WILL NOT be considered.
- (f) The contractor is required to ensure the schedule is submitted to the project team in order to integrate with existing project schedule and mitigate risks due to space/location constraints to avoid work stoppages.
- Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028 "Over and Above Work").
- In these cases, the government employee must submit a Visitor Access Request (VAR) to the main gate or applicable processing entity for your facility and assume responsibility to escort those without CAC Credentials.
- START-UP PERIOD All contractor resource onboarding documents must be submitted via the prime contractor.
- FAR Clause # Title Date Change ____________ Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) () forProcedures https://www.sam.gov entities excluded from receiving federal awards for "covered defense telecommunications equipment or services".
Requirements
| ID | Requirement |
|---|---|
| R1 | Firms who do not possess an active U.S MSRA/ABR as a Prime Contractor are ineligible for award. Non MSRA /ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us.navy.mil. Please note that the MSRA/ABR Certification process may require a year to complete. This solicitation is intended only for sources duly authorized to operate and do business in Japan as prescribed by DFARS 252.225-7042.Section A |
| R2 | Access to the work specification package listed in Section J as Attachment (I) may only be accessed through DoD SAFE... Therefore, any offeror intending to provide a proposal to this solicitation shall request access by sending an email to: shouko.sekido.ln@us.navy.mil, ai.gillard.ln@us.navy.mil by 23 March 2026 10:00 am JST.Section A |
| R3 | The Contractor is required to submit an itemized breakdown of the price for each item on the form provided in Section J. Failure to submit this documentation properly completed by the specified closing date may cause rejection of the offer.Section B |
| R4 | The Contractor, under the direction of the U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repairs and maintenance required to complete the USS ROBERT SMALLS (CG-62) in accordance with the requirements stated in this Section, the Work Item Specifications / Task Group Instructions (TGIs) and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contractSection C (statement of work) |
| R5 | The Contractor shall accomplish all work in accordance with applicable NAVSEA Standard Items (NSIs) and SRF-JRMC Local Standard Items (LSIs). |
| R6 | The contractor is to coordinate the delivery and/or pick-up of all Government Furnished Material (GFM) as cited in work specification(s), supporting drawings, references and/or Statement of Work (SOW). The Contractor is required to manage all GFM upon receipt which includes monitoring, inspecting, segregating, determining nonconformance, and returning unused or nonconforming material o the Government for final disposition.Section C (statement of work) |
| R7 | The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for procurement, receipt, storage and installation of Contractor Furnished Material (CFM). All materials must meet the specified standard military performance specifications, Federal performance standards, and may require to be listed on a Qualified Products List (QPL) for shipboard installations. |
| R8 | The Contractor is required to submit a production schedule encompassing, to the maximum extent possible, all contractor work requirements to the Government at the following milestones: (1) Work Package Execution Review; (2) Start of the Availability; (3) 25% complete conference; (4) 50% complete conference; (5) 75% complete conference; (6) Production Completion Date (PCD); (7) Work Completion; (8) Pre-Sea Trials requirements. |
| R9 | The Contractor, under the direction of SRF-JRMC shall complete the following efforts after contract award in preparation to execute the ship's availability... (a) attend and support the Integrated Project Team Development (IPTD) Work Package Integration Conference (WPIC)... (b) conduct final ship-checks and coordination with assigned Zone Managers (ZMs) and Work Integration Managers (WIMs)... (c) attend and support the IPTD Work Package Execution Review (WPER) and Schedule Model Review (SMR) events... (d) support the early start period of availability... (e) order all long lead time structural materials... (f) ensure the schedule is submitted to the project team... |
| R10 | In accordance with the requirements of NSI 009-01, the Contractor shall identify needed repairs and recommend corrective action during contract performance for work/deficiencies discovered which are not covered by the existing work package. For conditions that impact the critical path(s) /controlling item(s), the Contractor shall notify the Government via electronic media within 24-hours of discovery.Section C (statement of work) |
| R11 | Submit CFRs within five (5) working days via hard copy or approved electronic media to SRF-JRMC after discovery of the condition. At a minimum, the CFR must include the following: (1) Identify contract, ship, and hull number (2) Identification of the applicable Work Item number (3) Date requirement was discovered (4) Description of the work requirement (5) Specific location of the work (6) Recommendation for corrective action (7) Recommendation for the appropriate/best time to accomplish the work... (8) Identification of related changes, if any, to the internal milestones and production and contract completion dates. |
| R12 | The Contractor agrees to price descope DLs at the same labor rate proposed in the original award.Section C (statement of work) |
| R13 | The Contractor shall coordinate the work effort with SRF-JRMC Project Manager on a daily basis to prevent changing situations from causing delays and disruptions.Section C (statement of work) |
| R14 | The contractor is required to comply with specific activity regulations pertaining to crane safety and operation (including allowable access routes and ground loading limitations) and to notify the PRY33 office, in advance, of any cranes entering the activity or of any multipurpose machines, MHE or construction equipment that may be used in a crane-like application to lift suspended loads.Section C (statement of work) |
| R15 | The contractor shall notify the PRY33 office as soon as practical, but not later than four hours, after any WHE accident is identified in NAVFAC P-307 section 12. The contractor is required to secure the accident site and protect evidence until released by the PRY33 office. The contractor shall conduct an investigation to establish the root cause(s) of any WHE accident, near miss or unplanned occurrence.Section C (statement of work) |
| R16 | The contractor shall provide a report for an accident or near miss within 30 days to the BSV&E office and the contracting officer using the appropriate form provided in section 12 consisting of a summary of circumstances, an explanation of causes(s), photographs (if available) and corrective actions taken.Section C (statement of work) |
| R17 | The contractor is required to have a critical lift plan for each of the following lifts: lifts over 75 percent of the capacity of the crane, hoist or other machine... lifts involving more than one crane... lifts of personnel... lifts made in the vicinity of overhead power lines... erection of cranes; lifts of submerged or partially submerged objects... lifts involving binding conditions; lifts of hazardous materials... and lifts involving non-routine rigging or operation sensitive equipment or unusual safety risks.Section C (statement of work) |
| R18 | Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC).Section C (statement of work) |
| R19 | Contractor employees who require routine physical access to a Federally controlled facility or military installation shall complete 'Level I Antiterrorism Awareness Training' prior to gaining access to a facility and annually thereafter in accordance with DoDI O-2000.16 Vol. 1... The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, prior to being granted access to a Federally controlled facility or military installation.Section C (statement of work) |
| R20 | Contractor employees shall comply with all DoD OPSEC requirements and complete 'OPSEC Awareness for Military Members, DoD Employees and Contractor' training within 30 days of onboarding the contract and annual refresher training thereafter... The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after training is completed by all employees and subcontractor personnel.Section C (statement of work) |
| R21 | The contractor shall designate an employee to serve as the Contractor's Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity's Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor's Security Representative.Section C (statement of work) |
| R22 | The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka/Detachment Sasebo, Japan requirements and Commander, Logistics Group Western Pacific (COMLOGWESTPAC) SRU Singapore requirements, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-04.Section E |
| R23 | The performance of all work set forth in SECTION B shall be accomplished aboard the vessel at Commander, Fleet Activities Yokosuka (CFAY) Naval Base.Section F (deliveries) |
| R24 | To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site. |
| R25 | The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation.Section H (special requirements) |
| R26 | The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item.Section H (special requirements) |
| R27 | The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement 'A' (Approved for public release: distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRF-JRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO).Section H (special requirements) |
| R28 | If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.Section H (special requirements) |
| R29 | The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations. During the monitoring, use of flat bladed bucket is required for backhoe operations.Section H (special requirements) |
| R30 | In accordance with paragraph (c) of the clause FAR 52.229-6, 'TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013),' the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations.Section H (special requirements) |
| R31 | The Offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract... The apparently successful offeror agrees to submit, for each item as required prior to award, a Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause.Section I (contract clauses) |
| R32 | The Contractor shall- (1)(i) Have and maintain for the duration of the contract a current CMMC status at the following CMMC level, or higher... for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI... |
| R33 | All questions shall be submitted using Attachment (III) Request for Information (RFI) provided with this solicitation. Questions shall be submitted no later than 5 DEC 2025 10:00 AM Japan Standard Time (JST)Section L (instructions to offerors) |
| R34 | Offerors shall fill in block 12 in front page of Standard Form 33 (SF 33) with 90 days.Section L (instructions to offerors) |
| R35 | Offerors are instructed to submit their proposal electronically via email to the personnel serving as POC for this procurement. Other submission methods WILL NOT be accepted. In the event that it is impossible to submit the proposal via email due to file size limitations, offerors are instructed to request a drop-off from the POC and submit the proposal via DoD SAFE.Section L (instructions to offerors) |
| R36 | For electronic copies, the files shall be in the format that is compatible with and capable of being opened with Microsoft Office Suite 2016 or Adobe Acrobat Reader 2017. The entire content of the proposal shall be in English. If any required document is written in a language other than English (e.g. Japanese), the offerer shall make effort to provide an English translation.Section L (instructions to offerors) |
| R37 | The Offeror shall submit one copy of the completed SF33 with blocks 12 through 18 completed as well as all sections (e.g. Section K) with applicable fill-ins.Section L (instructions to offerors) |
| R38 | Offerors shall submit the fully completed price proposal utilizing Attachment (II) 'Proposal Breakdown Form' of Section J. Offerors shall also submit vendor quote's associated with Attachment (II).Section L (instructions to offerors) |
| R39 | The offeror should provide PPI 'Contract Data Sheet(s)' (utilizing Attachment (VIII)) on no more than three (3) of the offeror's most recently completed contracts with the U.S. Government, Government of Japan (including Japanese Maritime Self-Defense Forces (JMSDF)/other host nation governments if performed in country other than Japan), and/or the general public not to exceed three (3) years since completion for like or similar services to those to be provided under this solicitation. |
| R40 | Offerors who do not possess a current NAVSUP FLCY MSRA/ABR Agreement will be required to submit a copy of an approved/active U.S. Navy MSRA/ABR Agreement as a Prime Contractor as part of the proposal package.Section L (instructions to offerors) |
| R41 | Contractors outside Japan must submit documentation that unambiguously demonstrates the Offeror's compliance with DFARS 252.225-7042 (e.g., proof of incorporation) as part of their proposal.Section L (instructions to offerors) |
| R42 | The apparently successful Offeror agrees to complete and submit the following table before award: TABLE... Identification of Sources of SupplySection L (instructions to offerors) |
Recent awards in NAICS 336611
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-05-15 | ROLLS-ROYCE MARINE NORTH AMERICA INC.Department of the Navy · PRODUCTION OF STATORS | $6.61 million |
| 2027-04-19 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · -C410A-MATERIAL SUPPORT-USS STERETT (DDG-104) | $629,825 |
| 2027-03-01 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · -C410A-MATERIAL SUPPORT-USS GREEN BAY (LPD-20) | $75,248 |
| 2027-02-19 | VIGOR MARINE LLCDepartment of the Navy · USS SAVANNAH (LCS 28) FY25 DSRA | $65.83 million |
| 2027-01-08 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · C410A-MATERIAL SUPPORT-USS GREEN BAY (LPD-20) | $32,145 |
| 2026-12-13 | GHOSTROCK SYSTEMS DEVELOPMENT, LLCDepartment of the Navy · -C410A-MATERIAL SUPPORT-USS SOMERSET (LPD-25) | $54,343 |
Source: USAspending.gov, retrieved 2026-11-16. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.