TenderAxiom

TenderAxiom · Opportunities

Connect Maglocks to Fire System, B6040: requirements and submission rules

36 requirements and 3 submission rules found in the solicitation documents for N400857371394. Use them as the start of your compliance matrix.

Solicitation number
N400857371394
Agency
DEPT OF DEFENSE / DEPT OF THE NAVY / NAVFAC / NAVFAC ATLANTIC CMD / NAVFAC MID-ATLANTIC / NAVFACSYSCOM MID-ATLANTIC
NAICS
236220
Set-aside
Small Business Set Aside - Total
Responses due
18 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Failure to submit a required bid bond by the proposal deadline will result in the proposal being removed from consideration.
  • The cut off for PPIs is 09 November 2026 by 1400 local time in order to process all inquiries by the proposal due date.
  • PPIs: PPIs must be submitted by the prime contractor to the email addresses listed above using the Master PPI Form provided with the solicitation.

Requirements

IDRequirement
R1ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A PROPOSAL FOR THIS PROJECT: N4008525D2516 T.E. Davis Construction Company; N4008525D2517 Joyce & Associates Construction, Inc.; N4008525D2518 Olympic Enterprises, Inc.; N4008525D2519 Quadrant Construction
R2All work shall be completed within 90 calendar days after award
R31 person Superintendent/QC/SSHO, Secret level clearance is required
R4Proposal Acceptance Period: 90 calendar days from receipt of offers
R5Proposals exceeding $35,000, but not exceeding $150,000, will require a payment bond only. Submission instructions will be provided with award notification.
R6Proposals exceeding $150,000.00 will also require a payment bond and performance bond. Submission instructions will be provided with award notification.
R7The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
R8If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
R9If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material.
R10The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer.
R11Proposals must be sent to ALL of the above email addresses. The subject line should contain the solicitation number and contractor name.
R12Therefore, each initial offer should contain the offeror’s best terms from a price standpoint.
R13If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
R14If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026.
R15PROVIDE AUDIBLE NOTIFICATION APPLIANCES AS INDICATED TO ACCOMPLISH THE FOLLOWING DESIGN CRITERIA WITH ALL DOORS, FIRE SHUTTERS, AND WINDOWS CLOSED. WHERE THIS DESIGN CRITERIA IS NOT ACCOMPLISHED DURING ACCEPTANCE TESTING, PROVIDE ADDITIONAL DEVICES TO MEET THE MINIMUM DESIGN CRITERIA WITHOUT EXCEEDING THE LIMITATIONS OF THE FACU/ACU, NAC, OR AMP (INCLUSIVE OF PRESCRIBED SAFETY FACTORS).
R16PROVIDE A QUANTITY OF SPEAKERS IN EACH ROOM/AREA TO ACHIEVE THE REQUIRED SOUND POWER AND INTELLIGIBILITY OUTLINED IN THESE CONTRACT DOCUMENTS. DEPENDING ON THE QUALITY OF SPEAKER USED, SEVERAL SPEAKERS TAPPED AT A LOWER SETTING MAY BE REQUIRED TO ACHIEVE THE PRESCRIPTIVE CIS SCORE. THE QUANTITY OF SPEAKERS REQURIED MAY DIFFER FROM THE QUANTITY SHOWN ON THE PLANS DEPENDING ON SPEAKER QUALITY AND/OR WATTAGE TAPS. PROVIDE QUANTITY OF SPEAKERS NECESSARY TO COMPLY WITH THE AUDIBLE DESIGN CRITERIA.
R17PROVIDE A MINIMUM SOUND POWER OF 70 DBA AND 15 DBA OVER THE AVERAGE AMBIENT SOUND LEVEL OR 5 DBA ABOVE THE MAXIMUM SOUND LEVEL HAVING A DURATION OF AT LEAST 60 SECONDS, WHICHEVER IS GREATER, AT THE MOST REMOTE LOCATION WITHIN THE ROOM/AREA MEASURED AT 5 FT AFF.
R18PROVIDE EXTERIOR SPEAKERS MEETING A MINIMUM SOUND POWER OF 70 DBA AND 15 DBA OVER THE AVERAGE AMBIENT SOUND LEVEL, WITHIN THE AREA INDICATED MEASURED AT 5 FT ABOVE GRADE.
R19MEET THE FOLLOWING INTELLIGIBILITY CRITERIA: A. ACHIEVE A CIS SCORE OF 0.70 IN EACH ROOM MEASURED AT 5 FT AFF.
R20ADDITIONAL APPLIANCES BASED ON THE CONTRACTOR'S DESIGN MUST BE PROVIDED AT NO ADDITIONAL COST TO THE GOVERNMENT.
R21SPACE STROBES IN ACCORDANCE WITH THE CRITERIA OUTLINED IN NFPA 72, UNLESS OTHERWISE NOTED.
R22PROVIDE AN ADDRESSABLE COMBINED FIRE ALARM/MASS NOTIFICATION SYSTEM AS INDICATED ON THE DRAWINGS. PROVIDE REMOTE FIRE ALARM/MASS NOTIFICATION UNITS FOR EACH SECURE SPACE AND INTERCONNECT ALL UNITS THROUGH FIBER.
R23COORDINATE ALL REQUIRED SYSTEMS TO THE SATISFACTION OF THE ENGINEER AND AUTHORITY HAVING JURISDICTION. ANY DEFICIENCIES, INCONSISTENCIES, OR POORLY COORDINATED INSTALLATIONS MUST BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST.
R24DETERMINE THE FINAL QUANTITY AND LOCATION OF ALL DEVICES IN ACCORDANCE WITH THE SPECIFICATIONS, CONTRACT DRAWINGS, AND MANUFACTURER'S WRITTEN RECOMMENDATIONS TO BE COMPLIANT WITH ALL APPLICABLE CODES AND STANDARDS. PROVIDE ADDITIONAL DEVICES WHEN REQUIRED FOR A FULLY FUNCTIONING FIRE ALARM SYSTEM AS REQUIRED BY NFPA 72, UFC 3-600-01, AND UFC 4-021-01.
R25CONCEAL ALL CONDUITS IN WALLS OR ABOVE CEILINGS UNLESS OTHERWISE INDICATED. EXCEPTION: CONDUIT IS ALLOWED TO BE SURFACE MOUNTED ON WALLS AND CEILINGS IN UNFINISHED AREAS (SUCH AS MECHANICAL ROOM, ELECTRICAL ROOM, FIRE PROTECTION ROOM). WHERE A CONDUIT SUPPLIES A DEVICE NOT MOUNTED DIRECTLY ON THE WALL OR CEILING, ROUTE THE CONDUIT AS A SINGLE PENDENT DROP TO EACH DEVICE FROM THE CEILING SURFACE ABOVE. DO NOT TRAPEZE CONDUIT ACROSS AN OPEN SPACE.
R26ALL FIRE ALARM JUNCTION BOXES, COVERS AND CONDUITS IN UNFINISHED AREAS ARE TO BE PROVIDED PRE-FINISHED RED FROM THE FACTORY. PAINT EXPOSED CONDUIT AND JUNCTION BOXES IN FINISHED AREAS TO MATCH ADJACENT SPACES WITH JUNCTION BOXES INSIDE COVER LABELED, "FIRE ALARM", AND WHERE CONDUIT PENETRATES A WALL, PAINT RED 3/4 INCH BANDS EVERY 20 FT AND BOTH SIDE OF PENETRATIONS PER UFC 3-600-01.
R27PROVIDE CONDUIT IN ACCORDANCE WITH THE REQUIREMENTS OF THE ELECTRICAL SPECIFICATIONS, UNLESS OTHERWISE NOTED. SUPPORT CONDUIT IN ACCORDANCE WITH THE NEC SUCH AS MAXIMUM 10 FT SUPPORT INTERVALS AND 3 FT FROM A TERMINATION. TENSION ONLY HANGERS ARE NOT PERMITTED SUCH AS BATWINGS. FLEXIBLE CONDUIT IS ONLY PERMITTED WHEN CONNECTING TO THE FOLLOWING DEVICES AND APPLIANCES: DEVICES LOCATED ON FIRE SUPPRESSION EQUIPMENT SUCH AS FLOW SWITCHES, AND TAMPER SWITCHES, DEVICES AND APPLIANCES LOCATED IN REMOVABLE CEILING TILES, OR WHERE SPECIFICALLY NOTED.
R28PROVIDE CONDUCTOR SIZING NOT LESS THAN 18 AWG FOR SLC. PROVIDE CONDUCTOR SIZING NOT LESS THAN 16 AWG FOR NAC, SPEAKER CIRCUITS, AND IDC, PER UFC 3-600-01. CONSISTENTLY COLOR COORDINATE ALL CONDUCTORS THROUGH THE SYSTEM IN RELATION TO DEVICES THEY FEED SUCH AS SLC - BLACK/RED, STROBE - YELLOW/BLUE. PROVIDE ADDESSABLE SLC CIRCUITS WITH SHIELDED CONDUCTORS, WHERE THE SHIELDING IS GROUNDED AT ONE END WHERE REQUIRED BY THE MANUFACTURER. PROVIDE ALL CIRCUITS WITH LABELING AT THE POINT OF TERMINATION SUCH AS SLC 1, NAC 8, IDC 4.
R29RUN CONDUCTORS FROM DEVICE TO DEVICE WITHOUT SPLICES. WIRE NUTS ARE PROHIBITED. UTILIZE TERMINAL STRIPS WHERE CONDUCTORS CANNOT BE DIRECTLY TERMINATED AT THE DEVICE SUCH AS PIGTAILS OFF A HEAT DETECTOR.
R30DO NOT USE FIRE ALARM EQUIPMENT PANELS AS RACEWAY FOR ROUTING POWER WIRING OR LOW VOLTAGE WIRING. ONLY ROUTE WIRING TERMINATING WITHIN THE PANEL INTO THE PANEL. PROVIDE 1/4 INCH SEPARATION BETWEEN POWER-LIMITED FIRE ALARM CIRCUITS AND POWER CIRCUITS.
R31MOUNTING DEVICES IN THE FACU/ACU, INCLUDING ANY SUBPANELS SUCH AS AMP, NAC, AND FAC, WHICH ARE NOT UL LISTED OR FM APPROVED AS PART OF THE UNIT IS PROHIBITED.
R32PROVIDE SURGE SUPPRESSORS TO PROTECT ALL POWER SUPPLY CIRCUITS TO THE FACU/ACU, INCLUDING ANY SUBPANELS SUCH AS AMP, NAC, FAC, AND ALL FIRE ALARM CIRCUITS LEAVING OR ENTERING THE BUILDING. DEVICES AND APPLIANCES MOUNTED DIRECTLY ON THE EXTERIOR OF THE BUILDING SUCH AS WALL MOUNTED EXTERIOR SPEAKERS DO NOT REQUIRE SUPPRESSORS. MOUNT SURGE SUPPRESSORS IN A SEPARATE ENCLOSURE, UNLESS IT IS UL LISTED OR FM APPROVED AND INSTALLED IN THE CONTROL UNIT BY THE FACTORY.
R33INSTALL FIRE ALARM BATTERIES IN THE ENCLOSURE OF THE DEVICE/UNIT IT SUPPORTS SUCH AS FACU/ACU ENCLOSURE OR IN AN INDEPENDENT DEDICATED ENCLOSURE.
R34PROVIDE GAIN CONTROL ON ALL MICROPHONES.
R35CONTRACTOR MUST PROVIDE THE QUANTITY OF DEVICES AS REQUIRED TO COMPLY WITH NFPA 72, UFC 3-600-01, UFC 4-021-01, AND CONTRACT DOCUMENTS.
R36EACH FLOW AND TAMPER SWITCH MUST REPORT BACK TO THE FIRE ALARM CONTROL UNIT WITH A SEPARATE ADDRESS. GROUPED SWITCHES ON ONE ADDRESS ARE NOT ACCEPTABLE.

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2031-02-11FEDVET CONSTRUCTIONDepartment of the Army · MIN GUARANTEE$2,500
2030-09-28STRUCTSURE PROJECTS INCDepartment of the Navy · MEDICAL MACC-MINIMUM GUARANTEE$0
2027-11-02CCI PRIME CONTRACTORS, LLCDepartment of the Air Force · FY25 MSG CES HANGAR H285 REPAIR MAINTENANCE DOCK$27.62 million
2027-07-31DOYON TECHNICAL SERVICES, LLCDepartment of the Army · PJ00082-25 - PROVIDE AND INSTALL ALL MATERIAL AND LABOR NECESSARY TO DEMO FAILED CMP, AND RE-INSTALL RCP. PJ00018-26 - DESIGN, DEMOLISH, INSTALL, AND COMMISSION A COMPLETE AND OPERATIONAL NEW DRY PIPE$486,999
2027-07-17CONTI FEDERAL SERVICES, LLCDepartment of the Army · B-21 60 ROW SOUTH ENVIRONMENTAL PROTECTION SHELTERS (EPS) AT ELLSWORTH AIR FORCE BASE (AFB), SOUTH DAKOTA (SD)$43.99 million
2027-04-28MIRADOR ENTERPRISES, INC.Department of the Air Force · THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DESIGN INSTALL EMERGENCY WASH STATIONS, HOLLOMAN AFB, NEW MEXICO.$79,056

Source: USAspending.gov, retrieved 2026-10-25. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.