Repair Auto Maintenance Facility Bldg 575 (230040): requirements and submission rules
16 requirements and 4 submission rules found in the solicitation documents for N4008527R9000. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration.
- Proposal Due Date: 11/23/2026 2:00 PM EST
- 23-0040 10/22/2026 E-Mail Address for Proposals: anna.m.lundquist.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil Requests for Information (RFIs): RFIs must be submitted by the prime contractor to anna.m.lundquist.civ@us.navy.mil.
- The specifications and drawings are posted as attachments on https://www.sam.gov/. “OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE.
Requirements
| ID | Requirement |
|---|---|
| R1 | ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A PROPOSAL FOR THIS PROJECT: N40085-25-D-2991 Quadrant Construction, N40085-25-D-2992 Blue Rock Structures, N40085-25-D-2993 Bristol General Contractors, N40085-25-D-2994 Joyce & Associates Construction, Inc., N40085-25-D-2995 Military & Federal Construction Co., N40085-25-D-2996 P&S Construction, N40085-25-D-2997 Syncon, LLC |
| R2 | the Quality Control Manager must be a stand-alone position. |
| R3 | Use the attached pricing sheet with your proposal. |
| R4 | Special Scheduling: Building tenant (2DLAR) has portable trainer pods on site that must remain accessible and operational at all times. |
| R5 | Proposal Acceptance Period: 90 days from receipt of offers |
| R6 | Proposals valued at $35K and greater will require a payment bond only. |
| R7 | Proposals valued at $150K and greater w ill require a bid bond, a payment bond, and a performance bond. |
| R8 | If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. |
| R9 | If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. |
| R10 | The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer. |
| R11 | If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies. |
| R12 | If the Government determines that a particular exception requested in accordance with paragraph (c) of FARclause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. |
| R13 | Provide this information for each Real Property Facility listed on the DD Form 1354 in a format that allows easy data entry into the real property system. |
| R14 | Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number (ELIN) given hereinafter: ELIN 0001 and 0002 will be awarded at the time of award. |
| R15 | Offers must be submitted on all line ite ms. Failure to propose on all line items may result in the offer being rejected as non-responsive. |
| R16 | ELINs shall include all markups (overhead, labor burden, and profit). |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2031-02-11 | FEDVET CONSTRUCTIONDepartment of the Army · MIN GUARANTEE | $2,500 |
| 2030-09-28 | STRUCTSURE PROJECTS INCDepartment of the Navy · MEDICAL MACC-MINIMUM GUARANTEE | $0 |
| 2027-11-02 | CCI PRIME CONTRACTORS, LLCDepartment of the Air Force · FY25 MSG CES HANGAR H285 REPAIR MAINTENANCE DOCK | $27.62 million |
| 2027-07-31 | DOYON TECHNICAL SERVICES, LLCDepartment of the Army · PJ00082-25 - PROVIDE AND INSTALL ALL MATERIAL AND LABOR NECESSARY TO DEMO FAILED CMP, AND RE-INSTALL RCP. PJ00018-26 - DESIGN, DEMOLISH, INSTALL, AND COMMISSION A COMPLETE AND OPERATIONAL NEW DRY PIPE | $486,999 |
| 2027-07-17 | CONTI FEDERAL SERVICES, LLCDepartment of the Army · B-21 60 ROW SOUTH ENVIRONMENTAL PROTECTION SHELTERS (EPS) AT ELLSWORTH AIR FORCE BASE (AFB), SOUTH DAKOTA (SD) | $43.99 million |
| 2027-04-28 | MIRADOR ENTERPRISES, INC.Department of the Air Force · THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DESIGN INSTALL EMERGENCY WASH STATIONS, HOLLOMAN AFB, NEW MEXICO. | $79,056 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.