Pest Control Support Services at Naval Weapons Station Earle: requirements and submission rules

99 requirements and 1 submission rules found in the solicitation documents for N4008527R0009. Use them as the start of your compliance matrix.

Solicitation number
N4008527R0009
Agency
DEPT OF DEFENSE / DEPT OF THE NAVY / NAVFAC / NAVFAC ATLANTIC CMD / NAVFAC MID-ATLANTIC / NAVFACSYSCOM MID-ATLANTIC
NAICS
561710
Set-aside
Small Business Set Aside - Total
Responses due
24 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Any proposed changes in pesticide usage shall be submitted per Section F to the KO for approval at least five business days in advance of the anticipated use.

Requirements

IDRequirement
R1The prime Contractor shall insure that subcontractors comply with the provision of this contract.Section J
R2Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices.Section J
R3Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job.Section J
R4The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.Section J
R5All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the construction equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.Section J
R6Direct material costs shall include sales tax and transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor.Section J
R7All other cost such as sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment, mobilization, demobilization, time for job preparation, safety standby personnel, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material price since the cost for these items are included in the UPL Hour unit price bid.Section J
R8A Hazardous Waste Management Plan shall: Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste. Identify training requirements and describe procedures for obtaining training and maintaining training records. Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation. Describe all hazardous waste generation and management procedures. Include or reference the hazardous waste minimization plan and goals. Include or reference contingency plans and emergency response procedures. The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals.Section J
R9A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste.Section J
R10The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests.Section J
R11Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.Section J
R12The Contractor shall use the latest edition [of R. S. Means].
R13With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price.Section J
R14The Contractor shall provide all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items required to perform pest control services at Naval Weapons Station Earle, Colts Neck and Leonardo, New Jersey 07722.Section J
R15Pesticides, when needed, shall be selected consistent with IPM principles in order to minimize negative impacts on human health and the environment.Section J
R16The Contractor shall perform pest control services in conformance with the Integrated Pest Management Plan (IPMP) to prevent and control the following pests: --Unwanted vegetation and invasive plants --Nuisance, structure damaging, lawn, turf and ornamental, and public health pests: cockroaches, termites, bees, wasps, ants, fleas, silverfish, stored product pests, mosquitoes, bedbugs --Vertebrate pests: mice, rats, bats, feral dogs and cats, other nuisance mammals, pigeons and other nuisance birdsSection J
R17The pest control specification used in a solicitation for contract must be approved by the NAVFAC Pest Management Consultant (PMC) prior to issuing a Request for Proposal (RFP).Section J
R18The Contractor shall provide personnel with qualifications, technical knowledge, experience and skills required for efficient operations within the pest control function.Section J
R19All Contractor personnel who apply pesticides shall be certified by the State of New Jersey in the categories required to perform the work specified in this contract. No contractor personnel may work under the supervision of a certified person even where this is permitted practice in those States or host nations in which the DoD property is located.Section J
R20All work performed shall be in accordance with Federal, DoD, state, local, and installation policies and regulations.Section J
R21The Contractor shall possess a business license issued by the State of New Jersey to provide pest control services.Section J
R22Proof of local/state licensing shall be provided per Section F.Section J
R23The Contractor shall obtain all necessary permits required to perform the work in this contract. Permits include Fish and Wildlife Bird Depredation Permit, State of New Jersey Nuisance Wildlife Control permits. Permits to take fur bearing animals, or other permits required by Federal, state, or local regulations.Section J
R24A copy of any applicable permit shall be provided per Section F.Section J
R25Vehicles used to transport pesticides shall be equipped with a fire extinguisher, a spill containment kit capable of containing any potential pesticide spill, an emergency eye wash station, at least two gallons of emergency wash water for personal decontamination, and a first aid kit.Section J
R26All pesticides carried on vehicles shall be stored in a locked compartment separate from the cab of the vehicle.Section J
R27Vehicles shall not be left unattended at any time unless properly locked and secured.Section J
R28Pest control vehicles shall be marked with the owner's or Contractor's name clearly identified as a pest control vehicle per state regulations.Section J
R29Each vehicle shall display applicable state or federal department of transportation or agency placard and other identification markings as required by Federal, state, or local regulations.Section J
R30All vehicles shall be maintained with a clean and orderly appearance, free from pesticide residues or grime buildup.Section J
R31Vehicles shall not be cleaned, washed, or rinsed on Government property.Section J
R32The Contractor shall provide repair and maintenance as necessary to keep all equipment in good operating condition, and take appropriate action regarding the following: All tanks, hoses, pumps, control valves, and gauges shall be free of visible deterioration, shall not leak, and shall operate at the manufacturer's recommended rates and pressures.Section J
R33Equipment that has failed shall be replaced or repaired by the Contractor prior to resuming operations.Section J
R34Screens, strainers, and filters shall be used and maintained per the pump, sprayer, and nozzle manufacturer's instructions.Section J
R35Spray nozzles shall deliver spray patterns as specified by the nozzle manufacturer.Section J
R36Nozzles that become clogged or eroded shall be repaired or replaced by the Contractor prior to resuming operations.Section J
R37Ultra-Low Volume (ULV) equipment shall be calibrated to assure proper flow rate and droplet size of pesticide as required by the label.Section J
R38ULV equipment shall be calibrated, including droplet size analysis, 15 days prior to start of work and thereafter every 50 hours of use (or per manufacturer's recommendations), or when the machine is repaired.Section J
R39Calibration and droplet analysis reports, when required, shall be maintained on file and submitted per Section F.Section J
R40All pesticide dispersal equipment, including bait stations and trays, shall be clearly and plainly marked with "DANGER"..."PESTICIDES", or as required by applicable regulations.Section J
R41All pesticides must be used in accordance with Federal, State of New Jersey, local laws, and installation regulations, and any requirements identified in Section J attachments.Section J
R42All pesticides shall be procured, processed, handled, and applied in strict accordance with the manufacturer's label.Section J
R43All pesticides shall be registered with the EPA and the (Insert state name(s)) pesticide regulatory agency.Section J
R44The Contractor shall maintain a book of labels and Safety Data Sheets (SDSs) for pesticides they use or intend to use, and have it readily available for the KO's inspection at all times.Section J
R45All pesticides used by the Contractor in the US shall be registered with the EPA and applicable state lead agency for the use intended.Section J
R46Planned Pesticide Use Sheets, provided in J-1503020-02, including labels and SDS for each pesticide intended for use, shall be submitted per Section F with the Contractor’s Work Plan.Section J
R47The New Pesticide Request and Planned Pesticide Use Sheet shall be included as part of the Contractor’s Work Plan (CWP).Section J
R48One New Pesticide Request and Planned Pesticide Use Sheet shall be filled out for each pest that will be controlled with a pesticide. If more than one pesticide is used to control the pest, one New Pesticide Request and Planned Pesticide Use Sheet shall be filled out for each of the pesticides used per pest.Section J
R49A New Pesticide Request and Planned Pesticide Use Sheet shall be filled out whenever pesticides used to control a pest are changed.Section J
R50Completed New Pesticide Request and Planned Pesticide Use Sheet shall be attach to the CWP.Section J
R51The New Pesticide Request and Planned Pesticide Use Sheet shall be filled out on-line. The regional NAVFAC Applied Biology Center must be contacted to obtain a link to the website, password, and instructions to use the system.Section J
R52All pesticides, rinse water, and containers shall be disposed of per pesticide label directions.Section J
R53The Contractor shall dispose of any pesticides, pesticide containers, pesticide residue, pesticide rinse water, or any pesticide contaminated articles at an authorized disposal area off-site from the installation.Section J
R54All spills, no matter how small or insignificant shall be reported to the Station 911 Emergency Call Center at 732-866-2991 for response by Station HAZMAT Team at 732-866-2088 or Fire Department at 732-866-2260.Section J
R55The Contractor shall not mix pesticides on Government property unless specifically authorized by the KO.Section J
R56If mixing is authorized, it shall be done at an approved Government furnished facility or over an approved containment device. All water sources shall be equipped with proper back-flow prevention devices. An air gap shall be maintained between the water source and the pesticide tankSection J
R57The Contractor shall not store pesticides on Government property unless specifically authorized by the KO. If storage is authorized, it shall be done at an approved Government furnished facility, if available. If a Government furnished facility is not available, the contractor shall furnish an approved storage facility.Section J
R58Liquid or aerosol pesticides shall not be applied in occupied spaces when people are present. Dust pesticide formulations shall not be applied in occupied spaces if the dust can be carried by air currents to people.Section J
R59The Contractor shall provide PPE to each of their pest control applicators. This equipment shall include, at a minimum, the PPE required by the pesticide label and SDS.Section J
R60Warranties are only required for termite treatments. See J-1503020-13 (Termite Control Specifications) for warranty requirements.Section J
R61The Contractor shall provide pest control services to ensure pests are controlled in a proper and timely manner.Section J
R62The Contractor shall comply with the Integrated Pest Management Plan (IPMP), and applicable DoD and OPNAV Instructions, and Federal, state, and local policies and regulations.Section J
R63The Contractor shall develop and execute a plan for pest control services. The Contractor’s Work Plan (CWP) shall adhere to applicable References and Technical Documents contained in J-1503020-05.Section J
R64The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with the specifications.Section J
R65The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc.Section J
R66The CWP shall include labels, Safety Data Sheets, New Pesticide Request, Planned Pesticide Use (PPU) Sheets, and comply with all applicable local, state, DoD and Federal policy and regulations, and the IPMP.Section J
R67The Contractor shall report conditions that promote or are conducive to pest infestations. These include sanitation problems, improper food storage practices, inadequate exclusion policies, or damaged or missing exclusion devices or the like. The Contractor shall report these conditions per Section F. Report must be legible and can be submitted electronically or hand-written to the COR/PAR.Section J
R68Scheduled pest control services shall include both inspection and treatment of the following categories of pests: nuisance pests, public health pests, structure damaging pests, lawn turf and ornamental plant pests, vegetation management, and vertebrate pests.Section J
R69The Contractor shall perform pest control for public health pests and pests that may adversely affect the DoD mission and military operations; the health and well-being of people; and structures, material, and property.Section J
R70Preventive applications of pesticide in the absence of a pest or signs/symptoms of a pest are prohibited except in cases, such as termite pretreatment, pre-emergence weed and mosquito larval control (in special circumstances, such as pre-flood), where it is an effective means of Integrated Pest Management (IPM).Section J
R71The Contractor shall control nuisance pests to ensure facilities are free from nuisance pests.Section J
R72The Contractor shall perform scheduled pest control for Nuisance Pests at the facilities listed on the Frequencies for Scheduled Work table in J-1503020-07.Section J
R73The following nuisance pest areas shall be inspected and treated, as necessary, per the General Requirements and Performance Standards specified within Nuisance Pest Requirements in J-1503020-07. 001 Ant Control, 002 Arthropod Control in Food Handling Establishments, 003 Cockroach Control, 004 Flea Control in and Around Buildings and Structures, 005 Miscellaneous Arthropod Pest Control, 006 Stored Product Pest Control (Arthropods)Section J
R74The Contractor shall control public health pests to prevent vector borne diseases or impacts to public health.Section J
R75The Contractor shall perform scheduled pest control for Public Health Pests at the facilities listed on the Frequencies for Scheduled Work table in J-1503020-08.Section J
R76The following public health pest areas shall be inspected and treated, as necessary, per the General Requirements and Performance Standards specified within Public Health Pest Requirements in J-1503020-08. 007 Aerial Spray Support and Operations, 011 Bed Bugs, 012 Bee, Wasp, Hornet, and Stinging Arthropod Control, 013 Childcare Facilities/Sensitive Areas Pest Control, 014 Filth Fly Control, 017 Tick Survey and Control OutdoorsSection J
R77The Contractor shall control structure damaging pests to ensure facilities are free of structure damaging pests.Section J
R78The Contractor shall perform scheduled pest control for Structure Damaging Pests at the facilities listed on the Frequencies for Scheduled Work table in J-1503020-09.Section J
R79The following structure damaging pest areas shall be inspected and treated, as necessary, per the General Requirements and Performance Standards specified within Structure Damaging Pest Requirements in J-1503020-09. 019 Other Wood Destroying Organisms (Non-Termite) Control, 020 Survey for Termite and Wood Destroying Organisms.Section J
R80The Contractor shall control lawn, turf and ornamental plant pests to ensure facilities are free of lawn, turf and ornamental plant pests.Section J
R81The Contractor shall perform scheduled pest control for Lawn, Turf and Ornamental Plant Pests at the facilities listed on the Frequencies for Scheduled Work table in J-1503020-10.Section J
R82The following lawn, turf and ornamental plant pests/pest areas shall be inspected and treated, as necessary, per the General Requirements and Performance Standards specified within Lawn, Turf and Ornamental Plant Pest Requirements in J-1503020-10. 021 Mole Cricket Control, 022 Turf and Ornamental Pest Control.Section J
R83The Contractor shall manage vegetation to ensure facilities are free of vegetation pests.Section J
R84The Contractor shall perform vegetation management for aquatic and non-aquatic vegetation pests at the facilities listed on the Frequencies for Scheduled Work table in J-1503020-11.Section J
R85The following vegetation pest areas shall be inspected and treated, as necessary, per the General Requirements and Performance Standards specified within Vegetation Management Requirements in J-1503020-11. 024 Industrial Sidewalk, Substation, Vault and Right-of-Way Weed Control, 025 Turf and Ornamental Bed Weed Control.Section J
R86The Contractor shall control vertebrate pests to ensure facilities are free of vertebrate pests.Section J
R87The Contractor shall perform scheduled pest control for Vertebrate Pests at the facilities listed on the Frequencies for Scheduled Work table in J-1503020-12.Section J
R88The following vertebrate pest areas shall be inspected and treated, as necessary, per the General Requirements and Performance Standards specified within Vertebrate Pest Requirements in J-1503020-12. 026 Bat Control in Buildings, 027 Commensal Rodents in and Around Buildings and Structures, 028 Pest Bird Control, 029 Pest Vertebrate ControlSection J
R89The Contractor shall perform service orders in a timely manner to ensure the appearance and infestations of pests are controlled.Section J
R90The Contractor shall receive pest control service orders per the work reception requirements in Annex 2.Section J
R91The Contractor shall schedule and perform pest control service orders in a way that minimizes disruptions to customers and Government operations.Section J
R92The Contractor shall respond to pest control service orders in accordance with the response times stated for each pest group performance standard in Section J.Section J
R93The Contractor shall notify the KO upon identification that the pest control service order will exceed the specified limits of liability in accordance with reporting requirements in Annex 2.Section J
R94The Contractor shall not invoice for incomplete pest control service orders and pest control service orders not issued.Section J
R95The Contractor shall survey the area to determine the level of infestation prior to performing treatment.Section J
R96Submit a monthly summary of completed pest control service orders per section F.Section J
R97The Contractor shall report pest management operations to ensure the effectiveness and safety of control efforts can be monitored in a proper and timely manner.Section J
R98The Contractor shall create and submit a completed electronic Pest Management Record for each pest management operation, both chemical and non-chemical, e.g., pest survey, pesticide application, pest control service order, per section F.Section J
R99The Contractor shall submit the Pest Management Operations Report per Section F using the NAVFAC PMC approved online pest management reporting system.Section J

Recent awards in NAICS 561710

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-01MATUSZAK-HYGIENE GMBH & CO. KGDepartment of the Army · AFH PEST CONTROL SERVICES AT USAG-BAVARIA GRAFENWOEHR, VILSECK, HOHENFELS, GARMISCH IN ACCORDANCE WITH THE ATTACHED PWS AND ELIN SHEET. POP 01 SEPT 2026 - 31 OCT 2026$15,631
2026-09-01MATUSZAK-HYGIENE GMBH & CO. KGDepartment of the Army · THE PURPOSE OF THIS TASK ORDER IS TO PERFORM PEST CONTROL SERVICES AT USAG BAVARIA FROM 01SEP2026 THRU 31OCT2026 IAW THE PERFORMANCE WORK STATEMENT AND ELIN SHEET.$49,205
2026-08-01MATUSZAK-HYGIENE GMBH & CO. KGDepartment of the Army · THE CONTRACTOR SHALL MANAGE ALL PEST CONTROL AND SURVEILLANCE RELATED REQUIREMENTS WITHIN USAG WIESBADEN. SERVICES SHALL INCLUDE REGULARLY SCHEDULED PEST CONTROL SERVICES AS WELL AS ON-DEMAND SERVICE $122,728
2026-07-22ACTION TERMITE & PEST CONTROL, INC.Defense Logistics Agency · DLA PEST CONTROL$158,694
2026-07-20SOLUTIONS A.E. INC.Department of the Army · AGWASH SERVICES$315,735
2026-07-17DIVERSE PEST MANAGEMENTDepartment of the Air Force · WEED ABATEMENT AT ARGUELLO ROAD, SANTA YNEZ RIDGE ROAD, POINT SAL ROAD, AND B12006.$0

Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.