Building 434 Roof Repair: requirements and submission rules

74 requirements and 15 submission rules found in the solicitation documents for N40085-26-RFPRFQ-NEW-LONDON-ROICC-0049. Use them as the start of your compliance matrix.

Solicitation number
N40085-26-RFPRFQ-NEW-LONDON-ROICC-0049
Agency
DEPT OF DEFENSE / DEPT OF THE NAVY / NAVFAC / NAVFAC ATLANTIC CMD / NAVFAC MID-ATLANTIC / NAVFACSYSCOM MID-ATLANTIC
NAICS
236220
Set-aside
8(a) Set-Aside (FAR 19.8)
Responses due
21 December 2026 (23 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within three working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP.
  • Submit results of air samples, signed by the CP, within 72-hours after the air samples are taken. d.
  • Use the submittal transmittal forms to record actions regarding samples.
  • 1.8 PROJECT SUBMITTAL REGISTER A sample Project Submittal Register showing items of equipment and materials for when submittals are required by the specifications is provided as "Attachment A - Submittal Register." 1.8.1 Submittal Management Prepare and maintain a submittal register, as the work progresses.
  • 1.7 INFORMATION ONLY SUBMITTALS Submittals without a "G" designation must be certified by the QC manager and submitted to the Contracting Officer for information-only.
  • 1.5.2 Contractor Quality Control (CQC) Plan Submit no later than 30 days after Contract Award , the CQC Plan proposed to implement the requirements FAR 52.246-12 Inspection of Construction.
  • Signed Certificate of Qualifications must be placed in the SECTION 26 41 00 Page 2
  • Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals View Location Map Progress and Completion Pictures 1.3 VIEW LOCATION MAP Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations.
  • Regardless of whether a baseline or other NAS is submitted and accepted, an updated NAS must be submitted monthly to the Government.
  • Submit two samples, or two sets of samples showing the range of variation, of each required item.
  • Submit one sample panel or provide one sample installation where directed.
  • Submit one sample of nonsolid materials.
  • Submit pertinent certifications at the same time.
  • Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work.
  • Submit the AHA for review at least 15 working days prior to the start of each activity task, or DFOW.

Requirements

IDRequirement
R1The work includes the replacement of the existing roof systems of Buildings 430 and 434 with an EPDM roof and incidental related work. The roof replacment shall encompass both wings and connector for each building. Design to include demolition of of existing roof down to concrete/tectum. New roof design to include vapor barrier, insulation, cover board, roof membrane, flashings, parapet cap, and roof drains. The work at Building 434 is the base bid, and all work associated with Building 430 is a bid option.B.434
R2A firm fixed proposed price is required for Option Item No. 1.B.434
R3Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.B.434
R4Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.B.434
R5Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, including delivery vehicles, are clearly identified with their company name.B.434
R6Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency.B.434
R7Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title.B.434
R8The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer. Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the building during the construction period.B.434
R9Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Prices (construction Contract) as directed by the Contracting Officer. Schedule of Prices must have cost summarized and totals provided for each construction category. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices.B.434
R10Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice.B.434
R11A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.B.434
R12Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.B.434
R13Provide project superintendent with a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings.B.434
R14Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work.B.434
R15Immediately after award, prior to commencing any work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Meeting. The meeting must take place within 35 calendar days after award of the contract, but prior to commencement of any work at the site.B.434
R16Prior to 75 percent completion, modify the Red Zone Checklist template by adding or deleting critical activities applicable to the project and assign planned completion dates for each activity. Submit the modified Red Zone Checklist to the Contracting Officer.B.434
R17Host the partnering session within 45 calendar days of contract award.B.434
R18Mobilize to the jobsite within 60 calendar days after contract award. Mobilize is defined as having equipment AND having a physical presence of at least one person from the contractor's team on the jobsite.B.434
R19Utilize the Naval Facilities Engineering Systems Command's (NAVFAC's) Electronic Construction and Facility Support Contract Management System (eCMS) for the transfer, sharing, and management of electronic technical submittals and documents.B.434
R20Within 20 calendar days of contract award, provide to the Contracting Officer a list of Contractor's personnel who will have the responsibility for the transfer, sharing and management of electronic submittals, RFIs, daily reports, and other files and will require access to the eCMS.B.434
R21Before preparation of the Baseline NAS, and prior to the start of work, meet with the Contracting Officer to discuss the proposed NAS and the requirements of this section.B.434
R22Submit the Baseline NAS within 30 calendar days after contract award. Data date must be set to contract award date and no progress recorded for any activity.B.434
R23Submit the first Look Ahead Schedule 30 days after contract award and continue to submit weekly until contract completion.B.434
R24Within 30 calendar days of contract award, submit to the Contracting Officer for approval an individual who will serve as the Designated Project Scheduler. Include a copy of the candidate's resume with qualifications.B.434
R25The Designated Project Scheduler must have served as a scheduler and prepared and maintained at least three previous NAS for projects, at least one within the last 5 years of similar size and complexity to this contract, using Oracle Primavera P6.B.434
R26Prepare and maintain project NAS using Oracle Primavera P6 software in a version compatible with Government's current version. Submit XER files exported as version 17 or earlier.B.434
R27Government approved Division 01 preconstruction submittals that are required prior to or commencing with the start of work must be submitted within 30 calendar days of contract award unless specified elsewhere in the specifications. Contractor approved Division 01 submittals that are required prior to or commencing with the start of work must be submitted within 45 calendar days of contract award unless specified elsewhere in the specifications.B.434
R28Submit an updated electronic copy of the submittal register to the Contracting Officer with each invoice request. Provide an updated Submittal Register monthly regardless of whether an invoice is submitted.B.434
R29Provide a Monthly Exposure Report by the fifth day of each month for the previous month. This report is a compilation of employee-hours worked each month for all site workers, both Prime and subcontractor.B.434
R30Complete the checklist monthly and submit with each request for payment voucher. This submission is required monthly even when a payment voucher is not requested. An acceptable score of 90 or greater is required.B.434
R31Subcontractors on this Contract must have an effective EMR less than or equal to 1.10, as computed by the National Council on Compensation Insurance (NCCI) or if not available, as computed by the state agency's rating bureau in the state where the subcontractor is registered, when entering into a subcontract agreement with the Prime Contractor or a subcontractor at any tier.B.434
R32Subcontractors on this Contract must have a DART rate, calculated from the most recent, complete calendar year, less than or equal to 3.4 when entering into a subcontract agreement with the Prime Contractor or a subcontractor at any tier.B.434
R33Provide a minimum of one Level One SSHO that meets the requirements of EM 385-1-1 for this project.B.434
R34Submit and obtain a written permit prior to performing 'Hot Work' (i.e., welding or cutting) or operating other flame-producing/spark producing devices, from the Fire Division.
R35It is also mandatory to have a designated FIRE WATCH for any 'Hot Work' done at this activity. The Fire Watch must be trained in accordance with NFPA 51B and remain on-site for a minimum of 1 hour after completion of the task or as specified on the hot work permit.B.434
R36Mandatory PPE includes: a. Head Protection that meets ANSI/ISEA Z89.1; b. Long Pants; c. Appropriate Safety Footwear; d. Appropriate Class Reflective VestsB.434
R37Each hazardous material must receive approval from the Contracting Office or their designated representative prior to being brought onto the job site or prior to any other use in connection with this Contract. Allow a minimum of 10 working days for processing of the request for use of a hazardous material.B.434
R38After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer and discuss the Contractor's quality control system.B.434
R39The QC Manager must be an individual with a minimum of 10 years combined experience in the following positions: Project Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager on similar size and type construction Contracts which included the major trades that are part of this Contract. The individual must have at least 4 years experience as a QC Manager. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification, safety compliance, and sustainability.B.434
R40If the QC Manager does not have a current certification, obtain the CQM for Contractors course certification within 90 days of award.B.434
R41Provide a separate QC Specialist at the work site for each of the areas as listed in the Matrix listed below, who must assist and report to the QC Manager and who must have no duties other than their assigned quality control duties. These individuals or specialized technical companies are directly employed by the Prime Contractor and cannot be employed by a supplier or subcontractor on this project.B.434
R42Prior to the start of work, submit for Government approval a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation.B.434
R43Submit truck and material haul routes along with a Dirt and Dust Control Plan for controlling dirt, debris, and dust on Installation roadways.B.434
R44Submit the EPP within 15 days after Contractor award and not less than 10 days before the preconstruction meeting.B.434
R45Submit the 'Contractor Hazardous Material Inventory Log' ... to the Contracting Officer at the start and at the end of construction (30 days from final acceptance), and update no later than January 31 of each calendar year during the life of the contract.
R46Divert a minimum of 60 percent by weight of the project construction waste and demolition debris/waste from the landfill or incinerator.B.434
R47Submit Construction Waste Management Plan within 15 days after contract award. Revise and resubmit Construction Waste Management Plan as necessary, in order for construction to begin.B.434
R48A Final Construction Waste Diversion Report is required at the end of the project. Provide Final Construction Waste Diversion Report 60 days prior to the Beneficial Occupancy Date (BOD).B.434
R49The Performance Bond must remain effective throughout the construction and warranty period.B.434
R50Submit As-Built Drawings 30 days prior to Beneficial Occupancy Date (BOD).B.434
R51Submit a written training plan to the Contracting Officer for approval at least 60 calendar days prior to the scheduled training. Training plan must be approved by the Quality Control Manager (QC) prior to forwarding to the Contracting Officer.B.434
R52Submit the 100 percent submittal of the FDW Prefinal Submittal to the Contracting Officer for approval within 90 calendar days of the Beneficial Occupancy Date (BOD).B.434
R53The competent person must have a current State of Connecticut asbestos contractors or supervisors license.B.434
R54The PQP must be appropriately licensed in the State of Connecticut as a Project Monitor. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier subcontractor.B.434
R55Submit training certification and a current State of Connecticut Asbestos Contractor's and Supervisor's License. Submit evidence that the Designated Competent Person has a minimum of 2 years of on-the-job asbestos abatement experience relevant to OSHA designated competent person requirements. The Designated Competent Person must be a first tier subcontractor.B.434
R56Submit a copy of the asbestos contractor's license issued by the State of Connecticut.B.434
R57Demonstrate a minimum of 5 years experience implementing OSHA's Lead in Construction standard (29 CFR 1926.62). The CP must be a Certified Industrial Hygienist (CIH) certified by the Board for Global EHS Credentialing (BGC) or a Certified Safety Professional (CSP) certified by the Board of Certified Safety Professionals. Submit proper documentation that the CP is certified and trained in accordance with federal, State and local laws.B.434
R58The plan must be developed and signed by a CIH. The plan must include the name and certification number of the person signing the plan.B.434
R59Obtain the services of an industrial hygienist certified by the American Board of Industrial Hygiene to certify training, review and approve the PCB removal plan, including determination of the need for personnel protective equipment (PPE) in performing PCB removal work.B.434
R60Submit a PCB Disposal Plan within 45 calendar days after award of contract for Contracting Officer's approval.B.434
R61Fabricate work in an AISC Certified Fabrication Plant, Category BU. Erect work by an AISC Certified Erector, Category CSE.B.434
R62Provide structural steel containing a minimum of 80 percent recycled content. Submit data identifying percentage of recycled content for structural steel.B.434
R63Submit information demonstrating EPDM sheet roofing membrane manufacturer has at least 20 year's experience in manufacturing EPDM roofing products.B.434
R64Submit information demonstrating roofing system applicator is approved, authorized, or licensed in writing by the roof membrane manufacturer and is required to have a minimum of 5 year's experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty.B.434
R65Engineer must be approved, authorized, and currently licensed by the state of Connecticut, and have a minimum of 5-year's experience as an approved Engineer for manufacturers of similar roof systems.B.434
R66Provide a manufacturer's warranty that has no dollar limit, covers full system water-tightness and has a minimum duration of 20 years.B.434
R67The Contractor is required to warrant for a period of 5 years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly.B.434
R68Provide exposed exterior sheet metal and aluminum with a baked on, factory applied coil fluoropolymer color coating or approved equal siliconized polyester coating. Dry film thickness of coatings must be 0.8 to 1.3 mils. Color to be selected from manufacturer's standard range of color choices. Field applications of color coatings are prohibited and will be rejected.B.434
R69Provide a manufacturer's warranty to repair, or replace, sheet metal flashing and trim that shows evidence of deterioration of factory-applied finishes within 20 years from date of project substantial completion.B.434
R70Engage an experienced Installer who is: a. FM Research approved in accordance with FM 4991, operating as a UL Certified Firestop Contractor, or b. Certified, licensed, or otherwise qualified by the firestopping manufacturer as having the necessary staff, training, and a minimum of 3 years experience in the installation of manufacturer's products in accordance with specified requirements.B.434
R71The inspector must have a minimum of two years experience in construction field inspections of firestopping systems, products, and assemblies. The inspector must be completely independent of, and divested from, the installer, the manufacturer, and the supplier of any material or item being inspected.
R72Provide equipment items supported by service organizations that are located within 250 miles of the equipment installation in order to render service to the equipment on a regular and emergency basis during the warranty period of the contract.B.434
R73The inspection and report must be completed and submitted within 60 calendar days of the contract award date and the report must be received and approved prior to any work performed on the lightning protection system removals/modifications as part of the contract.B.434
R74A 100 percent test point test and inspection is required by all services. Identify test points for lightning protection system connections and bonds.B.434

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2031-02-11FEDVET CONSTRUCTIONDepartment of the Army · MIN GUARANTEE$2,500
2030-09-28STRUCTSURE PROJECTS INCDepartment of the Navy · MEDICAL MACC-MINIMUM GUARANTEE$0
2027-11-02CCI PRIME CONTRACTORS, LLCDepartment of the Air Force · FY25 MSG CES HANGAR H285 REPAIR MAINTENANCE DOCK$27.62 million
2027-07-31DOYON TECHNICAL SERVICES, LLCDepartment of the Army · PJ00082-25 - PROVIDE AND INSTALL ALL MATERIAL AND LABOR NECESSARY TO DEMO FAILED CMP, AND RE-INSTALL RCP. PJ00018-26 - DESIGN, DEMOLISH, INSTALL, AND COMMISSION A COMPLETE AND OPERATIONAL NEW DRY PIPE$486,999
2027-07-17CONTI FEDERAL SERVICES, LLCDepartment of the Army · B-21 60 ROW SOUTH ENVIRONMENTAL PROTECTION SHELTERS (EPS) AT ELLSWORTH AIR FORCE BASE (AFB), SOUTH DAKOTA (SD)$43.99 million
2027-04-28MIRADOR ENTERPRISES, INC.Department of the Air Force · THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DESIGN INSTALL EMERGENCY WASH STATIONS, HOLLOMAN AFB, NEW MEXICO.$79,056

Source: USAspending.gov, retrieved 2026-11-03. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.