NAWCAD (WOLF) Airborne Systems Integration (ASI ) Division Technical/Project Management Support (TPMS): requirements and submission rules
88 requirements and 15 submission rules found in the solicitation documents for N0042127R1008. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- The contractor must obtain written approval from the Contracting Officer to submit the Offer via an alternate method as shown in paragraph 4.2 or the Contracting Officer may advise the contractor that the Government will follow the procedures set forth in FAR 15.107(c) to amend the RFO closing date.
- N00421-27-R-1008 Attachment L1 Page 13 of 22 past performance of a commercial contract, not in support of a Government requirement, then the Contractor must submit an Attachment P2, CPAQ to the commercial entity, and the Assessing Official (person completing the CPAQ) is not required to be a Government employee.
- As such, text and/or information included via a “text overflow indicator” (plus sign at the bottom of the text) will not be evaluated. “Front matter” - such as a cover letter/page, table of contents, and lists of definitions or acronyms - does not count towards the page limits.
- Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements) 2.5 Offers must be formatted using letter-sized (8.5” x 11”) pages, single-spaced, with one- inch margins all around.
- Documents submitted by the subcontractor directly to the Government must have the prime contractor’s name, CAGE, and RFO number on the first page of the document.
- 1.2 SAMPLE TASKS The Contractor must submit an Attachment T2, Sample Task, within Volume 1 – Technical to provide a written response to the Sample Tasks described in Paragraphs 1.2.1 and 1.2.2 below.
- N00421-27-R-1008 Attachment L1 Page 11 of 22 2.2 The Contractor must complete Attachment P1, Past Performance Information Forms, and submit as part of Volume 2.
- All RFO questions must be submitted no later than 12:30 p.m.
- 4.1.4 The submission date for all Volumes must be no later than the date and time specified in Block 9 of the SF 33 of the RFO.
- 4.1.5 If there is an unanticipated PIEE System outage within 24 hours of the Offer due date and the outage has interrupted normal Government processes so that Offers cannot be received by the exact time specified in the RFO, the contractor must immediately notify the Contracting Officer.
- This notification must occur prior to the Offer submission deadline and must be made in writing.
- 2.4 Contractors must provide the SOW/Performance Work Statement (PWS) in Annex 1 for each contract reference (contract or delivery/task order) submitted via an Attachment P1, Past Performance Information Form.
- 2.3 The Contractor must submit the Offer in separate volumes in accordance with the naming convention and page limitations specified in Table 1.
- Use 12-point Times New Roman font, without compressed or condensed spacing. between lines or characters to circumvent the provided page limits.
- When using Government-supplied templates (i.e., Attachments T1, T2, P1, P2, C1, C2, and C3), do not modify the font or scaling, except that headers and footers may be reduced to 9-point font size.
Requirements
| ID | Requirement |
|---|---|
| R1 | Only qualified businesses that currently hold a SeaPort- Next Generation (NxG) MAC will be considered for Task Order (TO) award.Section A |
| R2 | The Contractor must prepare and provide Offers in accordance with the instructions provided herein.Section A |
| R3 | The Contractor must submit sufficient information, in accordance with the instructions in Section J, Attachment L1, to clearly demonstrate a thorough understanding of and compliance with all aspects of the RFO.Section A |
| R4 | The Offer must not include information unrelated to the specific requirements of Section J, Attachment L1, nor must it contain elaborate brochures or other presentation material beyond what is necessary for a complete and effective response.Section A |
| R5 | Information must not be repeated in multiple volumes. Detailed information must be included in the most logical place and where overlap exists, summarized and cross-referenced in other sections. Cost information (e.g., dollar values and/or hourly rates) must appear only in Volume 2– Cost/Price.Section A |
| R6 | The Contractor must respond to all requirements of the RFO without altering or rearranging the structure of the RFO.Section A |
| R7 | Alternate Offers are not acceptable. Taking exception or deviating from any term or condition of the RFO may render the Offer ineligible for award, unless the RFO expressly authorizes such an exception or deviation regarding that specific term or condition.Section A |
| R8 | The Offer must be structured so that its volume/paragraph number matches the corresponding volume/paragraph numbering in Section J, Attachment L1 – Instructions to Contractors, 'Part B: Specific Instructions'.Section A |
| R9 | If the Contractor does not provide a response to a specific paragraph, a rationale must be included.Section A |
| R10 | The Contractor must use Microsoft Office (MS) 2016 compatible software, and Adobe software, if applicable, to develop the Offer. Any Adobe documents, letters, other signed documents, and evidence of compliance must be provided as a fully searchable Portable Document Format (.pdf) file. Numerical data presented in MS Office formats must not be presented as images (e.g., pasted as a picture out of an MS Excel file). MS Excel spreadsheets must use formulas and functions to the maximum extent practicable. Use of software other than MS Office 2016 is prohibited unless explicitly authorized for non-Adobe PDF or non-MS Office submissions. The Contractor must provide the Government with full unprotected, and unlocked access to all MS Excel files and underlying data.Section A |
| R11 | Each Volume or Attachment must be submitted as a single file whenever possible. File names must follow the prescribed naming convention and include no more than three letters identifying the Contractor (e.g., ABC_V1_AttT1.docx; RST_V2_AttC1.xlsx).Section A |
| R12 | Visual aids must be incorporated within the applicable Offer volume or Government-provided template; separate visual-aid attachments are not permitted unless specifically authorized by the RFO.Section A |
| R13 | Personal photographs, headshots, or other images of proposed Key Personnel are not permitted. Numerical data in Microsoft Office formats shall not be submitted solely as an image in lieu of searchable, editable data.Section A |
| R14 | Do not include hyperlinks, embedded sound or video files, scrollable content blocks, or ZIP files.Section A |
| R15 | Each volume must contain the following information: Cover and title page; Title of Offer and Offer number as applicable; Contractor’s or Subcontractor’s name, address, CAGE Code, and Point of Contact (POC) (Name) and Contact Information (Email Address and Phone Number); Contractor’s SeaPort-NxG MAC contract number (Contractor only); RFO number; Offer volume number; Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements) |
| R16 | To ensure clarity and efficiency in data presentation, all text within visual aids (including photographs, screenshots, diagrams, drawings, graphics, charts, and tables), should be no smaller than 10-point Times New Roman font, where practicable.Section B |
| R17 | Graphs, charts, and tables shall include labels, legends, and grids, as applicable, sufficient to permit direct interpretation of the information presented.Section B |
| R18 | The Volume 3 Cost/Price attachments must be submitted as separate files. The Contractor and Subcontractor responses in Attachment C1 must be unprotected and unlocked, with formulas intact to show mathematical operations and the spreadsheets must be formatted on letter size (8.5” X 11”) paper.Section B |
| R19 | Contractors/Subcontractors must not submit hard copies of the Offer.Section B |
| R20 | All volumes of the Offer must be submitted electronically through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil under RFO Number N00421-27-R-1008. No other submissions, such as mail, hand-carried, or other electronic system (e.g., DOD SAFE) are authorized by the RFO unless specifically authorized by the Contracting Officer pursuant to paragraph 4.2 below.Section B |
| R21 | Offers must be marked “Controlled Unclassified Information” and “Source Selection Information – See FAR 2.101 and 3.104”.Section B |
| R22 | This volume [Volume 1: Technical] must not contain any reference to cost/price aspects of the Offer. |
| R23 | The Contractor must provide its response to Volume 1 - Technical within the following two documents. No other format will be considered. Key Personnel (Attachment Tl) Sample Tasks (Attachment T2)Section B |
| R24 | The Contractor must provide a completed Attachment Tl for each Key Personnel proposed. Each individual proposed as Key Personnel must have a separate Attachment Tl, with Parts I-IV and the Qualification Matrix completed for each submission.Section B |
| R25 | Only current or contingent hire personnel may be proposed as Key Personnel. No prospective hires may be proposed as Key Personnel.Section B |
| R26 | The Contractor must provide a complete Attachment Tl for each Key Personnel corresponding with the number of Key Personnel in each Key Personnel labor category that are listed in Section J, Attachment 01 - SOW Paragraph 3.4.1.1. Key Personnel proposed for the base year must be the same proposed for all option years (Option Years 1–4).Section B |
| R27 | If contingent Key Personnel are proposed, the Contractor must submit a signed Letter of Commitment for each individual in Volume 3 – Cost, in accordance with Section J, Attachment L1, Part B, Paragraph 3.3.1.1.3.Section B |
| R28 | The Contractor must ensure that the nature of the experience aligns with the stated requirement. For example, if five (5) years of Team Lead experience are required, the experience must include specific examples of leading a team through execution, rather than general supervisory experience.Section B |
| R29 | If a labor category requires supervisory experience, the terms “supervisor,” “supervised,” or “supervision” should be used, rather than “team lead,” “leader,” or “manager,” when describing duties involving personnel supervision.Section B |
| R30 | In the Key Personnel Qualification Matrix section of Attachment T1, the Contractor must explain how each proposed Key Personnel’s experience meets the minimum qualifications in Section J, Attachment 01 - SOW, Paragraph 3.4. Only experience documented in the “Resume” Section (Parts I – IV) of the Attachment T1 will be considered.Section B |
| R31 | The Contractor’s response shall outline in totality how the proposed employee meets the requirements outlined in the required experience. The Contractor shall outline the proposed employee’s work experience in each of the areas of the functional description, the total of which shall meet or exceed the total years required, including any substitution. |
| R32 | Provide a detailed description of the technical approach including a step-by-step procedure and the methodology that would be used in supporting the ASI Division with the development of an efficient and effective Government Supply Procurement Tracking tool. The tool must present data in a dashboard, manage Government procurements from requirements definition through delivery, and be utilized for all Government supply avenuesSection B |
| R33 | Detail all assumptions (as applicable) relative to the sample task and your technical approach to ensure full understanding of your response by the Government.Section B |
| R34 | Describe how the proposed approach is sustainable ensuring successful execution in outyears and how project portfolios will be efficiently and effectively integrated within a shared resourceSection B |
| R35 | Identify the models and/or other tools that would be utilized to perform and track progress of the task.Section B |
| R36 | The Contractor shall support project management from initiation through closeout to include financial/cost management and analysis. At a minimum, the Contractor shall provide financial reports and associated analyses regarding impacts associated with project schedule and risk.Section B |
| R37 | Provide a detailed description of the project management approach including a step-by-step procedure and methodology for developing a project plan of this size, including details of necessary tools and required documents; budget related processes for spend plans, funds acceptance, and funds execution; schedule; resource planning; and project risks.Section B |
| R38 | What are the anticipated impacts of the Q3 budget reduction on technical project management (TPM) capacity, delivery timelines, and project governance? Furthermore, what strategic adjustments, mitigation plans, and resource trade-offs must leadership consider to minimize downstream disruption?Section B |
| R39 | What scope or execution changes does the Contractor propose to maintain the required schedule despite the funding reduction.Section B |
| R40 | How would the Contractor communicate the funding decrease and plan to continue to execute the project as required? What considerations would need to be made and detail the recommended courses of action (COAs) to the Government.Section B |
| R41 | Contractors must not provide a Multiple Award Contract (MAC) IDIQ as a contract reference and instead must identify a specific task/delivery order as the contract reference within a single Attachment P1, Past Performance Information Form.Section B |
| R42 | For contract references (contract or delivery/task order) where the Contractor performed as a Subcontractor, the Contractor must clearly identify the applicable portion of the contract or delivery/task order requirements that they performed.Section B |
| R43 | The Prime Contractor must submit written consent from its Principal Subcontractor(s) that will allow the Government to coordinate any past performance issues directly with the Prime Contractor. If the Prime Contractor does not submit the written consent... for any Principal Subcontractor that does not provide the written consent, the Prime Contractor must provide the name, address, phone number, and email address of the Principal Subcontractor’s Point of Contact (POC) with whom the Government may address any past performance issues. The written consent and/or Principal Subcontractor POC information must be provided within Volume 2.Section B |
| R44 | Each submitted SOW/PWS must be cross-referenced to clearly demonstrate how it aligns to the RFO’s Section J, Attachment 01 - SOW via the Past Performance Cross Reference Matrix (CRM). The Contractor must submit a Past Performance CRM via Annex 2Section B |
| R45 | The Contractor and all Subcontractors proposing a cost reimbursable contract type (e.g. Cost Plus Award Fee (CPAF), Cost Plus Fixed Fee (CPFF), etc.) must complete and submit an Attachment C1 - Cost Reimbursable Workbook. No other format will be evaluated.Section B |
| R46 | The Contractor and all Subcontractors proposing a cost reimbursable contract type must complete and submit an Attachment C2 - Cost Reimbursable Narrative. No other format will be evaluated.Section B |
| R47 | All Subcontractors proposing a contract type other than cost reimbursable (e.g. Firm Fixed Price (FFP), Firm Fixed Price Level of Effort (FFP LOE), Time and Material (T&M), etc.) must only complete and submit Attachment C3 - Fixed/T&M Price Narrative (no Attachment C1 required). No other format will be evaluated.Section B |
| R48 | Unpriced subcontractors must not be proposed.Section B |
| R49 | Offers must be valid for at least 180 calendar days after being submitted.Section B |
| R50 | The Contractor must submit a completed Cost Workbook that contains pricing for all requirements in the SOW and all CLINs for the base year and option years 1-4. The contractor must not propose costs/price associated with FAR 52.217-8 Option to Extend Services.Section B |
| R51 | The Contractor is responsible for ensuring the accumulated totals of CLINs for each PoP and for the overall total proposed cost/price of the entire effort within the Section B worksheet are consistent with the values in the ‘TO Award Total Labor CPFF’ row of the Cost Summary worksheet.Section B |
| R52 | The Contractor must complete Attachment C1 following the “Instructions” worksheet within Attachment C1. The Subcontractor must follow the specific instructions for Subcontractors within the “Instructions” worksheet of Attachment C1. The Prime Contractor and Subcontractors are required to provide their inputs within the 'Indirect Rates and Fee' and 'Cost Summary' worksheets of Attachment C1.Section B |
| R53 | The Contractor must also complete the 'Fully Burdened Labor Rates' (FBLRs) worksheet (see Section J, Attachment L1, Part B, Paragraph 3.3.3) in accordance with the “Instructions” worksheet within Attachment C1... The Contractor must fully disclose the buildup of its proposed cost/price and must not use fully burdened hourly rates when pricing the labor for its own employees in the 'Cost Summary' worksheet. |
| R54 | If a Subcontractor proposes a cost-reimbursable contract type and uses FBLRs in its Offer to the Contractor, the Subcontractor must provide its own separate Attachment C1 to the Government, detailing the buildup of those rates. Subcontractors must document and provide an explanation (See Section J, Attachment L1, Part B, Paragraph 3.3.7) if its fully burdened labor rates derived from its own Attachment C1 do not match the fully burdened labor rates provided in its Offer to the Contractor.Section B |
| R55 | The total labor cost of this requirement is expected to exceed $44,206,048... Any Offer that does not meet the minimum dollar amount established must include a justification that explains why the Offer is below the minimum. The justification must be included as an Enclosure to Attachment C2.Section B |
| R56 | The Contractor and Subcontractors must complete Part I of Attachment C2 in accordance with the instructions within Attachment C2.Section B |
| R57 | The Contractor must provide as an Enclosure to Attachment C2 the following: A signed SF33 for the RFO and a signed SF30 for each amendment.Section B |
| R58 | The Contractor and Subcontractors must provide as an Enclosure to Attachment C2 the following: The most current Defense Contract Audit Agency (DCAA) Direct and/or Indirect Rate Approval Letters; DCAA Forward Pricing Rate Agreement (FPRA) or Recommendation (FPRR); and/or Defense Contract Management Agency (DCMA) Letters (such as accounting system letters, property management system letters, etc.), as applicable; A completed Section K of the RFO; Signed Representations, Certifications, and Acknowledgements and/or System for Award Management (SAM); An OCI disclosure and OCI Mitigation Plan, if applicable, based on the Contractor’s, and Subcontractor’s, completion of KTXT.209-9511, Organizational Conflicts of Interest Representation (Services); Letters of Commitment, see paragraph 3.3.1.1.3 below.Section B |
| R59 | The Contractor must provide documentation verifying that it has an adequate and acceptable accounting system in accordance with DFARS 252.242-7999, Accounting System Administration, as an Enclosure to Attachment C2. If the Contractor's accounting system has not been reviewed and deemed adequate by DCAA or DCMA, the Contractor must provide the following: A statement in Table 4 of the cost/price narrative stating that its Accounting System has not been reviewed or determined adequate by DCAA or DCMA (as applicable). A completed “Pre-award Survey of Prospective Accounting System Checklist”... as an Enclosure to Attachment C2.Section B |
| R60 | Subcontractors proposing a cost-reimbursable subcontract must provide documentation verifying their accounting system's adequacy and acceptability, as per DFARS 252.242-7999, as an enclosure to Attachment C2.Section B |
| R61 | The Contractor and Subcontractors must provide a cost narrative that outlines all ground rules and assumptions made while preparing the Cost/Price Offer and justifies the basis for each cost element listed belowSection B |
| R62 | The Contractor and Subcontractors must submit unburdened labor rates for all proposed personnel (current, contingent, and prospective hires). If composite or category averages are used, provide a detailed breakdown and explanation of how these rates were developed. Include a narrative describing the derivation of labor rates and the use of uncompensated overtime, if applicable.Section B |
| R63 | For all proposed current employees, the Contractor and Subcontractors must provide payroll verification by completing Table 6 – Hourly Direct Labor Rates for Current Employees in its entirety. If there any differences between the payroll-verified rates and the proposed rates, provide a justification within Attachment C2, Part II.Section B |
| R64 | For all proposed prospective hires, the Contractor and Subcontractors must propose direct labor rates equal to or greater than the direct labor rates stated in the “Minimum Direct Labor Rates” (MDLR) worksheet within Attachment C1 or stated within a Contractor’s DCMA/DCAA direct labor FPRA or FPRR. If the Contractor is leveraging a direct labor FPRA or FPRR, it must be included as an Enclosure to C2 and the Contractor must identify the proposed labor categories it covers and, if necessary, provide a crosswalk. Any labor categories not covered by the direct labor FPRA or FPRR must have direct labor rates equal to or greater than the MDLRs.Section B |
| R65 | If necessary, the Contractor and Subcontractors must escalate their current direct labor rates to align with the anticipated PoP start date of this TO. The Contractor and Subcontractor must indicate when their company typically implements direct labor rate increases and whether a rate increase is anticipated prior to the TO PoP start date. Proposed escalation rates must be supported by historical data. If the Contractor and/or Subcontractors do not have historical data, they must propose an escalation rate of 3.40% or higher for non-SCLS labor categories when a rate increase is anticipated prior to the TO PoP start date.Section B |
| R66 | The Contractor and Subcontractors must address labor escalation for all labor categories and justify the specific escalation rates proposed in Attachment C2, Part III. The Company’s historical escalation rates for the past three years must be provided in Attachment C2, Part III, Table 7.Section B |
| R67 | The Contractor and Subcontractors must propose escalation rates supported by historical data. If historical data is unavailable, an escalation rate of 3.40% or higher must be proposed for non-SCLS labor categories in option years 1-4.Section B |
| R68 | The Contractor and Subcontractors must ensure consistency between the narrative description of Indirect Costs stated in Attachment C2, and how the Indirect Costs are calculated within Attachment C1.Section B |
| R69 | The Contractor and Subcontractors must provide the last three years of historical actual indirect rates within Attachment C2, Part IV, Table 8.Section B |
| R70 | The Contractor and Subcontractors must submit detailed justification of the proposed indirect rates in Attachment C2, Part IV. If any of the proposed Indirect rates differ from the historical actual rates and/or DCAA/DCMA information, a justification must be provided for the variance must be included in Attachment C2, Part IV.Section B |
| R71 | The Contractor and Subcontractors must provide supporting information to explain its estimating practices within Attachment C2, Part V.Section B |
| R72 | Contractors, including Subcontractors, must identify proposed fee rates, total fee amounts, and the cost elements to which the fee is being applied within Attachment C2, Part VI. Fee rates must be clearly distinguishable. Fee must not be applied to ODCs. The Contractor must ensure the proposed fee rate does not exceed fee rate stated in the Maximum Profit/Fee Rate – Applicable to Cost Plus Fixed Fee CLINs Only which is in its SeaPort-NxG MAC award.Section B |
| R73 | (Applicable to Prime Contractors Only): Fixed fee (rounded to exactly two (2) decimal places) must be calculated based on a fee per hour methodology in accordance with HTXT.232-9510, Payment of Fixed Fee (NAVAIR)(OCT 2005). The fee per hour must be calculated by dividing the total Fixed Fee proposed for all years of the task order by the total LOE hours. The Contractor must confirm that the total Fixed Fee value stated in Attachment C1 equals the amount derived by multiplying the proposed fee per hour and total LOE.Section B |
| R74 | Contractors, including Subcontractors, must provide a narrative that addresses any assumptions made during the preparation of the cost/price proposal and discuss the basis for travel and material costs, including any indirect costs being applied to each specific cost element within Attachment C2, Part VII.Section B |
| R75 | If claiming Cost of Money (COM) as an allowable cost, the Contractor and Subcontractors must submit a DD 1861 as an enclosure to Attachment C2 and provide calculations for the proposed amount in Attachment C2, Part VIII.Section B |
| R76 | In accordance with FAR 15.404-8(a), the Contractor must conduct appropriate cost or price analysis to establish the reasonableness of the proposed subcontract prices. The results of these analyses must be included in its cost reimbursable narrative. Provide a detailed explanation for the basis of this determination for each proposed Subcontractor, regardless of proposed subcontract type, in Attachment C2, Part IX, or as an Enclosure.Section B |
| R77 | The Contractor must submit annual FBLRs for all proposed personnel (current, contingent, and prospective hires) for both the Contractor and each Subcontractor, using the "Fully Burdened Labor Rates" worksheet in Attachment C1... If an employee's proposed annual fully burdened labor value exceeds the labor tripwire, Contractors and Subcontractors must provide a justification in Attachment C2, Part X, explaining the reasonableness for exceeding the labor tripwire for the applicable employee(s).Section B |
| R78 | The Contractor must provide its proposed pass-through rate for this TO and clearly identify the indirect burdens and bases the burdens are being applied to when calculating the pass-through rate. The Contractor must provide the pass-through rate stated within the Maximum Pass-Through Rates - Applicable to all TO types which is in its SeaPort-NxG MAC award, within Attachment C2, Part XI.Section B |
| R79 | if the proposed cost/price appears low due to a corporate decision to absorb costs (e.g., lower than usual burdens or rates), the Contractor and Subcontractors must fully identify and explain any such investments in Attachment C2, Part XIII.Section B |
| R80 | The Contractor and Subcontractors must include a narrative to describe any changes made to the Attachment C1 and/or C2 (provided with the RFO) within Attachment C2, Part XV.Section B |
| R81 | The Contractor and Subcontractors must provide authorized representative information and an authorized representative signature in Attachment C2, Part XVI validating all information provided is accurate.Section B |
| R82 | Subcontractors proposing a contract type other than cost reimbursable (e.g., FFP, FFP LOE, T&M, etc.) are not required to provide the same level of details as required under cost reimbursable Offers and must only complete and submit a Fixed/T&M Price Narrative, Attachment C3.Section B |
| R83 | Subcontractors must complete Part I of the Attachment C3 in accordance with the instructions within Attachment C3.Section B |
| R84 | Subcontractors must provide, as an Enclosure to Attachment C3, the following: A completed Section K of the RFO; An OCI disclosure and OCI Mitigation Plan, if applicable, based on the Subcontractor’s completion of KTXT.209-9511, Organizational Conflict of Interest Representation (Services); Letter of Commitment for each proposed Contingent Hire, if proposing a Key Personnel. Required information within the Letter of Commitment is specified in Section J, Attachment L1, Part B, Paragraph 3.3.1.1.3.Section B |
| R85 | Subcontractors must include a narrative to describe any deviations from the information requested within Attachment C3, Part II.Section B |
| R86 | Subcontractors must provide authorized representative information and provide an authorized representative signature in Attachment C3, Part III validating all information provided is accurate.Section B |
| R87 | A work-year is defined as 1,920 hours exclusive of holidays and leave and must be utilized for proposal purposes. For evaluation purposes, the Contractor must propose the labor categories and hours by location as outlined in Section J, Attachment C4 – LCAT Capacity Labor Hours.Section B |
| R88 | The Contractor must use the Government-provided "Not to Exceed" (NTE) values for Other Direct Costs (ODCs) as the capped total amounts. The Contractor is responsible for applying the applicable indirect burdens in accordance with their disclosed accounting practices to derive the allowable direct cost amounts such that, when the burdens are applied, the total does not exceed the NTE values established by the Government. If the Contractor chooses not to burden ODCs, then the Contractor must propose an H-clause (example provided below) to identify this special term and condition. No fee must be applied to ODCs.Section B |
Recent awards in NAICS 541330
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2028-12-18 | JOHNSON CONTROLS NAVY SYSTEMS, LLCDepartment of the Navy · HIGH EFFICIENCY SUPER CAPACITY CHILLER COMMON MODE VOLTAGE TESTING & MODELING | $5.63 million |
| 2027-09-22 | RS&H, INC.Department of the Army · 148TH AE - REPAIR PERIMETER ROAD - FMKM242006 | $89,851 |
| 2027-03-31 | NORTHROP GRUMMAN SYSTEMS CORPORATIONDepartment of the Air Force · LITENING F/A-18E/F SUPER HORNET INTEGRATION SUPPORT | $2.62 million |
| 2027-01-31 | ASRC FEDERAL PROFESSIONAL SERVICES, LLCDepartment of the Air Force · PROVIDE ALL LABOR NECESSARY FOR CYBER SECURITY AND INTEROPERABILITY SUPPORT | $42.06 million |
| 2026-12-31 | KBR WYLE SERVICES, LLCDepartment of the Air Force · THE CONTRACTOR WILL PROVIDE THE SPECIALIZED EXPERTISE, AGILE METHODOLOGIES, AND TECHNICAL SOLUTIONS NECESSARY TO ACCELERATE THE RESEARCH, DEVELOPMENT, ACQUISITION, AND SUSTAINMENT OF LONG-RANGE CAPABI | $1.89 million |
| 2026-12-31 | NORTHROP GRUMMAN SYSTEMS CORPORATIONDepartment of the Air Force · LITENING CATP USN FIELD SERVICE ENGINEERING (FSE) SUPPORT | $777,979 |
Source: USAspending.gov, retrieved 2026-11-11. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.