Equipment Operations, Maintenance, and Repair Services at Joint Base Pearl harbor Hickam, Hawaii (JBPHH).: requirements and submission rules
34 requirements and 15 submission rules found in the solicitation documents for N6247827R2535. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- INQURIES/REQUEST FOR INFORMATION (RFI) Offerors shall email all their inquiries and RFIs for this request for proposal (RFP) to kimberly.d.groce.civ@us.navy.mil and jasmine.a.au.civ@us. navy.mil no later than 9 November 2026.
- Offerors should follow-up with clients /references to help ensure timely submittal of questionnaires by the proposal receipt deadline.
- Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services ADDENDUM TO 52.212-1 PROPOSAL DUE DATE Your proposal is due no later than the date and time specified in this RFP.
- It is an Offeror's responsibility, when transmitting its proposal electronically, to ensure the proposal's timely delivery by transmitting the proposal sufficiently in advance of the time set for receipt of proposals to allow for timely receipt by the Government no later than the date and time stated in this RFP.
- Page limits, if stipulated, must be adhered to.
- 6 If the Offeror delegates this authority to an individual or position, the Offeror must submit a Delegation of Authority letter signed by someone authorized to delegate, along with a corporate statement (e.g., by-laws, corporate resolution) showing that the delegator is authorized to delegate this authority to the person signing the form.
- 4 The Technical Approach to Safety narrative shall not exceed two pages and shall be size 10 font (minimum).
- (e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status.
- https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/PGI204_71.htm#payment_instructions LISTING OF LABOR HOURS At the end of the base and option periods, the Contractor shall submit to the Contracting Officer a listing of labor hours utilized for each class of employee for the base or option period.
- The Offeror shall submit its proposal by the following method: (1) Proposal is to be submitted to the office listed below: Naval Facilities Engineering Systems Command (NAVFAC), Hawaii Attn: Kimberly Groce, Code CON32 Using the Procurement Integrated Enterprise Environment (PIEE) (https://piee.eb.mil/) (2) Only PIEE is authorized for the submission of proposals in response to this solicitation.
- (i) A small business joint venture Offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications--Commercial Products and Commercial Services (check all that apply).
- If the JV does not have such experience, relevant experience shall be separately submitted for each JV member (except for Offerors covered by Mentor-Protege Agreements approved by the Small Business Administration).
- (d) If a project was performed by a JV, and not all members from the prior JV are proposing on this Solicitation, the Offeror shall clearly demonstrate what portion of the work on the submitted project was performed by the JV member offering on this Solicitation.
- If the Offeror does not specifically address what portion of the work under the submitted project was performed by the JV member offering on this Solicitation, the project will not be considered relevant.
- Each Offeror shall address and submit, as a minimum, ALL items required by the paragraphs above.
Requirements
| ID | Requirement |
|---|---|
| R1 | CONTRACTORS MUST BASE AND SUBMIT THEIR OFFERS ON THE NEW SOLICITATION AS WRITTEN. |
| R2 | OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30. |
| R3 | PROVIDE THE BELOW CONTRACTOR INFORMATION: CONTRACTOR NAME: _________________________________________________________________________ IF ENTERING POST OFFICE BOX NUMBER ON YOUR OFFER FORM, PLEASE PROVIDE YOUR: STREET ADDRESS: __________________________________________________________________________ CITY, STATE, ZIP CODE: ___________________________________________________________________ FACSIMILE NUMBER WITH AREA CODE: _________________________________________________________ EMAIL ADDRESS: ___________________________________________________________________________ UNIQUE ENTITY ID: ________________________________________________________________________ CAGE CODE: _______________________________________________________________________________ GENERAL EXCISE LICENSE NUMBER: ___________________________________________________________ |
| R4 | Offerors shall enter unit prices and amounts for contract line items (CLINs) and exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits. |
| R5 | Complete and submit these attachments with the offer. (a) Attachment 0200000-14, Exhibit A (Base Period). (b) Attachment 0200000-15, Exhibit B (Option Period One). (c) Attachment 0200000-16, Exhibit C (Option Period Two). (d) Attachment 0200000-17, Exhibit D (Option Period Three). (e) Attachment 0200000-18, Exhibit E (Option Period Four). (f) Attachment 0200000-19, Exhibit F (Option to Extend Services). |
| R6 | The Offeror will not be eligible for award of a contract, task order, or delivery order resulting from this solicitation if the Offeror does not have, for each of the contractor information systems that will process, store, or transmit FCI or CUI and that will be used in performance of a contract resulting from this solicitation- (i)The current CMMC status entered in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) at the CMMC level required by paragraph (b)(1) of this provision [CMMC Level 1]; and (ii)A current affirmation of continuous compliance with the security requirements identified at 32 CFR part 170 in SPRS. |
| R7 | If the Offeror has a CMMC Status of Conditional, the Offeror shall successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final. |
| R8 | The Offeror shall provide, in the proposal, the CMMC unique identifier(s) (CMMC UIDs) issued by SPRS for each contractor information system that will process, store, or transmit FCI or CUI during performance of a contract, task order, or delivery order resulting from this solicitation. |
| R9 | If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it 'does' provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation: The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation. |
| R10 | If the Offeror has represented in paragraph (d) of this provision that it 'will provide covered defense telecommunications equipment or services,' the Offeror shall provide the following information as part of the offer: (1) A description of all covered defense telecommunications equipment and services offered... (2) An explanation of the proposed use of covered defense telecommunications equipment and services... (3) For services, the entity providing the covered defense telecommunications services... (4) For equipment, the entity that produced or provided the covered defense telecommunications equipment... |
| R11 | Only PIEE is authorized for the submission of proposals in response to this solicitation. Instructions for use of PIEE are provided below: (a) Register at PIEE using the PIEE Vendor Registration Guide... (b) Follow attached 'Proposal Manager', 'Proposal Manager Functions' and 'Posting Offer' Guides. |
| R12 | The Offeror agrees to hold the prices in its proposal firm for 90 calendar days from the date specified for receipt of proposals. |
| R13 | The complete price and non-price proposals shall be submitted as two separate folders, entitled 'Price Proposal' and 'Non-price Proposal.' The non-price proposal shall not contain any cost/pricing information. |
| R14 | Acknowledgment of all amendments issued for this RFP; |
| R15 | Attachments 0200000-14 through 0200000-19, using the 'Offeror Pricing Schedules' Microsoft Office Excel (excel) file. Do not convert the excel file to an Adobe Acrobat file. Do not use any other form or alter the excel file document. Submit as an excel file, completing the excel file as follows: 1 Complete only the last columns on the excel file entitled, 'OFFEROR PROPOSED UNIT PRICE.' Limit unit prices to two decimal places... 2 Price Schedule tab. The Amounts for each Contract Line Item No. will be filled in automatically from Attachments 0200000-14 through 0200000-19. 3 Do not rename the excel file except to add your company name to the end of the file name. |
| R16 | A completed copy of FAR 52.212-3, Offeror Representations and Certifications--Commercial Products and Commercial Services, and the 'CONTRACTOR INFORMATION' section from the Addendum to 52.212-3. Also complete the annual representations and certifications electronically via the SAM.gov website at https://sam.gov. Ensure you also complete the DFARS provisions; |
| R17 | In accordance with the National Institute of Standards and Technology Special Publication 800-171, you are required to have a current BASIC summary level score posted into DoD's Supplier Performance Risk System (SPRS) website, to be eligible for award. See DFARS 252.204-7019, 252.204-7012 and 252.204-7020. Provide acknowledgement of this requirement; |
| R18 | Evidence that the Department of Labor has received and processed the Offeror's current VETS-4212 Report, entitled 'Federal Contractor Veterans' Employment Report (VETS-4212 Report),' as required by FAR 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans. Provide a copy of the email confirmation of receipt notification. (If not applicable, provide statement that Offeror has not had contracts subject to this requirement.); |
| R19 | CAGE/SAM UEID numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate); |
| R20 | Joint Venture Agreement (if submitting proposal as a joint venture). |
| R21 | Most current balance sheet for a full year, which provides evidence of working capital sufficient to cover two months of the Recurring Work amount for Contract Line Item No. 0001. Lines of credit may also be submitted. Balance sheets for subcontractors will not be considered. |
| R22 | Confirmation that firm will comply with the subcontracting limitations under FAR 52.219-14, Limitations on Subcontracting (Deviation), if awarded the contract. |
| R23 | In accordance with the Cybersecurity Maturity Model Certification (CMMC) Program, for this procurement you are required to have a CMMC status of Level 1 posted into DoD's SPRS website. See DFARS 252.204-7025 and 252.204-7021. Provide acknowledgement of this requirement; |
| R24 | The Offeror shall provide a minimum of one and maximum of five relevant projects to be documented only on Attachment L-1, 'Corporate Experience Project Data Sheet'. The Offeror shall clearly demonstrate relevant experience as a prime contractor and/or subcontractor on project similar in size, scope, and complexity to the requirements described in the Performance Work Statement (PWS) of the solicitation. |
| R25 | An Offeror may rely on the experience of corporate affiliates (e.g., subsidiaries, sister companies, predecessor companies, and parent companies) and subcontractors that will perform major or critical aspects of the requirement to demonstrate experience, provided that the corporate affiliates and subcontractors performed the submitted projects as the prime contractor, and the Offeror submits the following: 1 A one-page narrative clearly demonstrating that the corporate affiliates/subcontractors will have meaningful participation in the project by identifying the personnel or resources from the corporate affiliates/subcontractors that will be dedicated to the project; 2 An organization chart that demonstrates the corporate relationship of the affiliates/subcontractors; and, 3 Signed teaming agreement between the corporate affiliate or subcontractor and the Offeror, or signed Letter of commitment to the Offeror, from the corporate affiliate or subcontractor. |
| R26 | For each project, the Offeror shall complete Attachment L-1, 'Corporate Experience Project Data Sheet'. All information shall be provided as requested on the form. Attachment L-1 is limited to the two pages provided with the solicitation. |
| R27 | If the evaluation of your Corporate Experience Project Data Sheet does not result in an Acceptable rating for Corporate Experience, the Government will consider the experience of your Project Manager and Quality Manager. The Offeror must: 1 Submit Attachment L-2, 'Key Personnel Experience List.' For a maximum of five projects that meet the relevant requirements in paragraph c.(1)(b) 1 through 3 above; 2 The Project Manager and Quality Manager shall each have at least three years of relevant management experience that demonstrates their ability to lead, organize, and manage projects that meet the relevant requirements in paragraph c.(1)(b)1 through 3 above. 3 You must submit the 'Key Personnel Experience List' for both the Project Manager and Quality Manager. If you submit the list for only one position, the list for that position will not be considered; and, 4 The Offeror must provide a signed letter of commitment from the Project Manager and Quality Manager. |
| R28 | Provide the following for your firm: 1 Evidence of a current National Air Duct Cleaners Association (NADCA) certification for at least one individual in the firm (prime/subcontractor) that will perform or supervise the work at the cleaning site(s). |
| R29 | The Offeror shall submit the following information using Attachment L-3, 'Safety Data & Narrative': The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five Calendar Years (CY), as well as a safety narrative, as described below. For a partnership, joint venture or mentor-protege, the Offeror shall submit separate DART and TCR rates for the specified five CY for each entity that is part of the partnership/joint venture/mentor-protege; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions. NOTE: DART and TCR shall not be submitted for subcontractors. |
| R30 | DART Rate: Submit five previous complete calendar years' [CY2020, CY2021, CY2022, CY2023, and CY2024] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Any extenuating circumstances that affected the DART rate data should be addressed as part of this element. DART rates above 2.99, in any of the previous five years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate. |
| R31 | TCR: Submit five previous complete calendar years' [CY2020, CY2021, CY2022, CY2023, and CY2024] worth of data (not an overall average). If the Offeror has no TCR for any year, affirmatively state so and explain why. Any extenuating circumstances that affected the TCR data should be addressed as part of this element. TCRs above 4.49, in any of the previous five years, will be considered UNACCEPTABLE, unless an adequate explanation is provided to address the extenuating circumstances that affected the rate. |
| R32 | Offerors shall submit a performance evaluation for all projects submitted under Factor 1. If a completed Contractor Performance Assessment Report System (CPARS) evaluation is available, it shall be submitted with the offer for each relevant project included in Factor 1 - Corporate Experience. If a completed CPAR evaluation is not available for a relevant project that was submitted under Factor 1, the Offeror shall submit NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) (Attachment L-4) for that project. |
| R33 | Offers are solicited on an 'all or none' basis. Failure to submit offers for all line items listed may be cause for rejection of the offer. |
| R34 | [The Offeror shall check the block and fill in the blank for one of the following paragraphs, based on the estimated value and the country of origin of photovoltaic devices to be utilized in performance of the contract:] |
Recent awards in NAICS 811310
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2027-03-31 | STANLEY ELEVATOR COMPANY, INC.Department of the Army · THE ENGINEERING RESEARCH AND DEVELOPMENT CENTER, CRREL, IN HANOVER, NH REQUIRES A NEW ELEVATOR MAINTENANCE CONTRACT. | $49,120 |
| 2026-11-01 | TRIMECH SOLUTIONS, LLCDepartment of the Navy · STRATASYS EC HWM, POP: 11/01/2026-10/31/2027 | $4,625 |
| 2026-09-30 | PHILLIPS CORPORATIONDepartment of the Air Force · HAAS MACHINE MAINTENANCE AND CALIBRATION SERVICES | $64,605 |
| 2026-09-30 | WISAG TECHNICAL MILITARY SUPPORT SERVICES GMBH & CO. KGDepartment of the Army · FACILITIES MAINTENANCE AND REPAIR, SERVICE, BREMERHAVEN, DE ADDRESS OF PERFORMANCE:WESERPORT STRASSE 5 BREMERHAVEN 27580, GERMANYPERIOD OF PERFORMANCE: 30 SEPTEMBER 2026 TO 29 MARCH 2027 | $64,098 |
| 2026-09-29 | AMERICAN INSPECTION & TEST INCDepartment of the Army · PLEASE SEE PERFORMANCE WORK STATEMENT (PWS) FOR FULL REQUIREMENT DETAILS. | $17,360 |
| 2026-09-26 | BATTISTELLA S.P.A.Department of the Army · SEMI-ANNUAL MAINTENANCE AND CERTIFICATION OF THE EDERLE JUMP TOWER, ITALY. INCLUDES STEEL CABLE, TROLLEY, CONCRETE AND RAPPEL WALL UPKEEP, COATINGS, TRIENNIAL MAGNETO-SCOPE TESTING, AND JUMP MASTER-TE | $80,082 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.