WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL: requirements and submission rules
42 requirements and 13 submission rules found in the solicitation documents for FA813727R0001. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- The electronic copies of the proposal shall be submitted in a format readable by Microsoft (MS) Word 2007, 2010, or 2013, MS Excel 2007, 2010 or 2013, MS-Power Point 2007, 2010, or 2013, and MS-Project 2013, and Adobe Acrobat Portable Document Format (PDF), as applicable.
- (c) If the offeror deletes or modifies subparagraph (a)(2) above, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the FA813727R0001 Page 23 of 34
- The offeror shall submit construction price proposals utilizing AF Form 3052, Construction Price Estimate Breakdown, or a contractor generated equivalent that provides the same information.
- Use at least 1-inch margins on the top and bottom and 3/4-inch side margins.
- (b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base.
- Submit only one proposal for the project, if multiple proposals or proposal options are submitted, it may cause your submission to be technically unacceptable.
- Proposals and modifications to proposals shall be submitted in via previously mentioned method addressed to the contracting specialist/contracting officer at the address shown on OPR and showing the time and date specified for receipt, the OPR number, and the name and address of the offeror.
- Pricing for subcontracted work shall comply with the following requirements: 1) Subcontractor quotes shall provide the same level of detail and include supporting documentation as described in section 3.2(b), "Detailed Price Proposal".
- The offeror shall provide a statement the offeror has completed the annual representations and certification electronically via the SAM website at https://www.sam.gov/ SAM/.
- Do NOT submit any documents in PDF format that are copied as "images." When creating PDF files always create to enable textual search and copy functions.
- The offeror's completed proposal shall consist of the completed and signed OPR, to include any amendments issued, with a cover letter delineating any exceptions taken to the OPR terms and conditions with accompanying rationale.
- The offeror's proposal shall include a signed copy of the Model Order.
- The design price shall be submitted as a total design price with a breakout of design and non-design price that demonstrates compliance with DFARS 236.606-70, Statutory Fee Limitation.
Requirements
| ID | Requirement |
|---|---|
| R1 | THIS ORDER PROPOSAL REQUEST IS ONLY AVAILABLE TO CURRENT BOA HOLDERS |
| R2 | The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair/replacement of the compromised structural integrity of B1134 east post and north wall (South 40). |
| R3 | The contractor shall begin performance within 10 calendar days and complete it within 195 calendar days after receiving notice to proceed. |
| R4 | THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? YES [within 10 Calendar Days after award] |
| R5 | Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 11:59 PM local time 16 Nov 2026. |
| R6 | Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due. |
| R7 | Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| R8 | IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. |
| R9 | The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation. |
| R10 | Effective May 3, 2023 all contractors must comply with the REAL ID Act requirements. https://www.dhs.gov/real-id |
| R11 | All visitors are required to have the proper identification to access an Air Force installation. A REAL ID Act compliant credential will be required to establish individual identity. Those who do not have the accepted documentation for installation access will not be permitted to enter the base without an approved escort (contractors cannot escort other contractors). |
| R12 | The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. |
| R13 | The offeror's proposal must include all data and information requested by this ITO. Non-conformance with the instructions provided in this ITO may result in an offeror's proposal being determined ineligible for award. The offer shall be compliant with the requirements as stated in the OPR and its attachments for this construction project. |
| R14 | Email may be used to transmit the proposal and must include "Company Name, Source Selection Information - See FAR 2.101 and 3.104" in the subject line of the email. When submitting source selection information via email, file suppression utilities, to include but not limited to zip files, will not be accepted. |
| R15 | Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the offeror's proposal. Any unacknowledged amendments in the offeror's proposal will render the offeror ineligible for award. |
| R16 | Each page containing proprietary information should be so marked. |
| R17 | Each page should contain the legend "CUI SOURCE SELECTION INFORMATION-SEE FAR 2.101 and 3.104" at the bottom of each sheet. |
| R18 | Legible tables, charts, graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated and shall not exceed 11 x 17 inches in size. Foldout pages shall fold entirely within the volume, and count as a single page. Foldout pages may only be used for large tables, charts, graphs, diagrams and schematics, not for pages of text. The following limitation only applies to the Technical Volume. Text intended for evaluation within all figures, charts, tables, and graphs, to include imbedded images, shall be no less than Arial 8-pt. |
| R19 | In the Technical Volume of the proposal, address your proposed approach to meeting the minimum performance or capability requirements of the technical requirements identified in the OPR. The technical proposal should be specific and complete. |
| R20 | All the requirements specified in the OPR are mandatory. By your proposal submission, you are representing that your company will perform all the requirements specified in the OPR. Mere recitation of the OPR requirements, or phrases that refer to the government's SOW, without sufficient supporting information as to how work will be accomplished will not be accepted. Narratives shall provide detail of sufficient level to allow one skilled in engineering and the building trades to make a sound decision as to the technical viability of the proposal. |
| R21 | Technical Volume Cover Sheet. The technical order volume shall include a cover sheet containing date, OPR number, project number and title, offeror contact information, and assertion the proposal meets the mandatory completion date stated in the OPR. |
| R22 | Project Narrative. The project narrative shall clearly demonstrate the offeror's understanding of the project scope by including the following information: 1) Project synopsis (description) 2) Proposed method of accomplishing the work 3) Type of site field verification performed 4) Anticipated user impacts 5) Protection of government property during construction 6) Supplemental drawings/sketches 7) In-house design calculations 8) Estimating notes 9) Take-off calculations to justify quantities used in proposal (includes Subcontractor's calculations) 10) Manufacturer supplied drawings / calculations 11) Catalog/product technical information 12) Assumptions 13) Clarifications and exceptions 14) Supporting documentation |
| R23 | Describe capability and commitment to support an on-site management team, including a sole source of responsibility for both design and construction of this project IAW Section 3.12. Contractor Personnel Requirements and 3.12.5.1 to 3.12.3.2 Design Program Manager within the SOW. |
| R24 | Describe how your organization will manage, supervise, and coordinate the subcontractor's work and who in the organization will be responsible for this management and coordination that is required IAW all Section 3.12.6 of the SOW. |
| R25 | Describe how warranty support, unforeseen site conditions, design errors, etc. will be handled by your organization IAW the Warranty of Construction Clause FAR 52.246-21and the Differing Site Condition Clause FAR 52.236-2. |
| R26 | Provide a Team List of the primary point of contacts IAW Section 3.12 Contractor Specific Requirements within the SOW. |
| R27 | In the price volume, the offeror shall provide a fully supported price proposal. Compliance with these instructions is mandatory and failure to provide all the required data may result in an offeror being determined ineligible for award. The offeror shall provide a detailed price proposal describing each element of the design and construction effort. Design and construction price shall be provided IAW the contract line item (CLIN) structure as requested in the OPR. |
| R28 | All pricing information shall be addressed ONLY in the Price Proposal and Order Documentation volumes. Work hour estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or design and trade-off decisions. |
| R29 | Price Volume Cover Sheet. The price volume shall include a cover sheet containing date, OPR number, project number and title, offeror contact information, CLIN prices and the total price. |
| R30 | Construction price proposals shall be detailed enough for government reviewers to determine the contractor's understanding of the work to be performed and that the proposal is complete (includes all work items included in the order). Price proposals shall be broken down to at least CSI Level IV. |
| R31 | The offeror shall provide supporting documentation which demonstrates how the offeror arrived at the proposed price. Documentation the offeror shall submit are listed below. This includes but is not limited to: 1) Subcontractor quotes 2) Supplemental drawings/sketches 3) In-house design calculations 4) Estimating notes 5) Take-off calculations to justify quantities used in proposal (includes subcontractor calculations 6) Manufacturer supplied drawings/calculations 7) Catalog/product technical information |
| R32 | Subcontractor quotes should be based on the best value offered from at least two vendors. |
| R33 | Contractor shall provide a copy of the quotes as part of the proposal package. |
| R34 | In the event that the minimum of two (2) acceptable vendors cannot be obtained (only one supplier, potential suppliers/subcontractors are unresponsive or respond with 'no bid', etc.), a justification for the single quote shall be submitted as a part of the proposal package. |
| R35 | Offerors shall provide rationale for any proposed CLIN price increase greater than 5% from one year to another, or any proposed CLIN price decrease from one year to another. |
| R36 | If applicable, the offeror shall clearly state the design and non-design fees in accordance with DFARS 236.606-70. |
| R37 | All dollar amounts shall be rounded to the nearest cent. All rates shall be rounded to four decimal places to the right of the decimal point. |
| R38 | Provide assumptions regarding usage of all government property as reflected in your pricing proposal. |
| R39 | The offeror shall provide required information to complete clauses as required. Offerors shall ensure that all clauses and provisions that require "fill-in" information are appropriately completed, including the proposed prices associated with the contract line items in the Schedule of the OPR. |
| R40 | Bid Guarantee (Bond): A bid guarantee (minimum of 20% of proposal) is required IAW FAR 28.101-1. Failure to furnish a bid guarantee in the proper form and amount may be a cause for rejection of your bid. |
| R41 | The proposal acceptance period (validity) is specified on the SF 1442, block 13d of the model contract/solicitation. The offeror shall make a clear statement in the proposal documentation that the proposal is valid until this date. |
| R42 | Provide the name, title, telephone number, and email address for the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the government. |
Recent awards in NAICS 238190
The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-07-21 | JP SOLUTION LLCDepartment of the Army · RESTROOM DEMOLITION AND INSTALLATION OF NEW CONCRETE RESTROOM FACILITY, LAKE SIOG, EAST BRIMFIELD LAKE, HOLLAND, MA | $267,245 |
| 2026-07-16 | NORTHBRIDGE ADVISORYDepartment of the Army · LD7 SLAB CONCRETE LEVELING REPAIR | $17,245 |
| 2026-07-07 | PRECISION INDUSTRIAL SERVICES, INC.Department of the Army · THE PURPOSE OF THIS PROJECT IS TO REMOVE EXISTING FLOORING IN THE CREW CHIEF ROOM OF BUILDING 101 AND INSTALL A NEW MULTI-LAYER EPOXY COATING SYSTEM. THIS IS A COMMERCIAL CONSTRUCTION PROCUREMENT. | $24,173 |
| 2026-05-20 | MISCELLANEOUS FOREIGN AWARDEESDepartment of the Army · //THIS IS A CONTRACT EXECUTED UNDER THE HOST NATION ABG75 CONSTRUCTION PROGRAM. ACWS VERSION FOR ELECTRONIC ACCOUNTABILITY AND INTERFACES ONLY. ORIGINAL IS IN HN FORMAT. | $9.00 million |
| 2026-05-11 | ISCANI INDUSTRIES LLCDepartment of the Air Force · KC-135 SIL FUSELAGE WALL IN ACCORDANCE WITH PWS | $29,913 |
| 2026-04-21 | CAIN CONSTRUCTION, LLCDepartment of the Army · THE PURPOSE OF THIS BPA CALL IS TO REMOVE AND REPLACE SELECTED CARPET AND COVE BASE IN B-1006. | $44,461 |
Source: USAspending.gov, retrieved 2026-10-18. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.