3HD 5365 017330818 D5, BUSHING SLEEVE: requirements and submission rules
104 requirements and 0 submission rules found in the solicitation documents for N00104-26-Q-FD65. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. |
| R2 | All contract documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. |
| R3 | Submission of all certification data CDRLS 20 days prior to delivery. |
| R4 | PNSY review/acceptance of certification CDRLS 18 working days after receipt |
| R5 | Final delivery of material (200 days) |
| R6 | Drawings associated with this solicitation will be made available on the new beta.SAM website, but will be restricted access which needs to be approved. |
| R7 | Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. |
| R8 | The administrative contracting officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action. |
| R9 | Inquiries and correspondence directed to the Post Award PCO should be addressed as follows: Code: (<N743.35>) Weapon System LRC: (<WWJ>) |
| R10 | FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation and required offerors to--(1) identify any hazardous material... and (2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified. |
| R11 | Failure to provide the required information and documentation may render you ineligible for award. |
| R12 | If you have questions about whether a solicited item is classified as hazardous, contact the NAVSUP WSS HAZMAT point of contact |
| R13 | The bearing, sleeve must be manufactured in accordance with NAVSEA drawing 5486623, Item 83, except as simplified or modified herein. |
| R14 | Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part --- <Bearing Sleeve> Material - <ASTM-B139, Alloy C51000 TEMPER H04> |
| R15 | O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. |
| R16 | When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. |
| R17 | Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. |
| R18 | Repairs that would exceed these limits require approval (including final dimensions). |
| R19 | The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. |
| R20 | The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ |
| R21 | The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract completely comply with the requirements of the procedure document, including any/all invoked specifications and drawings. |
| R22 | When welding, brazing, and alloyed processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AQ-GIB-010/248, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. |
| R23 | For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. |
| R24 | Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. |
| R25 | The Contractor must maintain the total equipment baseline configuration. |
| R26 | For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. |
| R27 | All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. |
| R28 | Waivers and Deviations must be designated as Critical, Major, or Minor. |
| R29 | The Contractor must provide a copy of this request to the QAR. |
| R30 | Requests must include the information listed below: a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. |
| R31 | b. Number of units (and serial/lot numbers) to be delivered in this configuration. |
| R32 | c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. |
| R33 | d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. |
| R34 | All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. |
| R35 | The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the equipment and its sub-assemblies. |
| R36 | The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the equipment covered by this contract. |
| R37 | ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. |
| R38 | b. A complete description of the change to be made and the need for that change. |
| R39 | c. A complete listing of other configuration items impacted by the proposed change and a description of the impact on those CI's. |
| R40 | d. Proposed changes to documents controlled by the Government. |
| R41 | e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. |
| R42 | f. Recommendations about the way a retrofit should be accomplished. |
| R43 | g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. |
| R44 | h. Impacts to the operational use of the product. |
| R45 | i. Complete estimated life-cycle cost impact of the proposed change. |
| R46 | j. Milestones relating to the processing and implementation of the engineering change. |
| R47 | A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). |
| R48 | Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. |
| R49 | Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. |
| R50 | The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. |
| R51 | The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. |
| R52 | The Prime Contractor must, upon notification, make his facilities available for audit by the contracting officer or his authorized representative. |
| R53 | All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. |
| R54 | This contract provides for the performance of Government Quality Assurance at source. |
| R55 | The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. |
| R56 | Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. |
| R57 | Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. |
| R58 | Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. |
| R59 | The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. |
| R60 | The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. |
| R61 | All documents and reference data applicable to this contract must be available for review by the Government representative. |
| R62 | Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. |
| R63 | Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. |
| R64 | When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant." |
| R65 | Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: Visual examination upon receipt to detect damage during transit. |
| R66 | Inspection for completeness and proper type. |
| R67 | Verification of material quality received. |
| R68 | Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. |
| R69 | Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. |
| R70 | Identification and protection from improper use or disposition. |
| R71 | Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. |
| R72 | For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of failed Government material. |
| R73 | Material returned to the contractor must be handled as GFM. |
| R74 | Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. |
| R75 | In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. |
| R76 | Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). |
| R77 | If the Contractor's qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. |
| R78 | Prior approval does not guarantee acceptance for this or any future contracts. |
| R79 | A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) |
| R80 | b) Specification and Type |
| R81 | c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. |
| R82 | d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. |
| R83 | Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). |
| R84 | The material certification test report must completely and accurately reflect that the material supplied meets the specified requirements. |
| R85 | The following provisions provide the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. |
| R86 | The Contractor must develop written procedures that implement the material control requirements stated herein, within DI-MISC-81020, and elsewhere in this contract/purchase order. |
| R87 | Material Traceability - Material traceability codes must be permanently applied to the material and annotated on test reports for each individual heat/heat treatment of material supplied. |
| R88 | Traceability marking must either be heat/lot number, a unique vendor traceability number/code, or a combination thereof to maintain complete traceability to certification OQE. |
| R89 | Procurement/Receipt Inspections - Purchase orders for raw material must specify that the material be traceable to material certification test ports by traceability codes that are marked on the material and identified on the test reports. |
| R90 | Receiving Inspection must include as a minimum - Verification that the traceability number marked on the material agrees with that on the certification test reports. |
| R91 | Verification that certification test reports are eligible and complete. |
| R92 | Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. |
| R93 | Material Handling - All raw materials must be marked with a unique traceability number (except as specified below). |
| R94 | Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. |
| R95 | Final Inspection - The following inspection must be performed prior to shipping material. |
| R96 | Material Sampling - Material must be inspected for form, fit, and function. |
| R97 | Lot acceptance must be based on zero defects and lot rejection based on one defect. |
| R98 | Material Certification Data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. |
| R99 | Statements on material certification documents must be positive and unqualified. |
| R100 | Material Marking for Traceability and Identification - The following are the minimum marking requirements. |
| R101 | All traceability marking must be permanently applied in accordance with MIL-STD-792 (except as specified below). |
| R102 | Traceability markings must be legible and must be located so as not to affect the form, fit, and function of the material. |
| R103 | Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. |
| R104 | See CDRL DI-QIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current quality system procedures to the Procuring Contracting Office (PCO) prior to award of any contract/purchase order. |
Recent awards in NAICS 332119
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-07-23 | ECHELON SUPPLY AND SERVICE, INC.Defense Logistics Agency · 8512259842!BUSHING,SLEEVE | $4,227 |
| 2026-07-23 | ADIRONDACK ELECTRONICS INCDepartment of the Navy · PINION SHAFT SHIMS | $843 |
| 2026-07-22 | KAMPI COMPONENTS CO INCDefense Logistics Agency · 8512253584!KNOB | $4,024 |
| 2026-07-22 | PIONEER INDUSTRIES, LLCDefense Logistics Agency · 8512208810!LOCK,SHAFT | $2,283 |
| 2026-07-22 | SALEM MANUFACTURING & SALES INCDefense Logistics Agency · 8512256375!SPACER,PLATE | $2,268 |
| 2026-07-22 | LARKOS PACKING AND DISTRIBUTION INC.Defense Logistics Agency · 8512254848!SPACER,SLEEVE | $183 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.