1HM 5305 016429505 D4, SCREW,CAP,SOCKET HE: requirements and submission rules
24 requirements and 0 submission rules found in the solicitation documents for N00104-26-Q-FD54. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- None detected automatically: read the instructions to offerors.
Requirements
| ID | Requirement |
|---|---|
| R1 | Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. |
| R2 | FAR clause 52.223-3, Hazardous Material Identification and Material Safety Data, is incorporated by reference in Section I in this solicitation ad required offerors to-- (1) identify any hazardous material (defined in FED STD 313 as an item or chemical which is a "health or physical hazard" per OSHA in 29 CFR 1910.1200) that will be delivered under a resultant contract, and (2) provide a Material Safety Data Sheet meeting OSHA/FED STD 313 requirements for all hazardous material identified. |
| R3 | This <Screw, Cap, Self-Locking> contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. |
| R4 | Use of any material other than that specified requires special engineering approval and may require testing. |
| R5 | <The Self-Locking Cap Screw must be in accordance with FF-S-86, Type VI, CRES, Size 0.250-20UNRC-3A X 0.625, except as amplified or modified herein.> |
| R6 | <Self-Locking element is required and is to be in accordance with MIL-DTL-18240.> |
| R7 | Self-Locking screws must be marked with six dots. Where no contract invoked specification or drawing requirement exists for this marking, self-locking fasteners must be marked with six dots approximately .032" diameter, raised or depressed by approximately .010" located on the top perimeter of the head of the fastener in an arc or circular pattern. The six dots must be distinguishable from all other markings. |
| R8 | A wedge tensile test must be conducted on a Full Size Fastener for each production lot. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. |
| R9 | Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. |
| R10 | Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. |
| R11 | The Contractor must maintain the total equipment baseline configuration. |
| R12 | All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. |
| R13 | All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. |
| R14 | The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. |
| R15 | The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. |
| R16 | The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. |
| R17 | The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. |
| R18 | All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. |
| R19 | Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. |
| R20 | The Contractor must maintain adequate records of all inspections and tests. |
| R21 | Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. |
| R22 | The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the specified information. |
| R23 | The Contractor shall deliver all items under a contract line, subline, or exhibit line item. |
| R24 | The Contractor shall provide a unique item identifier for delivered items. |
Recent awards in NAICS 332722
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-08-19 | CHAND, L.L.C.Defense Logistics Agency · 8512316816!NUT,PLAIN,HEXAGON | $8,900 |
| 2026-08-19 | MIDWAY INDUSTRIAL SUPPLY INC.Defense Logistics Agency · 8512313657!GASKET | $2,664 |
| 2026-08-19 | ALL-SYSTEM AEROSPACE INTERNATIONAL, INC.Defense Logistics Agency · 8512319029!COVER,ACCESS | $1,663 |
| 2026-08-18 | AMAFHA ENTERPRISE INCDefense Logistics Agency · 8512316706!SCREW,MACHINE | $785 |
| 2026-08-18 | SMALL PARTS INCDefense Logistics Agency · 8512313706!SCREW,CAP,HEXAGON HEAD | $2,536 |
| 2026-08-18 | PATTERSON COONEY INCDefense Logistics Agency · 8512316678!GASKET AND PREFORMED PACKING | $682 |
Source: USAspending.gov, retrieved 2026-11-21. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.