Prototype Stripline Kickers: requirements and submission rules
51 requirements and 3 submission rules found in the solicitation documents for MB483335. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Any proposed geometry modification resulting from RF testing shall be submitted to BSA for approval before implementation in the prototype design.
- Test procedures and acceptance criteria shall be submitted to BSA for review before formal acceptance testing.
- Any nonconformance, deviation, repair, or proposed design change that affects fit, function, RF performance, UHV performance, cooling, materials, or interfaces shall be documented and submitted to BSA for disposition before use or incorporation.
Requirements
| ID | Requirement |
|---|---|
| R1 | All work shall be conducted in strict accordance with the attached BSA Statement of Work EIC-INS-SOW-017 dated 8/31/2026, Specification No. EIC-INS-SPC-010 dated 8/31/2026. |
| R2 | The Contractor shall provide the Deliverables defined in Attachment 1 - Statement of Work EIC-INS-SOW-017 in the sequence defined and by the end of the duration period for each. |
| R3 | The Contractor agrees to assign such employee(s) or person( s) to the performance of the work under this C ontract and shall not reassign or remove the above individual(s) without written justification and prior approval of the BSA Contractual Representative. |
| R4 | The Contractor shall make every effort to have systems in place that allow for electronic invoice transmittal. |
| R5 | Invoices shall be submitted in PDF format, via email, to apinvoices@bnl.gov. |
| R6 | The Contractor shall indicate the final invoice by clearly marking such invoice as “FINAL.” A copy of the final invoice must be submitted to BSA’s Contractual Representative. |
| R7 | All shipments must comply with the following labelling requirements. Failure to do so may result in delayed payments. Labels must be placed on the upper left portion of the container when possible and contain: Brookhaven National Laboratory, Brookhaven’s Contract Number, 98 Rochester St., Upton, NY 11973, Box Number / Number of Boxes |
| R8 | Every shipping container must include a packing list. The packing list must be clearly identified and affixed to a side of the shipping container. At a minimum, the packing list should contain the following information: • Ship from company name and address • Supplier contact name • Supplier telephone number • Ship to address as instructed by Buyer/Contracts Specialist • Brookhaven’s Contract number • Part number, description, quantity, unit of measure, and corresponding BNL Contract line number |
| R9 | If a shipment is heavier than 3,000 lbs., longer than 8 feet in any direction, or has a high center of gravity, it will require rigging upon receipt and the shipper shall provide a minimum of 3 days’ advance notice of delivery to BNL’s Receiving Department via email to WarehouseOperations@bnl.gov. The shipper must obtain acknowledgement from BNL that delivery notification was received. |
| R10 | Each shipping container (transport package) with a gross weight equal to or greater than 400 lbs. (180 kilograms) must be marked with the center of gravity location and gross weight on at least one side or end panel. It must also meet the requirements of the latest revision of ASTM Standard D 3951, Standard Practice for Commercial Packaging. |
| R11 | The Contractor shall employ procedures which ensure adequate protection of material and equipment during shipment and while in storage. Such protection shall include special environmental packaging as necessary. All items shipped (originally packaged or repackaged) to BNL or other locations cited in the PO or Contract shall comply with the requirements for preservation, packaging, and marking as stated in the latest revision of ASTM Standard D 3951-10, Standard Practice for Commercial Packaging. |
| R12 | Do not use vermiculite as a packaging material inside any shipments to BNL unless required by shipping regulation. Vermiculite used as a packaging material in shipments must be determined to be free of asbestos (<1% chrysolite, amosite, crocidolite, tremolite, anthophyllite, and actinolite). All shipments containing vermiculite must be accompanied by documentation stating that the vermiculite used is certified asbestos-free. This documentation must be affixed to the outside of the package. |
| R13 | Shipments to Brookhaven National Laboratory (BNL) containing radioactive material require pre-authorization prior to shipment. Contact the following staff in the Packaging & Transportation Group for instructions: • Brett Fagan, Ext. 5645, bfagan@bnl.gov • Kenneth Hansen, khansen2@bnl.gov • Steven Woodburn, Ext. 3271, woodburn@bnl.gov |
| R14 | Foreign shipments transported via ocean freight must use the 10+2 REQUIREMENTS Form (PDF). The form must be completed by the Contractor 72 hours before departure of the vessel. |
| R15 | Should you accept this Contract without exception or alteration, a copy of the Contract shall be returned to BSA's Contractual Representative. Should you take any exceptions or attempt to alter the Contract in any manner, BSA’s execution thereof shall be null and void. Should you wish to take exception(s)/alteration(s), you shall notify BSA ’s Contractual Representative. |
| R16 | In the event of a conflict between the applicable documents and this specification, the Contractor shall immediately notify the BSA Contractual Representative. |
| R17 | The Contractor shall use only the latest BSA -approved geometry/model revision identified in the solicitation/PO or subsequently approved in writing for fabrication or analysis. |
| R18 | All dimensions, tolerances, materials, and internal geometric details of the kicker body, stripline electrodes, cooling bars, flex -couplings, and coaxial feedthrough interfaces shall conform to the BSA -approved STEP geometry and construction drawings. No change to geometry, material, or functional interface shall be made without prior written BSA approval. |
| R19 | The longitudinal wake potential and loss factor shall be kept reasonably low for Gaussian bunches with length σz = 7 mm and beam current up to 2.5 A and shall be approved by BSA prior to final acceptance. |
| R20 | All internal geometric dimensions, including kicker -body pockets and bores, stripline electrode geometry, cooling bars, flex -couplings, and coaxial feedthrough connections, shall follow the dimensions extracted from the BSA approved STEP geometry. |
| R21 | The Contractor shall establish a complete set of detailed construction drawings for all individual parts and assemblies based on the BSA-provided geometry and viable UHV brazing and assembly procedures. |
| R22 | Mechanical tolerances shall be established using RF measurement results from the short stripline mockup and, where applicable, from the prototype. Final fabrication tolerances shall be documented on drawings and approved by BSA before production of the prototype hardware. |
| R23 | The design shall preserve the intended TEM -field geometry and shall not incorporate passive thermal features or geometric modifications that compromise beam/signal velocity matching or characteristic impedance without BSA approval. |
| R24 | All materials used in the kicker shall withstand the total integrated radiation dose expected in the ESR injection area over a 10-year EIC operating period. The required TID value will be provided by BSA. |
| R25 | Where used to improve radiative heat transfer, copper surfaces shall be blackened with a high- emissivity CuO layer of nominally a few micrometers thickness. The coating process, thickness range, and areas to be treated shall be submitted for BSA approval and shall be compatible with the applicable UHV cleanliness requirements. |
| R26 | The feedthrough shall be a UHV-compatible, industry-manufactured unit, such as a Kyocera water-cooled EIA 7/8-inch feedthrough or BSA -approved equivalent, with vacuum -side modifications as required by the approved geometry. |
| R27 | The RF interface shall be flange-mounted EIA 7/8-inch coaxial with nominal characteristic impedance of 50 Ω. |
| R28 | The feedthrough return loss shall be at least 30 dB over the principal operating range from DC to 2 GHz, unless a different BSA-approved acceptance limit is established by prototype testing. |
| R29 | The feedthrough shall withstand 30 kV for an 8 ns pulse at a repetition rate of 1 Hz. The maximum electric surface field shall not exceed 20 MV/m in the approved design. |
| R30 | External water cooling of the feedthrough shall be provided if required by thermal analysis or component rating. |
| R31 | Active cooling is required for the kicker body and stripline electrodes. A liquid-cooling approach shall be the primary cooling method. Reasonable liquid- cooling design options shall be evaluated before alternative cooling approaches are considered. |
| R32 | The kicker body shall be actively water cooled. |
| R33 | Each stripline shall be actively liquid cooled using BestSolv Zulu or BSA -approved equivalent. Cooling shall be provided through a cooling bar brazed to the back of the stripline and supplied through a ceramic tube spacer from the center of the kicker, consistent with the approved STEP geometry. |
| R34 | The Contractor shall perform a thermal analysis using proposed coolant properties, flow rates, heat-transfer coefficients, boundary conditions, and the design loads specified above. The analysis shall demonstrate acceptable component temperatures and thermal deformation without compromising RF geometry or UHV performance. |
| R35 | A simplified, shortened stripline RF mockup shall be fabricated prior to prototype manufacture to verify the kicker-body/stripline geometry, dimensions, characteristic impedance, and coaxial-port transitions. |
| R36 | The mockup shall be characterized using a two-port VNA, including S-parameter measurements and TDR. Results shall be used to validate or refine the mechanical tolerances and, if required, the BSA -provided geometry. |
| R37 | The completed prototype shall undergo an in- depth RF/electrical characterization in collaboration with BSA, including VNA/TDR measurements and stretched-wire measurements as applicable. |
| R38 | The completed stripline kicker shall satisfy EIC ESR UHV and cleanliness requirements. All vacuum -facing materials, brazes, coatings, cleaning processes, handling methods, and assembly procedures shall be compatible with the applicable BSA/EIC UHV requirements. |
| R39 | The Contractor shall develop detailed fabrication, brazing, assembly, and inspection procedures suitable for the UHV kicker construction. |
| R40 | The Contractor shall maintain the BSA-approved geometry during all manufacturing operations, including brazing, coating, cooling-bar attachment, and feedthrough integration. |
| R41 | Manufacturing drawings shall identify materials, dimensions, tolerances, surface requirements, inspection points, brazing/assembly requirements, and configuration/revision status. |
| R42 | No substitutions of materials, feedthroughs, coolants, coatings, or geometry shall be made without prior BSA approval. |
| R43 | To meet the odd -mode characteristic impedance boundary conditions, a simple metal plate need to be added as symmetry ground-plane, made of brass or aluminum, covering the mockup structure. |
| R44 | Document all RF results, observed resonances/mismatches, and any corrective actions. |
| R45 | Perform cooling tests of the kicker body and stripline circuits using the approved coolant(s), flow conditions, and instrumentation. Demonstrate consistency with the approved thermal model and stable cooling operation at representative or conservatively equivalent heat loads. |
| R46 | The completed prototype shall undergo vacuum certification consistent with the applicable EIC ESR UHV requirements. |
| R47 | The Contractor shall submit the following documentation: • Thermal analysis report • Complete detailed construction drawings for all parts and assemblies • RF mockup fabrication drawings and VNA/TDR test report • Feedthrough quotation/specification and technical data • Prototype fabrication, brazing, assembly, cleaning, and inspection procedures • Prototype RF characterization report • Cooling test report and comparison to the thermal analysis • Vacuum certification report • As-built drawings and CAD/CAE models • Design Review Documentation Package required by the SOW • Material certifications, process certifications, inspection records, nonconformance dispositions, and other quality records required by the contract or BNL-QA-101 |
| R48 | All documentation shall be in English and shall be provided electronically using a BSA-identified secure file-transfer location, shared network folder, or other approved data -transfer method. |
| R49 | Manufacturing drawings and CAD/CAE data shall be provided in BSA -acceptable native and/or exchange formats, including as applicable ACIS SAT/SAP, STEP, IGES, STL, or input files for widely used CAD/CAE tools such as CATIA, SolidWorks, Autodesk, Solid Edge, HFSS, CST Studio, AWR, or ADS. |
| R50 | Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid backup withholding.Section I (contract clauses) |
| R51 | Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and 2. I am not subject to backup withholding... and 3. I am a U.S. citizen or other U.S. person... and 4. The FATCA code(s) entered on this form (if any)... is correct.Section I (contract clauses) |
Recent awards in NAICS 335999
The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-10 | UNITED SALES ASSOC INCDepartment of Energy · RECTIFIER MODULES FOR WESTERN AREA POWER ADMINISTRATION, ROCKY MOUNTAIN REGION | $24,118 |
| 2026-06-18 | UNITED SALES ASSOC INCDepartment of Energy · NDMO COMM BATTERY CHARGER REPLACEMENTS, EO 14398 | $51,436 |
| 2026-06-03 | FED CREW INCDepartment of Energy · PURCHASE ORDER FOR BATTERY CHARGER EQUIPMENT, WESTERN AREA POWER ADMINISTRATION, UPPER GREAT PLAINS REGION | $59,036 |
| 2026-05-21 | BENNETT-ALVARADO, INC.Department of Energy · MITSUBISHI TANK HEATERS FOR SOUTH DAKOTA MAINTENANCE OFFICE LOCATED IN HURON, SD | $36,282 |
| 2026-05-04 | RURAL ELECTRIC SUPPLY COOPERATIVEDepartment of Energy · LINE HARDWARE AND WIRE FOR UGP NDMO | $88,692 |
| 2025-09-27 | MARY HELEN PARKEYDepartment of Energy · HIGH VOLTAGE SWITCHYARD EQUIPMENT | $1.88 million |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.