1HM 5365 016439960 D4, SHIM: requirements and submission rules

44 requirements and 0 submission rules found in the solicitation documents for N00104-26-Q-FD59. Use them as the start of your compliance matrix.

Solicitation number
N00104-26-Q-FD59
Agency
DEPT OF DEFENSE / DEPT OF THE NAVY / NAVSUP / NAVSUP WEAPON SYSTEMS SUPPORT / NAVSUP WSS MECHANICSBURG / NAVSUP WEAPON SYSTEMS SUPPORT MECH
NAICS
332119
Set-aside
Small Business Set Aside - Total
Responses due
12 January 2027 (45 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • None detected automatically: read the instructions to offerors.

Requirements

IDRequirement
R1Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request.
R2FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation and required offerors to-- (1) identify any hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and (2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified.
R3"Document References" listed below must be obtained by the Contractor.
R4The Shim must be manufactured in accordance with NAVSEA Drawing number 7108111 item 15 and all invoked DRNs and liabilities, except as amplified or modified herein.
R5Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
R6The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
R7All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.
R8All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail.
R9The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change.
R10A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s).
R11The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings.
R12The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
R13The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative.
R14All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement.
R15The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office.
R16Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption.
R17The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate.
R18The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition.
R19All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative.
R20Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately."
R21When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.8.1 Visual examination upon receipt to detect damage during transit. 3.8.2 Inspection for completeness and proper type. 3.8.3 Verification of material quality received. 3.8.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.8.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.8.6 Identification and protection from improper use or disposition. 3.8.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use.
R22For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained.
R23Material returned to the contractor must be handled as GFM.
R24Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
R25When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process.
R26The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
R27The following inspections must be performed prior to Government inspection and acceptance. 3.11.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
R28All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility.
R29When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
R30The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The contract/purchase order number (i.e. N00104-11-P-FA12). 3. The national stock number (NSN). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 5. Cure date ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement for any Hull, Mechanical and Electrical (HM&E) testing required that include the name of the test and that it was performed satisfactorily. If no HM&E testing is required, the statement should read "Hull, Mechanical and Electrical (HM&E) testing N/A." 9. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements. 10. Contractor's or authorized personnel's signature.
R31In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
R32ECPs must be prepared in accordance with DI-SESS-80639E, Engineering Change Proposal (ECP). NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
R33The Contractor must coordinate with the cognizant SYSCOM Program Office prior to any Class I ECP submission. The Contractor must notify the Procurement Contracting Officer (PCO) of any pending or approved Class I engineering changes with another Government activity that the Contractor proposes to incorporate under this contract. The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
R34On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit the Class II (Minor) change to the PCO for approval or disapproval. Class II changes must be made at no additional cost to the Government.
R35The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Variance requests must be prepared in accordance with DI-SESS-80640E - Request for Variance (RFV). NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
R36The Contractor must submit all critical/major variance requests via DCMA or SUPSHIP and the PCO, to the SYSCOM Program Office or their delegated representative, for approval or disapproval.
R37On Navy Special Emphasis Program contracts/purchase orders, the Contractor must submit minor variance requests via DCMA or SUPSHIP and the PCO, to the SYSCOM Program Office or their delegated representative, for approval or disapproval.
R38Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
R39The Contractor shall deliver all items under a contract line, subline, or exhibit line item.
R40The unique item identifier assignment and its component data element combination shall not be duplicated on any other item marked or registered in the DoD Item Unique Identification Registry by the contractor.
R41The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022, Information technology - International symbology specification - Data matrix; ECC200 data matrix specification.
R42The Contractor shall ensure that-- (i) The data elements (except issuing agency code) of the unique item identifier are encoded within the data matrix symbol that is marked on the item using one of the following three types of data qualifiers, as determined by the Contractor: (A) Application Identifiers (AIs)... (B) Data Identifiers (DIs)... (C) Text Element Identifiers (TEIs)...; and (ii) The encoded data elements of the unique item identifier conform to the transfer structure, syntax, and coding of messages and data formats specified for Format Indicators 05, 06, and 12 in ISO/IEC International Standard 15434...
R43The Contractor shall-- (A) Determine whether to-- (1) Serialize within the enterprise identifier; (2) Serialize within the part, lot, or batch number; or (3) Use a DoD recognized unique identification equivalent...; and (B) Place the data elements of the unique item identifier... on items requiring marking by paragraph (c)(1) of this clause, based on the criteria provided in MIL-STD-130, Identification Marking of U.S. Military Property, latest version; (C) Label shipments, storage containers and packages that contain uniquely identified items in accordance with the requirements of MIL-STD-129, Military Marking for Shipment and Storage, latest version; and (D) Verify that the marks on items and labels on shipments, storage containers, and packages are machine readable and conform to the applicable standards. The contractor shall use an automatic identification technology device for this verification that has been programmed to the requirements of Appendix A, MIL-STD-130, latest version.
R44The issuing agency code-- (A) Shall not be placed on the item; and (B) Shall be derived from the data qualifier for the enterprise identifier.

Recent awards in NAICS 332119

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-08-19GOVPARTS LLCDefense Logistics Agency · 8512317036!BUSHING,SLEEVE$2,242
2026-08-13LARKOS PACKING AND DISTRIBUTION INC.Defense Logistics Agency · 8512299997!RING,RETAINING$116
2026-08-12MELTON SALES & SERVICEDefense Logistics Agency · 8512302147!BUSHING,SLEEVE$144
2026-08-12KAMPI COMPONENTS CO INCDefense Logistics Agency · 8512302040!SPACER,PLATE$505
2026-08-12IMPACT MACHINE LLCDefense Logistics Agency · 8512299954!SPACER,SLEEVE$1,579
2026-08-11BASIC RUBBER AND PLASTICS CO.Defense Logistics Agency · 8512295940!BUSHING,NONMETALLIC$1,390

Source: USAspending.gov, retrieved 2026-11-21. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.