Prototype Stripline Kickers: requirements and submission rules

62 requirements and 3 submission rules found in the solicitation documents for MB483335. Use them as the start of your compliance matrix.

Solicitation number
MB483335
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / BROOKHAVEN NATL LAB -DOE CONTRACTOR
NAICS
335999
Set-aside
No Set aside used
Responses due
04 December 2026 (6 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Any proposed geometry modification resulting from RF testing shall be submitted to BSA for approval before implementation in the prototype design.
  • Test procedures and acceptance criteria shall be submitted to BSA for review before formal acceptance testing.
  • Any nonconformance, deviation, repair, or proposed design change that affects fit, function, RF performance, UHV performance, cooling, materials, or interfaces shall be documented and submitted to BSA for disposition before use or incorporation.

Requirements

IDRequirement
R1All work shall be conducted in strict accordance with the attached BSA Statement of Work EIC-INS-SOW-017 dated 8/31/2026, Specification No. EIC-INS-SPC-010 dated 8/31/2026.
R2The Contractor shall provide the Deliverables defined in Attachment 1 - Statement of Work EIC-INS-SOW-017 in the sequence defined and by the end of the duration period for each.
R3The Contractor agrees to assign such employee(s) or person(s) to the performance of the work under this Contract and shall not reassign or remove the above individual(s) without written justification and prior approval of the BSA Contractual Representative.
R4Invoices shall be directed to BSA’s Accounts Payable Department via electronic or regular mail.
R5The Contractor shall make every effort to have systems in place that allow for electronic invoice transmittal. Invoices shall be submitted in PDF format, via email, to apinvoices@bnl.gov.
R6The Contractor shall indicate the final invoice by clearly marking such invoice as “FINAL.” A copy of the final invoice must be submitted to BSA’s Contractual Representative.
R7All shipments must comply with the following labelling requirements. Failure to do so may result in delayed payments. Labels must be placed on the upper left portion of the container when possible and contain: Brookhaven National Laboratory, Brookhaven’s Contract Number, 98 Rochester St., Upton, NY 11973, Box Number / Number of Boxes.
R8Every shipping container must include a packing list. The packing list must be clearly identified and affixed to a side of the shipping container. At a minimum, the packing list should contain the following information: Ship from company name and address; Supplier contact name; Supplier telephone number; Ship to address as instructed by Buyer/Contracts Specialist; Brookhaven’s Contract number; Part number, description, quantity, unit of measure, and corresponding BNL Contract line number.
R9If a shipment is heavier than 3,000 lbs., longer than 8 feet in any direction, or has a high center of gravity, it will require rigging upon receipt and the shipper shall provide a minimum of 3 days’ advance notice of delivery to BNL’s Receiving Department via email to WarehouseOperations@bnl.gov. The shipper must obtain acknowledgement from BNL that delivery notification was received.
R10Each shipping container (transport package) with a gross weight equal to or greater than 400 lbs. (180 kilograms) must be marked with the center of gravity location and gross weight on at least one side or end panel. It must also meet the requirements of the latest revision of ASTM Standard D 3951, Standard Practice for Commercial Packaging.
R11The Contractor shall employ procedures which ensure adequate protection of material and equipment during shipment and while in storage. Such protection shall include special environmental packaging as necessary. All items shipped (originally packaged or repackaged) to BNL or other locations cited in the PO or Contract shall comply with the requirements for preservation, packaging, and marking as stated in the latest revision of ASTM Standard D 3951-10, Standard Practice for Commercial Packaging.
R12Do not use vermiculite as a packaging material inside any shipments to BNL unless required by shipping regulation. Vermiculite used as a packaging material in shipments must be determined to be free of asbestos (<1% chrysolite, amosite, crocidolite, tremolite, anthophyllite, and actinolite). All shipments containing vermiculite must be accompanied by documentation stating that the vermiculite used is certified asbestos-free. This documentation must be affixed to the outside of the package.
R13Shipments to Brookhaven National Laboratory (BNL) containing radioactive material require pre-authorization prior to shipment. Contact the following staff in the Packaging & Transportation Group for instructions: Brett Fagan, Ext. 5645, bfagan@bnl.gov; Kenneth Hansen, khansen2@bnl.gov; Steven Woodburn, Ext. 3271, woodburn@bnl.gov.
R14Foreign shipments transported via ocean freight must use the 10+2 REQUIREMENTS Form (PDF). The form must be completed by the Contractor 72 hours before departure of the vessel.
R15It is the Contractor's responsibility to make sure the 10+2 form is submitted 72 hours prior to the vessel sailing.
R16Any change or modification in the terms and conditions of this Contract shall require the written approval of BSA's Contractual Representative or designee.
R17Should you accept this Contract without exception or alteration, a copy of the Contract shall be returned to BSA's Contractual Representative. Should you take any exceptions or attempt to alter the Contract in any manner, BSA’s execution thereof shall be null and void. Should you wish to take exception(s)/alteration(s), you shall notify BSA’s Contractual Representative.
R18In the event of a conflict between the applicable documents and this specification, the Contractor shall immediately notify the BSA Contractual Representative.
R19The Contractor shall use only the latest BSA-approved geometry/model revision identified in the solicitation/PO or subsequently approved in writing for fabrication or analysis.
R20ASME Y14.5-2018, Dimensioning and Tolerancing, shall apply to engineering drawings unless otherwise specified by BSA.
R21Applicable BNL/EIC ESR vacuum, cleanliness, quality assurance, environment, safety and health, brazing, and material-control requirements shall apply when invoked by the contract, purchase order, approved drawings, or BSA procedures.
R22All dimensions, tolerances, materials, and internal geometric details of the kicker body, stripline electrodes, cooling bars, flex-couplings, and coaxial feedthrough interfaces shall conform to the BSA-approved STEP geometry and construction drawings. No change to geometry, material, or functional interface shall be made without prior written BSA approval.
R23The longitudinal wake potential and loss factor shall be kept reasonably low for Gaussian bunches with length σz = 7 mm and beam current up to 2.5 A and shall be approved by BSA prior to final acceptance.
R24All internal geometric dimensions, including kicker-body pockets and bores, stripline electrode geometry, cooling bars, flex-couplings, and coaxial feedthrough connections, shall follow the dimensions extracted from the BSA-approved STEP geometry.
R25The Contractor shall establish a complete set of detailed construction drawings for all individual parts and assemblies based on the BSA-provided geometry and viable UHV brazing and assembly procedures.
R26Mechanical tolerances shall be established using RF measurement results from the short stripline mockup and, where applicable, from the prototype. Final fabrication tolerances shall be documented on drawings and approved by BSA before production of the prototype hardware.
R27The design shall preserve the intended TEM-field geometry and shall not incorporate passive thermal features or geometric modifications that compromise beam/signal velocity matching or characteristic impedance without BSA approval.
R28The design shall provide practical assembly, brazing, cooling, and feedthrough interfaces while maintaining the approved RF geometry.
R29All materials used in the kicker shall withstand the total integrated radiation dose expected in the ESR injection area over a 10-year EIC operating period. The required TID value will be provided by BSA.
R30Where used to improve radiative heat transfer, copper surfaces shall be blackened with a high-emissivity CuO layer of nominally a few micrometers thickness. The coating process, thickness range, and areas to be treated shall be submitted for BSA approval and shall be compatible with the applicable UHV cleanliness requirements.
R31The feedthrough shall be a UHV-compatible, industry-manufactured unit, such as a Kyocera water-cooled EIA 7/8-inch feedthrough or BSA-approved equivalent, with vacuum-side modifications as required by the approved geometry.
R32The RF interface shall be flange-mounted EIA 7/8-inch coaxial with nominal characteristic impedance of 50 Ω.
R33The feedthrough return loss shall be at least 30 dB over the principal operating range from DC to 2 GHz, unless a different BSA-approved acceptance limit is established by prototype testing.
R34The feedthrough shall withstand 30 kV for an 8 ns pulse at a repetition rate of 1 Hz. The maximum electric surface field shall not exceed 20 MV/m in the approved design.
R35External water cooling of the feedthrough shall be provided if required by thermal analysis or component rating.
R36Active cooling is required for the kicker body and stripline electrodes. A liquid-cooling approach shall be the primary cooling method. Reasonable liquid-cooling design options shall be evaluated before alternative cooling approaches are considered.
R37The kicker body shall be actively water cooled.
R38Each stripline shall be actively liquid cooled using BestSolv Zulu or BSA-approved equivalent. Cooling shall be provided through a cooling bar brazed to the back of the stripline and supplied through a ceramic tube spacer from the center of the kicker, consistent with the approved STEP geometry.
R39The Contractor shall perform a thermal analysis using proposed coolant properties, flow rates, heat-transfer coefficients, boundary conditions, and the design loads specified above. The analysis shall demonstrate acceptable component temperatures and thermal deformation without compromising RF geometry or UHV performance.
R40A simplified, shortened stripline RF mockup shall be fabricated prior to prototype manufacture to verify the kicker-body/stripline geometry, dimensions, characteristic impedance, and coaxial-port transitions.
R41The mockup shall be characterized using a two-port VNA, including S-parameter measurements and TDR. Results shall be used to validate or refine the mechanical tolerances and, if required, the BSA-provided geometry.
R42The completed prototype shall undergo an in-depth RF/electrical characterization in collaboration with BSA, including VNA/TDR measurements and stretched-wire measurements as applicable.
R43The completed stripline kicker shall satisfy EIC ESR UHV and cleanliness requirements.
R44All vacuum-facing materials, brazes, coatings, cleaning processes, handling methods, and assembly procedures shall be compatible with the applicable BSA/EIC UHV requirements.
R45The Contractor shall develop detailed fabrication, brazing, assembly, and inspection procedures suitable for the UHV kicker construction.
R46The Contractor shall maintain the BSA-approved geometry during all manufacturing operations, including brazing, coating, cooling-bar attachment, and feedthrough integration.
R47Manufacturing drawings shall identify materials, dimensions, tolerances, surface requirements, inspection points, brazing/assembly requirements, and configuration/revision status.
R48No substitutions of materials, feedthroughs, coolants, coatings, or geometry shall be made without prior BSA approval.
R49Fabricate the shortened brass half-stripline RF mockup defined by the BSA-provided STEP model. The mockup has no vacuum or cooling requirement.
R50Perform 2-port VNA S-parameter and TDR measurements in collaboration with BSA. To meet the odd-mode characteristic impedance boundary conditions, a simple metal plate need to be added as symmetry ground-plane, made of brass or aluminum, covering the mockup structure.
R51Demonstrate that the measured impedance behavior and transitions are consistent with the intended nominal 50 Ω system and support the selected construction tolerances.
R52Perform VNA/TDR characterization of the completed prototype and compare results with the approved model and mockup measurements.
R53Perform differential stretched-wire RF measurements in collaboration with BSA to characterize the beam-coupling/wake behavior.
R54Document all RF results, observed resonances/mismatches, and any corrective actions.
R55Perform cooling tests of the kicker body and stripline circuits using the approved coolant(s), flow conditions, and instrumentation.
R56Demonstrate consistency with the approved thermal model and stable cooling operation at representative or conservatively equivalent heat loads.
R57The completed prototype shall undergo vacuum certification consistent with the applicable EIC ESR UHV requirements.
R58The Contractor shall maintain configuration control of BSA-provided models, Contractor drawings, material selections, procedures, and test configurations.
R59The Contractor shall provide the following required documentation: Thermal analysis report; Complete detailed construction drawings for all parts and assemblies; RF mockup fabrication drawings and VNA/TDR test report; Feedthrough quotation/specification and technical data for the proposed water-cooled UHV EIA 7/8-inch feedthrough; Prototype fabrication, brazing, assembly, cleaning, and inspection procedures; Prototype RF characterization report; Cooling test report and comparison to the thermal analysis; Vacuum certification report; As-built drawings and CAD/CAE models reflecting all approved changes; Design Review Documentation Package required by the SOW; Material certifications, process certifications, inspection records, nonconformance dispositions, and other quality records required by the contract or BNL-QA-101.
R60All documentation shall be in English and shall be provided electronically using a BSA-identified secure file-transfer location, shared network folder, or other approved data-transfer method. Reports shall include sufficient technical detail for independent review. Equations shall define variables and show values used; diagrams and figures shall use labels consistent with the design drawings.
R61Manufacturing drawings and CAD/CAE data shall be provided in BSA-acceptable native and/or exchange formats, including as applicable ACIS SAT/SAP, STEP, IGES, STL, or input files for widely used CAD/CAE tools such as CATIA, SolidWorks, Autodesk, Solid Edge, HFSS, CST Studio, AWR, or ADS.
R62Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN. Caution: If you don’t return Form W-9 to the requester with a TIN, you might be subject to backup withholding.Section I (contract clauses)

Recent awards in NAICS 335999

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-10UNITED SALES ASSOC INCDepartment of Energy · RECTIFIER MODULES FOR WESTERN AREA POWER ADMINISTRATION, ROCKY MOUNTAIN REGION$24,118
2026-06-18UNITED SALES ASSOC INCDepartment of Energy · NDMO COMM BATTERY CHARGER REPLACEMENTS, EO 14398$51,436
2026-06-03FED CREW INCDepartment of Energy · PURCHASE ORDER FOR BATTERY CHARGER EQUIPMENT, WESTERN AREA POWER ADMINISTRATION, UPPER GREAT PLAINS REGION$59,036
2026-05-21BENNETT-ALVARADO, INC.Department of Energy · MITSUBISHI TANK HEATERS FOR SOUTH DAKOTA MAINTENANCE OFFICE LOCATED IN HURON, SD$36,282
2026-05-04RURAL ELECTRIC SUPPLY COOPERATIVEDepartment of Energy · LINE HARDWARE AND WIRE FOR UGP NDMO$88,692
2025-09-27MARY HELEN PARKEYDepartment of Energy · HIGH VOLTAGE SWITCHYARD EQUIPMENT$1.88 million

Source: USAspending.gov, retrieved 2026-10-31. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.