Vandenberg Crane Replacement: requirements and submission rules
9 requirements and 2 submission rules found in the solicitation documents for FA8227-27-Q-1000. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- Submit electronically per SOW 3.10.4 in PDF and native editable format (e.g., MS Excel).
- Submit electronically per SOW 3.12.2.
Requirements
| ID | Requirement |
|---|---|
| R1 | Due no later than 15 calendar days after contract award. |
| R2 | One (1) copy of each submittal shall be provided electronically to each addressee in block 16 in Microsoft Office compatible format. |
| R3 | Due 30 calendar days prior to scheduled proof load testing; resubmittal only if required to correct deficiencies identified during Government review. |
| R4 | NDE results shall be included in the final test report. |
| R5 | Due 15 calendar days prior to commencement of site work. |
| R6 | The Site-Specific Safety Plan shall include detailed procedures for LOTO, fall protection, electrical safety in compliance with AFMAN 91-203, and hot work. |
| R7 | No on-site work shall commence until written approval of this plan is granted. |
| R8 | Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423. |
| R9 | Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. |
Recent awards in NAICS 333923
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-01 | KUK JE SANG SADepartment of the Army · 1ST EXERCISED OPTION YEAR - HOIST, OVERHEAD CRANE, AND SLING INSPECTION, TEST, PM, AND REPAIR, OSAN AB | $104,367 |
| 2026-07-23 | U.S. MATERIALS HANDLING CORPORATIONDepartment of the Army · S2P2: GANTRY CRANE: SOLICITATION: W911S226U3536 | $92,041 |
| 2026-07-23 | ALLOY SLING CHAINS, LLCDefense Logistics Agency · 8512259506!STRAP,RATCHET | $13,548 |
| 2026-07-23 | CENTEK INDUSTRIES, INC.Department of the Navy · CRANSTON EAGLE OFFLOAD HOOKS ARE REQUIRED TO BE RECERTIFIED BY CENTEK MARINE-DELTA T SYSTEMS. USS ANCHORAGE LPD-23 IS OBLIGED TO HAVE ALL CRANSTON EAGLE HOOKS RECERTIFIED EVERY FIVE (5) YEARS. FAILURE | $13,636 |
| 2026-07-23 | L.G. WHITE SAFETY CORPORATIONDepartment of the Air Force · HANGER OVERHEAD FALL PROTECTION ANNUAL INSPECTION | $14,950 |
| 2026-07-21 | GOVPARTS LLCDefense Logistics Agency · 8512253841!WINCH,DRUM,POWER OP | $3,040 |
Source: USAspending.gov, retrieved 2026-10-24. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.