RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF): requirements and submission rules
16 requirements and 2 submission rules found in the solicitation documents for FA9101269TS2. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Submission Format: Whitepapers must be submitted in PDF format, limited to 15 pages, excluding ROM and schedule details.
- Submission Deadline: 16 November 2026
Requirements
| ID | Requirement |
|---|---|
| R1 | The Performer will design, fabricate, deliver, install, and functionally verify a comprehensive, integrated TS2 system, leveraging structural and spatial enhancements. |
| R2 | Deliver a freestanding steel test superstructure containing a ground-level test area and an elevated platform rated for a 100,000 lbs. (or code-required live load, whichever is greater) capacity load. Integrate a certified 25-ton bridge crane and a 5-ton monorail system with a concrete/steel deck roof for debris protection. |
| R3 | Design and integrate a steel fuel catch pan to capture up to 1,000 gallons of spilled aviation fuel for an individual test. Deliver a 6,000-gallon recovery tank and a portable pump system, which transfers fuel from the catch pan to the recovery tank, with a minimum transfer rate of ~ 180 gallons per minute (GPM), and fully compliant with environmental regulations. |
| R4 | Implement a cohesive, fully verified system with robust controls, safety compliance, wide stair/ladder access, and custom removable ballistic protection interfaces, minimizing operational disruptions to adjacent sites. Particularly, the superstructure meets load capacity requirements, the cranes meet lifting and clearance specifications, and fuel systems collect, store, and transfer fuel correctly. |
| R5 | The Performer's response must focus on demonstrating their technical capability, experience, and methodology to execute this project successfully. |
| R6 | Instead, the Performer must show they have the technical expertise, personnel, equipment, and supply chain to design-build the system per the SOO. |
| R7 | The Performer must clearly outline their proposed IP and data rights assertion strategy. |
| R8 | All IP and data rights assertions must reference "Article: Intellectual Property Rights in accordance with part 3 of the AEDC Velocity Consortium Request for Whitepaper" for VAC members. Non-VAC industry partners must clearly state IP and data rights assertions within the white paper. |
| R9 | The Performer is required to provide formal confirmation of the specific prototype rights they will grant to the Government for the designs, "as-built" CAD files, and operational/maintenance documentation. |
| R10 | To be eligible for award, the Performer must meet the statutory requirements of 10 U.S.C. § 4022(d). The Performer's whitepaper must explicitly detail how they satisfy at least one of the following criteria: Criterion 1: There is at least one nontraditional defense contractor (NDC) or nonprofit research institution participating to a significant extent in the prototype project; Criterion 2: All significant participants in the transaction other than the Federal Government are small businesses (including small businesses participating in a program described under section 9 of the Small Business Act (15 U.S.C. 638)) or nontraditional defense contractors; Criterion 3: At least one-third of the total cost of the prototype project is to be paid out of funds provided by sources other than the Federal Government; Criterion 4: The senior procurement executive for the agency determines in writing that exceptional circumstances justify the use of a transaction that would otherwise not be entered into. |
| R11 | Performers must provide a detailed execution schedule and a Rough Order of Magnitude (ROM) cost estimate for all Base Milestones. |
| R12 | Performers are not required to provide pricing or ROM estimates for the Unpriced/Unfunded Options but are required to provide an estimated schedule and integration plan for these options. |
| R13 | The Performer must demonstrate their compliance with defense cybersecurity standards. |
| R14 | All cybersecurity protocols must reference "Article: Cybersecurity Requirements (CUI and CMMC)". |
| R15 | Performers must explicitly highlight that compliance with these cybersecurity standards flows down to all subcontractors, suppliers, and consortium partners, and remains the sole responsibility of the prime Performer. |
| R16 | The Performer must map their proposed timeline and schedule directly to milestones. |
Recent awards in NAICS 236220
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2031-02-11 | FEDVET CONSTRUCTIONDepartment of the Army · MIN GUARANTEE | $2,500 |
| 2030-09-28 | STRUCTSURE PROJECTS INCDepartment of the Navy · MEDICAL MACC-MINIMUM GUARANTEE | $0 |
| 2027-11-02 | CCI PRIME CONTRACTORS, LLCDepartment of the Air Force · FY25 MSG CES HANGAR H285 REPAIR MAINTENANCE DOCK | $27.62 million |
| 2027-07-31 | DOYON TECHNICAL SERVICES, LLCDepartment of the Army · PJ00082-25 - PROVIDE AND INSTALL ALL MATERIAL AND LABOR NECESSARY TO DEMO FAILED CMP, AND RE-INSTALL RCP. PJ00018-26 - DESIGN, DEMOLISH, INSTALL, AND COMMISSION A COMPLETE AND OPERATIONAL NEW DRY PIPE | $486,999 |
| 2027-07-17 | CONTI FEDERAL SERVICES, LLCDepartment of the Army · B-21 60 ROW SOUTH ENVIRONMENTAL PROTECTION SHELTERS (EPS) AT ELLSWORTH AIR FORCE BASE (AFB), SOUTH DAKOTA (SD) | $43.99 million |
| 2027-04-28 | MIRADOR ENTERPRISES, INC.Department of the Air Force · THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DESIGN INSTALL EMERGENCY WASH STATIONS, HOLLOMAN AFB, NEW MEXICO. | $79,056 |
Source: USAspending.gov, retrieved 2026-10-18. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.