TenderAxiom

TenderAxiom · Opportunities

RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF): requirements and submission rules

35 requirements and 2 submission rules found in the solicitation documents for FA9101269TS2. Use them as the start of your compliance matrix.

Solicitation number
FA9101269TS2
Agency
DEPT OF DEFENSE / DEPT OF THE AIR FORCE / AIR FORCE MATERIEL COMMAND / AIR FORCE TEST CENTER / FA9101 AEDC PKP PROCRMNT BR
NAICS
236220
Set-aside
None stated
Responses due
16 November 2026 (closed)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Submission Format: Whitepapers must be submitted in PDF format, limited to 15 pages, excluding ROM and schedule details.
  • Submission Deadline: 16 November 2026

Requirements

IDRequirement
R1The Performer's response must focus on demonstrating their technical capability, experience, and methodology to execute this project successfully.
R2The Performer must show they have the technical expertise, personnel, equipment, and supply chain to design-build the system per the SOO.
R3The Performer must clearly outline their proposed IP and data rights assertion strategy.
R4All IP and data rights assertions must reference "Article: Intellectual Property Rights in accordance with part 3 of the AEDC Velocity Consortium Request for Whitepaper" for VAC members. Non-VAC industry partners must clearly state IP and data rights assertions within the white paper.
R5The Performer is required to provide formal confirmation of the specific prototype rights they will grant to the Government for the designs, "as-built" CAD files, and operational/maintenance documentation.
R6To be eligible for award, the Performer must meet the statutory requirements of 10 U.S.C. § 4022(d). The Performer's whitepaper must explicitly detail how they satisfy at least one of the following criteria: Criterion 1... Criterion 2... Criterion 3... Criterion 4...
R7Performers must provide a detailed execution schedule and a Rough Order of Magnitude (ROM) cost estimate for all Base Milestones.
R8Performers are not required to provide pricing or ROM estimates for the Unpriced/Unfunded Options but are required to provide an estimated schedule and integration plan for these options.
R9The Performer must demonstrate their compliance with defense cybersecurity standards.
R10All cybersecurity protocols must reference "Article: Cybersecurity Requirements (CUI and CMMC)".
R11Performers must explicitly highlight that compliance with these cybersecurity standards flows down to all subcontractors, suppliers, and consortium partners, and remains the sole responsibility of the prime Performer.
R12The Performer must map their proposed timeline and schedule directly to milestones.
R13The proposed design must address several critical deficiencies inherent in the current site. Specifically, operations are currently hindered by limited ballistic threat capture capabilities and inadequate fuel containment and recovery systems. Furthermore, the facility experiences extended and inefficient test setup times and is unable to accommodate varied shot line elevations, remaining strictly limited to horizontal configurations.
R14A new steel test superstructure (approx. 24’ Width x 50’ Length x 50’ Height) shall provide both a ground-level test area and an elevated platform at a height of 20’.
R15The superstructure shall include an integrated 25-ton bridge crane with a hook clearance of ~ 20’ above the first level platform and the ability to transfer test items from the ground level to anywhere on the elevated platform via removable grating.
R16In addition, the first level platform shall support a 5-ton monorail.
R17The design must incorporate a concrete/steel deck roof structure covering the entire crane span.
R18The contractor shall design and install a steel fuel containment catch pan capable of capturing and containing up to 1,000-gallons of fuel for an individual ballistic test.
R19The contactor shall design and install a 6,000-gallon fuel recovery tank and provide a portable pump system which transfers fuel from the “catch pan” to the recovery tank.
R20The contractor shall be responsible for the end-to-end management, engineering, fabrication, installation, and functional verification of the entire system.
R21Blast analysis is not necessary; however, designing the structure for accidental fires is required. Design should include the best approach for fire design per AISC, ACI, and owner input.
R22A 40’ long x 4’ high concrete curb is required along the north edge of the test area.
R23Any proposed design requiring modification to existing infrastructure shall be identified early and will be considered out of scope unless otherwise approved.
R24The roof shall provide protection to personnel and test articles/equipment from falling debris (weather and adjacent concrete wall).
R25Test superstructure shall be designed to incorporate removable ballistic protection (bullet catchers, steel plates, etc.). Shields drawings/weights to be provided by owner.
R26Design shall include wide stair access to the upper platform and ladder access to roof.
R27Design shall adhere to all personnel and test safety standards.
R28The bridge crane system must meet all requirements of the Crane Manufacturers Association of America (CMAA) and be certified in accordance with OSHA and ASME standards.
R29The first level platform to have the higher of a 100,000 lbs. total (blanket) load or code required live load. Grating design drawings, to be incorporated in this project, to be provided by owner.
R30The system must be compatible with Jet-A, JP-8, and other standard military-grade aviation fuels.
R31The moveable pump system shall be capable of transferring fuel from the catch pan to the recovery tank at a minimum rate of ~ 180 gallons per minute.
R32The fuel system must include emergency shut offs and be compliant with all relevant EPA, local, and WPAFB environmental regulations for fuel storage and handling.
R33The construction and installation plan must minimize disruption to ongoing operations at adjacent AVSF test sites. A phasing plan may be required.
R34The design must specify all required utility connections, including power (voltage and phase requirements), water, and data acquisition/controls/communication lines.
R35The contractor shall provide the following deliverables: A fully constructed and operational Test Site 2 (superstructure, elevated platform, fuel pan, fuel recovery tank and pump, concrete retention wall, utility connections, etc.); Comprehensive documentation for operation, safety, and long-term maintenance; Design Reviews including Preliminary Design Reviews (PDR) and Critical Design Reviews (CDR) with government stakeholders; Final “as-built” drawings, including certified equipment drawings for the bridge crane and monorail, in both PDF and native CAD format upon project completion.

Recent awards in NAICS 236220

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2031-02-11FEDVET CONSTRUCTIONDepartment of the Army · MIN GUARANTEE$2,500
2030-09-28STRUCTSURE PROJECTS INCDepartment of the Navy · MEDICAL MACC-MINIMUM GUARANTEE$0
2027-11-02CCI PRIME CONTRACTORS, LLCDepartment of the Air Force · FY25 MSG CES HANGAR H285 REPAIR MAINTENANCE DOCK$27.62 million
2027-07-31DOYON TECHNICAL SERVICES, LLCDepartment of the Army · PJ00082-25 - PROVIDE AND INSTALL ALL MATERIAL AND LABOR NECESSARY TO DEMO FAILED CMP, AND RE-INSTALL RCP. PJ00018-26 - DESIGN, DEMOLISH, INSTALL, AND COMMISSION A COMPLETE AND OPERATIONAL NEW DRY PIPE$486,999
2027-07-17CONTI FEDERAL SERVICES, LLCDepartment of the Army · B-21 60 ROW SOUTH ENVIRONMENTAL PROTECTION SHELTERS (EPS) AT ELLSWORTH AIR FORCE BASE (AFB), SOUTH DAKOTA (SD)$43.99 million
2027-04-28MIRADOR ENTERPRISES, INC.Department of the Air Force · THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO DESIGN INSTALL EMERGENCY WASH STATIONS, HOLLOMAN AFB, NEW MEXICO.$79,056

Source: USAspending.gov, retrieved 2026-10-25. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.