Tunnel 9 Pitch Upgrade: requirements and submission rules

142 requirements and 2 submission rules found in the solicitation documents for FA9101T9PU. Use them as the start of your compliance matrix.

Solicitation number
FA9101T9PU
Agency
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AIR FORCE MATERIEL COMMAND / AIR FORCE TEST CENTER / FA9101 AEDC PKP PROCRMNT BR
NAICS
332912
Set-aside
Small Business Set Aside - Total
Responses due
10 December 2026 (12 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • A company must request access to the document by sending an email to the CS and CO with the CAGE Code and the company's preferred electronic method of receiving CUI.
  • 14 Bid Extension: Is there any possibility of extending the November 6 deadline to allow additional time to review the requirements and prepare a complete proposal?

Requirements

IDRequirement
R1OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
R2Each quoter shall submit a Contractor Statement of Work (CSOW) describing its approach to meet the SOO requirements, including technical approach, schedule, testing, installation, commissioning, and quality control.
R3Quoters shall provide prior-project examples demonstrating experience with hydraulic systems of similar scope, complexity, and performance requirements.
R4The Government expects to receive FFP pricing for all line items.
R5This Contract shall be broken up into 3 separate phases that will be quoted and executed separately to ensure flexibility for AEDC Tunnel 9 on scheduling/period of performance.
R6The Offeror will not be eligible for award of a contract, task order, or delivery order resulting from this solicitation if the Offeror does not have, for each of the contractor information systems that will process, store, or transmit FCI or CUI and that will be used in performance of a contract resulting from this solicitation- (i) The current CMMC status entered in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) at the CMMC level required by paragraph (b)(1) of this provision; and (ii) A current affirmation of continuous compliance with the security requirements identified at 32 CFR part 170 in SPRS.
R7The Offeror shall provide, in the proposal, the CMMC unique identifier(s) (CMMC UIDs) issued by SPRS for each contractor information system that will process, store, or transmit FCI or CUI during performance of a contract, task order, or delivery order resulting from this solicitation.
R8If the Offeror has a CMMC Status of Conditional, the Offeror shall successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final.
R9Contractor shall be able to access and view CUI information throughout the duration of the project.
R10Contractor Personnel shall be U.S. Citizens, who possess a REAL ID, and are eligible to handle CUI information.
R11Contractor Personnel shall be trained in accordance with AEDC Tunnel 9 Safety/Operational Policies prior to start of work.
R12Work will take place in a Permit-Required Confined Space (PRCS). All contractor Personnel shall have a Confined Space Entry Certification (entrants, attendants, entry supervisors) and/or Confined Space Rescue Certification (emergency rescue team) IAW OSHA 29 CFR 1910.146.
R13The Contractor shall design, fabricate, assemble, test and supply the hydraulic system to Tunnel 9, the Government, in accordance with all documents listed in Section 3 Applicable Documents and the details of Section 4 Requirements.
R14Contractor shall adhere to a structured Systems Engineering (SE) process, including regular progress check -ins with the responsible AEDC Systems Engineer. This process shall incorporate formal design reviews at key project milestones, including, but not limited to, a Preliminary Design Review (PDR) and a Critical Design Review (CDR) prior to the start of fabrication.
R15All new hardware must mechanically integrate with the existing motion apparatus and supporting structures. The components must be designed to fit within the designated operational envelope and accommodate all movements of the larger assembly without interference.
R16System design shall prioritize long- term reliability at consistent performance. Components shall be selected for extended service life and zero-leak performance under all operating conditions.
R17System design shall facilitate rapid fault diagnosis through clear, permanent labeling of all components and conductors, and the inclusion of diagnostic test points at critical system locations.
R18System shall prioritize serviceability. Components requiring periodic service or replacement, such as proportional valve(s), cylinder wear components, filters and transducers, shall be located to allow for unobstructed access for removal and installation without the need to dismantle unrelated major assemblies.
R19Pump Motors and all other components receiving electrical input shall be supported by Tunnel 9's existing electrical supply system.
R20All instrumentation, including the primary position transducers, shall provide signals that are fully compatible with AEDC’s motion controller (for high sample rate) or control system PLC (for low sample rate). While standard 0-10V or 4-20mA signals are preferred for general sensors, specialized interfaces (i.e. SSI, EtherCAT) for position feedback are acceptable.
R21All components (except the HPU and Kidney Loop), shall be rated to operate reliably in a near -vacuum environment for up to three hours. If components are not inherently vacuum -rated, a suitable environmental enclosure or alternative solution shall be provided.
R22All wetted components shall be compatible with DTE-26 Ultra or alternative compatible selected hydraulic oil.
R23All valves, piping, tubing, hoses, connectors, and other wetted components shall be rated to meet or exceed the full main system pressure, unless installed in a pressure -reduced circuit. If installed in a reduced- pressure circuit, they may have a pressure rating appropriate for that circuit's maximum operating pressure, provided the entire circuit is protected by a secondary pressure relief valve. The set pressure of this relief valve must not exceed the maximum allowable working pressure of the lowest -rated component within that circuit.
R24System design must maintain current or equivalent safety features (interlocks, design elements, snubber controls, automated shutdown, health monitoring, valve double block and bleed, whip restraints, etc.) that maintain system safety for operation and maintenance, mitigating equipment/personnel hazards outlined in 215- T9-TCN-BHA-01, 215- T9-HYD-BHA-01, and 215-TCN-C.S.ENT.-01/02/03.
R25Must meet applicable AEDC Security standards which includes use of hard-wired connectors (No wireless/Bluetooth communications) and approved software/operating systems.
R26New hardware shall meet applicable ASME B31.1 (Power Piping), ASME BPVC (Pressure Vessels) and AEDC T1/T2 Standards (Piping and Pressure Vessels).
R27The hydraulic system's lowest natural frequency shall be minimally 4 times that of the predicted nominal maximum frequency of acceleration to avoid resonance from any operational command or motion profile, ensuring stable and predictable performance.
R28Motion apparatus shall be capable of free motion when the system is de-energized and isolation valves are open.
R29Contractor shall design all field piping, hydraulic hoses, nitrogen tubing to/from accumulators, instrumentation lines, and any supporting hardware (i.e. vacuum balancing line for the manifold.
R30A complete set of system- and component-level drawings shall be provided. This also includes a full hydraulic schematic with Bill of Materials (BOM). The drawings must be reviewed by responsible AEDC Systems Engineer prior to start of fabrication of the Hydraulic System.
R31A design calculation package shall be provided that proves key metrics are met with the proposed design. This includes but is not limited to: pressure drop, flow rates, system natural frequency/frequency of acceleration, structural analysis on actuator and relevant mounting hardware, linear actuator speed/acceleration. Design package must be reviewed by responsible AEDC Systems Engineer prior to start of fabrication of the Hydraulic System.
R32Contractor shall provide specification/data sheets for all commercially available items selected.
R33Cylinder shall be a double-acting single rod hydraulic cylinder.
R34Cylinder shall have a working stroke of 120.5” (~3060.7 mm) to replicate the current of motion.
R35Cylinder & Rod Assembly shall be capable of achieving linear speed of 13 ft/s (3.96 m/s). Fluid velocity at ports shall not exceed 55 ft/s.
R36Cylinder bore and rod size shall be selected to provide the required force and acceleration capabilities while maintaining adequate structural integrity.
R37The actuator shall be installed in a horizontal orientation on the moving portion of the test apparatus, where it will interface with the existing mechanical drive linkage.
R38Cylinder shall include ports for mounting pressure transducers at both the rod and cap sides/ports to monitor the pressure within the cylinder chambers. Transducer signal shall be compatible with the selected motion controller. The pressure range is 0-5000 psig and shall be accurate to +/-25 psi at 1000 samples/sec.
R39Cylinder shall be compatible with a new LDT/MLDT (Linear Displacement Transducer / Magnetostrictive Linear Displacement Transducer) solution for improved position and velocity accuracy. The LDT/MLDT shall have a resolution of 0.5 microns or less and a linearity deviation of 50 microns or less. Sensor shall also be hardwired to the primary motion controller and sample at 1000 samples/sec.
R40Cylinder shall utilize wear resistant materials or coatings to maximize service life/reduce risk of corrosion.
R41Cylinder design shall allow for ability to replace wear components (bushings, seals etc.)
R42Cylinder ports shall use high-integrity, leak -free fittings. Preferred serviceable connections include SAE J1453 O -ring face seal (ORFS) or dual-ferrule compression fittings (e.g., Swagelok®).
R43The replacement Control Valve shall be a high- performance, two or three-stage proportional valve designed for closed- loop control of the hydraulic actuator.
R44Valve shall have a 4-way, 3 position (4W3P) with P-A B-T, P-B A-T and all ports blocked in the center. In a de- energized or powered- off state (zero current), ports A and B shall drain to the tank (T).
R45Valve shall have a rated flow capacity at a specified pressure drop to achieve the required actuator maximum speed of ~13 ft/s.
R46Valve shall exhibit a step response time of 55 ms or less for a 0 -100% command change to ensure rapid and accurate positioning.
R47Valve shall include an integrated Linear Variable Differential Transformer (LVDT) for main spool position feedback. The feedback signal shall be compatible with the selected motion controller and sample at 1000 samples/sec.
R48Valve’s electrical connection type must interface with the motion controller if that be Ethercat, or standard signal types like +/- 10V, or 4-20mA.
R49Valve or its mounting manifold shall include ports for pressure transducers to monitor the mainstage supply (P), A, and B port pressures and the pilot supply pressure. Transducer signal shall be compatible with the selected motion controller. The transducers shall have a range of 0 to 5000 psig and shall be accurate to +/-25 psig at 1000 samples/sec.
R50The valve assembly and its associated manifold shall be securely mounted to the primary equipment structure. The layout must be optimized to minimize the length of hydraulic connections to the actuator while also providing sufficient access for maintenance tasks.
R51Valve Assembly shall incorporate features to facilitate system flushing, such as dedicated flushing ports or a bypass plate.
R52Valve Assembly shall provide a dither function, either generated internally by its onboard electronics or accepted from an external control signal.
R53A and B Ports of Proportional Valve shall be isolated from the cylinder when not actively being controlled via solenoid actuated (or equivalent actuation medium) blocking valves that are controlled from a touch panel and computer via hardwire to the existing PLC hardware. The valves are only permitted to open when interlock is satisfied that pressure differential results in a balanced net force on the rod and cap ends of the cylinder.
R54Proportional Valve and/or manifold ports shall use high-integrity, leak-free fittings where necessary. Preferred serviceable connections include SAE J1453 O-ring face seal (ORFS) or dual -ferrule compression fittings (e.g., Swagelok®). The use of tapered pipe threads (NPT) is prohibited on connections larger than 1/2", any use of NPT must be specially approved by Tunnel 9 System Engineering.
R55Hard Connections shall be used between the accumulators and actuator, and total pipe connection length shall be optimized for controllability and performance.
R56Piping/Tubing/Hoses/Connections shall be selected and sized to support the transient and continuous flow rates required to reach maximum actuator speed of 13 ft/s and system pressure required to reach the maximum acceleration of 130 ft/s^2. Fluid velocity shall not exceed 55 ft/s at any point in the system. Exceptions for components (i.e. Proportional Valve) shall be reviewed and approved by AEDC System Engineer.
R57All Piping must be ASTM A106 Grade B Seamless Steel Pipe or equivalent and tubing seamless ASTM A269 316/316L, 304/304L stainless steel, or equivalent.
R58Piping/Tubing shall be securely supported and clamped at regular intervals to prevent vibration and stress on the fittings as specified by manufacturer. Clamps shall be of a non-abrasive material to prevent damage to the pipes.
R59Connections shall fit selected components (proportional valve, cylinder, accumulators, pump isolation valves etc.) and fit within the current equipment housing without any modifications unless minor modifications (obvious non-impact to structural integrity) are absolutely necessary.
R60Flexible Hoses may be used where necessary to accommodate movement between components. Hoses shall be selected using the guide for SAE Hydraulic Hose Specifications & rated for the system's maximum operating pressure and temperature.
R61Flexible Hoses outside of shielded spaces must feature a whip restraint in accordance with “MSHA 30 CFR 56/57.13021 High Pressure Hose Connections”.
R62Connections on high- pressure lines shall be made using high- integrity, leak-free fittings. Preferred serviceable connections include SAE J1453 O-ring face seal (ORFS) or dual -ferrule compression fittings (e.g., Swagelok®). For permanent connections, socket -weld fittings and butt -welds are acceptable. The use of tapered pipe threads (NPT) is prohibited on connections larger than 1/2", any use of NPT must be specially approved by Tunnel 9 System Engineering.
R63Separate Cooling Filtration Loop shall feature a separate pump that is connected to the main hydraulic reservoir.
R64Filtration Loop Pump Motor shall be able to be toggled on and off from the primary operator station and control panel via hard-wire to existing PLC’s.
R65Filtration Loop Electric Motor shall be sized for the existing electrical disconnect in the facility utility area for LOTO purposes and not exceed the voltage current load rating when operating at the same time as the main pump. (480 V, 100 A Capacity, 3 Phase, 60HP).
R66Filtration Loop System shall contain course and fine particle filtration (10 micron and 3 micron) as well as moisture filtration.
R67Filtration Loop System shall provide oil cooling via optimally sized shell and tube style heat exchanger, that can be connected to T9’s city/chiller water supply (~80 psi). Oil temperature shall not exceed 130°F over 6 hours of runtime.
R68Filtration Loop System shall contain necessary safety features such as pressure relief before the filter stages.
R69Filtration Loop System shall contain system monitoring devices such as a pump outlet pressure gauge, temperature gauges/transmitters on the water and oil inlet/outlet of heat exchanger and analog/digital flow meters on the oil and water lines.
R70Resulting fluid velocity from Filtration Loop Pump flow rate shall not exceed 20 ft/s at any point in the system.
R71HPU shall be redesigned/altered to support the Proportional Valve and Piston Flow Rate & Pressure requirements while maintaining same ability to supply other existing auxiliary hydraulic functions.
R72HPU configuration shall maintain uninterrupted hydraulic power and control to the primary translation assembly during all translational movements of the dynamic system structure. The HPU must be designed to accommodate this motion, either by being physically integrated with the dynamic structure, moving independently alongside it, or through appropriately managed flexible connections.
R73HPU Pump shall be variable displacement & pressure compensated featuring a case drain.
R74HPU Electric Motor shall be sized for the existing electrical disconnect in the basement for LOTO purposes and meet the voltage current load rating when operating with the kidney loop pump (480 V, 100 A Capacity, 3 Phase, 60HP).
R75HPU Motor shall be able to be toggled on and off from the primary operator station and control panel via hard-wire to existing PLC’s.
R76HPU shall be equipped with a high-pressure filter placed directly downstream of the pump.
R77The HPU design shall include a valve configured to automatically vent stored hydraulic energy (including energy stored in accumulators) whenever the system is de-energized.
R78HPU shall include health monitoring features including but not limited to: • Oil temperature sensor shall be located at the case drain; range 0°F to 200°F and shall be accurate to +/-5°F at 10 samples/sec. • Pressure transducer located at the pump outlet; pressure range 0 to 5000 psi accurate to +/-25 psig at 10 samples/sec. • High/Low oil level reservoir alarms [float switch(es)].
R79HPU Fluid Velocity shall not exceed 20 ft/s in the HPU supply to the accumulators and not exceed 30 ft/s in return to the reservoir from cylinder.
R80Accumulators & associated piping (Gaseous Nitrogen & Hydraulic) shall be redesigned if one of the following can’t be met with the other changes to the hydraulic system: a. Max allowable pressure (MAWP) is less than the new HPU/system operating pressure. b. Total effective fluid volume meets new servo/actuator required volume/flow rate.
R81Accumulators shall be of the bladder type, chargeable with dry-nitrogen gas.
R82Accumulators shall have sufficient effective volume to supply the peak flow demands of the actuator during a maximum velocity command through 90% of the stroke, without allowing the main system pressure to drop below 75% of the nominal operating pressure.
R83Accumulators must fit the primary translation assembly and have ample clearance with all surrounding facility enclosure walls.
R84Contractor shall demonstrate validation of system performance (system response time, actuator displacement/velocity/acceleration) via physics-based simulation model that serves as a digital prototype of the dynamic motion system. This model shall include relevant inputs used, in addition to the performance outputs. This shall be delivered in a written report format with figures that shall be approved by AEDC System Engineer.
R85Contractor shall provide their simulation model or system parameters to AEDC to create their own similarly -performing simulation model via AEDC enterprise software.
R86Contractor shall provide transfer function coefficients to model a 2nd order hydraulic system. These coefficients shall include: Damping factor, natural frequency, frequency of acceleration, Positive/Negative system gain, maximum compression, and maximum force of the system.
R87Contractor shall supply predicted simulation gain constants to support the tuning and calibration of the motion controller with the new hardware.
R88The Contractor shall supply all components of the hydraulic system as specified in the engineering design section.
R89The Contractor shall provide all manufacturing and factory acceptance testing of the hydraulic equipment.
R90Contractor shall coordinate with AEDC representatives to ship all hardware to AEDC White Oak, 10905 New Hampshire Ave, Silver Spring MD, 20903.
R91Contractor shall conduct a hydrostatic pressure test of the Cylinder’s design pressure at a minimum. Contractor shall provide AEDC with a certificate including the maximum pressure and hold time at a minimum.
R92If welding is required, Cylinder shall be welded by an individual qualified via internationally recognized standard (ASME, AWS, ISO, etc.). Contractor shall provide AEDC with a weld inspection certification.
R93Contractor shall provide a Material Certification and Certification of Conformance (CoC) that verifies the materials used, and dimensions specified from the approved cylinder fabrication drawing.
R94Contractor shall demonstrate the cylinder’s ability to achieve the desired speed and acceleration in the retract and extend direction using a test setup at their own facility. This test must be either witnessed live by AEDC or documented and certified.
R95Contractor shall provide a specification sheet for the selected position transducer & pressure transducers and calibration documentation (Calibration to be completed by the contractor or OEM)
R96Contractor shall provide specification sheet for the selected proportional valve that includes the model configuration information.
R97Contractor shall provide calibration/performance documentation for the selected valve. This includes but may not limited to: Pressure vs Flow curve data, Step/Frequency Response Data, LVDT Output Signal (Null, Ends of Stroke etc.)/Linearity, & fail safe function.
R98Contractor shall demonstrate the ability to produce the required flow rate/pressure calculated from the design phase, using a test setup at their facility. This test must be either witnessed live by AEDC or documented and certified.
R99For any hydraulic/pneumatic hoses supplied, the Contractor shall conduct a hydrostatic pressure test to the hose’s design pressure at a minimum. Contractor shall provide AEDC with a certificate including the maximum pressure and hold time at a minimum.
R100Contractor shall provide a Material Certification and Certification of Conformance (CoC) that verifies the materials used for the Piping and Tubing, and dimensions specified from the approved fabrication drawing (run length, schedule/thickness, bend radius etc.).
R101Any offsite welding of sections shall be welded by a qualified individual in accordance with ASME 31.1 Section 127 or other international recognized standard (AWS, ISO, DIN etc.). Welds shall be visually inspected per ASME 31.1 Section 136.4.2 by NDE Personnel (qualified in accordance with ASME 31.1 Section 136.3.2). Contractor shall provide AEDC with a weld inspection certification verifying all tubing/piping welds have been inspected.
R102Contractor shall provide certification of cleanliness (ISO 4406 16/14/11) of any sub-assemblies of piping/tubing.
R103Contractor shall complete a functional test of the Kidney Loop. Contractor shall demonstrate the unit can supply the specified maximum system operating pressure and flow rate for a prolonged period of time. This test must be either witnessed live by AEDC or documented and certified by a qualified individual.
R104Associated instrumentation shall be calibrated and demonstrated to be functioning/accurate. This test must be either witnessed live by AEDC or documented and certified by a qualified individual.
R105Contractor shall provide a certificate of conformance (CoC) for the assembly verifying the package dimensions of the unit.
R106Contractor shall provide certification of cleanliness (ISO 4406 16/14/11) for the HPU assembly.
R107Accumulators shall be designed, fabricated, and certified in accordance with ASME BPVC Section VIII, Division 1, and shall bear the U-Stamp symbol.
R108Contractor shall conduct a hydrostatic pressure test in accordance with ASMC BPVC VIII. Contractor shall provide AEDC with a certificate including the maximum pressure and hold time at a minimum.
R109Accumulators shall be welded by a qualified individual in accordance with ASME BPVC IX or other international recognized standard (AWS, ISO, DIN etc.) in accordance with VIII. Welds shall be visually inspected per ASME BPVC Section VIII, by qualified NDE personnel. The Contractor shall submit all weld inspection certifications to AEDC upon completion.
R110An Outage Readiness Review (ORR), in coordination with AEDC personnel, shall be conducted prior to start of demolition. Approval will be required to proceed into demolition/installation.
R111Contractor shall remove identified legacy hardware that is no longer needed for the new system design. Hardware shall be appropriately removed from service and disposed of.
R112Contractor shall conduct thorough clean- up of the affected area post -demolition.
R113Contractor shall complete any remaining assembly of system on- site (pipefitting, field welding, mounting, etc.) and install system in its designed configuration within and around the designated Tunnel 9 equipment enclosure.
R114Any field-welding shall be completed by a qualified individual in accordance with ASME 31.1 Section 127 or other applicable internationally recognized organization (AWS, ISO, DIN etc.). Welds shall be visually inspected per ASME 31.1 Section 136.4.2 by NDE Personnel (qualified in accordance with ASME 31.1 Section 136.3.2). Contractor shall provide AEDC with a weld inspection certification verifying all tubing/piping field- welded have been inspected.
R115All components listed on the Bill of Materials shall be tagged or marked with a Component ID number that corresponds with the Schematic.
R116Contractor shall inspect & provide a certificate of conformance the assembly was correctly installed per schematic and assembly drawings.
R117Contractor shall provide a detailed maintenance plan and operations manuals for the system and applicable individual components.
R118Contractor shall conduct thorough clean-up of the affected area post-installation.
R119Contractor and AEDC representatives shall collaborate to create a System Test Plan (STP) document and Commissioning Plan and conduct a Verification Readiness Review (VRR) post-installation of system, and prior to commissioning of completed assembly.
R120Contractor shall modify components and associated equipment of the assembly as needed after failed tests and repeat all tests until the system meets test requirements.
R121Contractor shall be responsible for ensuring that the Hydraulic System provided meets all requirements in accordance with all documents listed in Section 3 Applicable Documents.
R122Following completion of the System Test Plan and Verification stage, Contractor shall collaborate with AEDC to hold a Functional Configuration Audit (FCA) with Site Management to ensure objectives were met based on system requirements.
R123Contractor shall test and verify that all hardwired safety interlocks without hydraulic pressure applied and assist AEDC in simulating hardware faults (e.g., tripping a level switch) to verify that the control system correctly identifies the fault and executes the programmed safe-state logic.
R124Contractor shall verify and document that all hydraulic accumulators have been properly pre- charged with dry nitrogen to the design- specified pressure prior to introducing hydraulic fluid into the lines.
R125The Contractor shall demonstrate that the hardware physically executes the required functions when prompted by the AEDC control system (e.g., a "dump valve" physically opening when the software sends the trigger signal).
R126Contractor shall visually inspect newly installed equipment for interference with translation of the dynamic structure and surrounding equipment enclosure prior to dynamic testing during Commissioning
R127Contractor shall conduct a low -pressure leak test of the completed assembly to check for major leaks before proceeding to full system pressure.
R128Contractor shall pressurize the fully integrated hydraulic (and pneumatic, if applicable) system to the maximum normal operating pressure. The system shall be held at pressure and inspected to verify zero external leakage.
R129Contractor and AEDC shall conduct system shut-down test. The Contractor shall power off the HPU and document that the system achieves a safe state, and that all stored hydraulic energy (including accumulators) is bled down to a zero-energy state as required by the design.
R130Contractor shall systematically bleed all trapped air from the hydraulic lines, manifolds, and the primary actuator cylinder to ensure fluid stiffness and prevent cavitation prior to dynamic operations.
R131Contractor shall perform a high-velocity fluid flush of all installed field piping and hoses (bypassing sensitive valves/cylinders). The system shall achieve a verified fluid cleanliness level of ISO 4406 16/14/11 or better. Compliance shall be demonstrated via a certified Fluid Analysis Report prior to operational handover.
R132The Contractor shall functionally validate the operation of all system relief valves, verifying and documenting both the cracking pressure and full -flow bypass pressure to ensure safe system boundaries.
R133Contractor shall independently operate the offline filtration and cooling loop to verify functional performance. The Contractor shall demonstrate that the auxiliary pump achieves the design flow rate, the heat exchanger maintains the reservoir fluid temperature within specified design limits, and the filter differential pressure (DP) indicators or interlocks function correctly. Results shall be documented in the STP.
R134The Contractor shall verify and document that the newly installed hydraulic assembly maintains sufficient physical clearance throughout the entire range of motion, ensuring no component interference, binding, or hose stretching occurs.
R135Prior to final acceptance, the Contractor shall conduct a physical Maintainability Demonstration for AEDC personnel. The Contractor shall physically demonstrate the execution of critical maintenance tasks as outlined in their provided Operations and Maintenance (O&M) manuals. This demonstration must prove that tasks can be performed safely, with standard tools, and without requiring the removal of unrelated major components.
R136During this tuning/performance testing phase, Contractor shall: • Provide on- site technical and engineering support to monitor hardware performance and address any mechanical or hydraulic issues. • Demonstrate that the supplied hydraulic hardware (including the HPU, proportional valve, and cylinder) operates within its designed pressure and flow envelopes and maintains mechanical and structural integrity (ensuring zero leakage, secure mountings, and no excessive vibration, etc.) while operating within approved design limits.
R137Contractor shall be responsible for repairing/replacing any compromised seals, failed sensors or on-board valve electronics due to vacuum environment.
R138Contractor shall verify that all valves and actuators achieve their design-specified mechanical positions (e.g., spring -return to null, fail -in-place) immediately upon loss of electrical power or command signal, independent of software control.
R139Contractor shall compile and deliver a comprehensive Commissioning Report to serve as the final project handover document. This report shall include the fully executed System Test Plan (STP), documented results of all pre -commissioning and commissioning checks, and all required compliance certificates.
R140The Contractor shall provide remote technical consultation and on- site corrective maintenance in the event of hardware non-conformance or failure.
R141The Contractor shall provide a one- year warranty for each component/assembly, stating that it is free from any manufacturer defects. The warranty period shall begin after acceptance at AEDC.
R142For engineering, before prime contractor acquires equipments to use or seek technical support subcontractor, Government must be aware and approve it. For security, prime contractor will be responsible to ensure that the large business or subcontractor have the necessary security level for receiving and handling CUI.

Recent awards in NAICS 332912

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-07-30ECHELON SUPPLY AND SERVICE, INC.Defense Logistics Agency · 8512274194!H45 OVERFLOW HOSE$4,289
2026-07-24STRAVON SYSTEMS LLCDepartment of the Air Force · NEW, BRAND-NAME, PARKER SE60 SERVO VALVES (P/N: SE60SAAHANA25)$80,640
2026-07-23ATAP INCDepartment of the Army · THIS REQUIREMENT IS FOR THE PROCUREMENT OF SPECIALIZED, HIGH-SPECIFICATION AVIATION AND FLUID-HANDLING EQUIPMENT.$13,650
2026-07-23S I T CORPORATIONDefense Logistics Agency · 8512259888!VALVE SECTION,PIPEL$3,423
2026-07-23ITL LLCDefense Logistics Agency · 8512259959!ELBOW,TUBE TO HOSE$397
2026-07-22KAMPI COMPONENTS CO INCDefense Logistics Agency · 8512112241!VALVE,REGULATING,FL$9,124

Source: USAspending.gov, retrieved 2026-11-07. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.