N0010427QK004 6135-01-646-5986 GWAX Sonar MK87 Mod 5: requirements and submission rules
14 requirements and 15 submission rules found in the solicitation documents for N0010427QK004. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Submit QA Inspection Plan to: Commanding Officer N0010427QK004 Page 13 of 70
- Government inspection and acceptance will be accomplished at the source.In addition to the government representative's normal inspection, the results of first articles, and production lot test samples submitted by the testing activity, shall also be used by the government representative in determining final acceptance of the material.
- It is to be submitted for approval no later than Days after First Article Test Approval, or days prior to delivery of first production lot if first articles 30 90 are waived.
- Submit QA System Manual to: Commanding Officer Naval Surface Warfare Center Panama City Division, Code A12 ATTN: Robert Bethea 110 Vernon Ave Panama City, FL 32407-7001 POC Information: See Section H A Quality Assurance Inspection Plan required is in accordance with DD 1423 sequence number ()A006 .
- For a commercial product or commercial service exception, the Offeror shall Commercial product or commercial service exception submit, at a minimum, information that is adequate for determining commerciality and evaluating the reasonableness of the price for this acquisition, including prices at which the same product or service or similar products or services have been sold in the commercial market.
- The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating Contracting Officer, and the activity below: A.
- A notice of conditional approval may state any further action required of the Contractor.In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, ) with all associated costs and expenses to be borne solely by the Contractor.A00 3 c.
- (e) If an offeror, manufacturer, source, product or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract.
- The Contractor shall search SAM for the FASC-maintained list of American Security Drone Act-covered foreign entities before Procedures proposing, or using in performance of the contract, any unmanned aircraft system.
- (ii) Unless an exception applies according to paragraph (d)(4)(iii) or the Government grants a waiver, contractor shall not export certain sensitive technology to Iran, as determined by the President, and has an active exclusion in SAM (22 U.S.C.
- (2) The Contractor shall search for the phrase "FASCSA order" in the System for Award Management (SAM) at https://www.sam.gov to locate applicable FASCSA orders.
- (2) If a report must be submitted to a contracting office, the Contractor shall submit the report as follows: (i) If a Department of Defense contracting office, the Contractor shall report to the website at https://dibnet.dod.mil.
- (ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
- (ii) For all other contracting offices, the Offeror shall submit the disclosure to the Contracting Officer.
- The Offeror shall review the list of excluded parties in the System for Award Management (SAM) () for Procedures https://www.sam.gov entities excluded from receiving federal awards for "covered defense telecommunications equipment or services".
Requirements
| ID | Requirement |
|---|---|
| R1 | Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter. |
| R2 | The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.Section B |
| R3 | Any Engineering Change Proposal (ECP) or Request for Variation (RFV) affecting an item being procured under this contract shall be in accordance with ANSI/EIA-649 ..Section C (statement of work) |
| R4 | Preservation, Packaging, and Packing shall be in accordance with all associated drawings and specification listed herein.Section D |
| R5 | Hazardous materials shall be offered for transportation in full compliance with Title 49 Code of Federal Regulations (49 CFR).Section D |
| R6 | Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendardays prior to the planned testing date.Section E |
| R7 | For each Production Lot, the manufacturer shall provide shall provide the following material certifications (as a minimum): Drawing Number: 8654059 Part Name:Polarity Ring, Stepped Certification Required: Acrylonitrile Butadiene Styrene (ABS), Color BlackSection E |
| R8 | The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, A001 ). The test plan shall be submitted within 60 calendar days after contract award date.Section E |
| R9 | Quality Assurance Inspection System to be in accordance with ISO 9001, ASQC Q9001 - 2008 or equivalent registration required.Section E |
| R10 | The Contractor shall comply with the higher-level quality standard(s) listed below. ISO-9001:2015Section E |
| R11 | If lithium cell other than Tadiran P/N TL-5903/S is used, Lithium Battery Safety Approval per S9310-AQ-SAF-010 is required prior to first articles.Section I (contract clauses) |
| R12 | The Contractor shall submit the first article test reports within 210 calendar days from the date of this contract to NAVSUP WSS Code N772.16 marked "First Article Test Report: Contract No. _______, Lot/Item No. _______"Section I (contract clauses) |
| R13 | All quotes must include the following: Standard Form 18 "Request for Quotation" with Blocks 13 and 14 completed by the offeror, Section B "Schedule of Supplies" completed by the offeror, and Section K "Representations, certifications, and other statements of offerors or respondents" completed by the offeror.Section L (instructions to offerors) |
| R14 | The Offeror shall provide, in the proposal, the CMMC unique identifier(s) (CMMC UIDs) issued by SPRS for each contractor information system that will process, store, or transmit FCI or CUI during performance of a contract, task order, or delivery order resulting from this solicitation.Section L (instructions to offerors) |
Recent awards in NAICS 335910
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-01 | FIRST LOGISTEX, INC.Department of the Army · THIS IS A SUPPLY CONTRACT TO PROVIDE INSTALLATION AND REMOVAL OF ABSOLYTE VLRA BATTERIES AT BUILDING #1014 | $31,388 |
| 2026-07-23 | GM DEFENSE LLCDefense Logistics Agency · 8512259443!BATTERY,STORAGE | $1,369 |
| 2026-07-23 | GM DEFENSE LLCDefense Logistics Agency · 8512259442!BATTERY,STORAGE | $1,369 |
| 2026-07-23 | GM DEFENSE LLCDefense Logistics Agency · 8512259189!BATTERY,STORAGE | $1,369 |
| 2026-07-23 | GM DEFENSE LLCDefense Logistics Agency · 8512259187!BATTERY,STORAGE | $1,369 |
| 2026-07-23 | GM DEFENSE LLCDefense Logistics Agency · 8512259185!BATTERY,STORAGE | $1,369 |
Source: USAspending.gov, retrieved 2026-10-29. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.