05 January 2027 (38 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • The link can be found at: https://www.wbdg.org/FFC/AECCAD/ERDCITL_TR12- 6_r6.pdf The minimum font size on drawings shall be 1/8” when plotted on full size drawings, (24” x 36” or larger).
  • 4.26 Digital Document Requirements: In order for this installation to accommodate electronic in- house project submittal review, the A/E is required to submit the documents in digital formats, a copy of each drawing sheet in AutoCAD *.dwg format and PDF format.
  • The plan shall be submitted to the Contracting Officer’s Representative to be reviewed by the Base Civil Engineering Squadron.
  • 4.15.3 Upon completion and acceptance of the SWPPP the contractor shall complete and submit a Notice of Intent (NOI) to the NPDES Storm water Notices Center to obtain permit coverage.
  • 4.15.4 No sitework shall commence until the NOI has been submitted and accepted by the State.
  • (1) A claim by the Contractor shall be made in writing and submitted to the Contracting Officer for a written decision.
  • The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”. c.
  • The Contractor shall provide a soil analysis report containing test readings and soil amendment recommendations.
  • The soil analysis report shall include percent of organic matter, pH, potassium, phosphorus, calcium, magnesium levels, nematode count, and soil amendment recommendations (N-P-K).
  • Fertilizer and other soil amendments shall be applied as recommended in the soil analysis report to provide healthy sod.

Requirements

IDRequirement
R1The Contractor shall be responsible for all conflicts that arise from coordination of design and construction. The contractor shall submit a request for information (RFI) when there is a conflict between this SOW and criteria/ standards. The contractor shall adhere to all applicable criteria as specified below.
R2The Contractor shall provide all management, labor, tools, equipment, materials, transportation, supervision, and other necessary services to design and construct playgrounds at the Keesler AFB Child Development Center (CDC) and Youth Center (SAC/YP), to include all associated Optional Bid Items (OBIs) as defined herein.
R3All work and deliverables shall be completed in strict accordance with this Statement of Work (SOW) and shall comply with all applicable Department of the Air Force (DAF) regulations and Child and Youth Programs (CYP) standards. The Contractor shall retain sole responsibility for the performance, quality, and compliance of all deliverables throughout the life of the contract.
R4The Contractor shall perform 100% design services for the Playgrounds construction and all four (4) associated Optional Bid Items (OBIs) listed under Section 3.3.
R5All designs shall comply with applicable Department of the Air Force (DAF), Department of War (DoW), Unified Facilities Criteria (UFC), and national safety standards for child development and youth playground spaces.
R6Preschool Playground Construction: The Contractor shall construct the core preschool playground area in strict accordance with the approved 100% design package.
R7Government-Furnished Equipment (GFE) Installation: The Contractor shall receive, inventory, secure, assemble, and install all GFE playground equipment in the designated preschool playground area. The Contractor shall ensure all GFE installations meet manufacturer specifications and safety certifications.
R8Contract will be required to perform a Site and Topographical Surveys that will include the following: property lines, utility locations, easements, setbacks, all structures above and below grade, trees, wetlands, environmentally protected areas, streets, roads, etc. and provide finish contours as needed and required for completion of designs.
R9The Contractor is required to verify all site and topographical surveys and other existing conditions.
R10First Deliverables will be completed as a hard copy of the drawings, two half-size set drawings for Keesler AFB Civil Engineering Squadron (CES) and Force Support Squadron (FSS) and two half-size set drawings for Air Force Services Center (AFSVC). Additionally, Keesler AFB CES, FSS, and AFSVC will be provided with PDF and AutoCAD *.dwg format as well.
R11Where required ramps shall be provided for handicapped access (only required for CDC Preschool Playgrounds, SAC Playgrounds, YP Playgrounds, and the YP/SAC Playground and Basketball Court), if necessary, due to grades. The site access for the physically disabled shall be as required by Architectural Barriers Act (ABA).
R12All pedestrian sidewalks are required for all playgrounds. Sidewalks shall be provided for emergency evacuations and to connect play areas. Sidewalks shall not have steps nor be blocked by buffers, portable items, or barriers of any kind. Existing sidewalks connecting operational areas, parking areas, streets and other walks as pedestrian traffic demands shall be maintained. All sidewalks shall be subject to use by the physically handicapped. Accessibility requirements for the paths shall not exceed 2 percent cross slopes and 5 percent longitudinal slopes and ABA standards shall be maintained. Sidewalks shall be firm, stable, and slip resistant. An accessible route shall connect all areas within the Accessible Playgrounds.
R13Turning Radius Outside of each CDC Child Activity Room – Sidewalks shall be firm, stable, and slip resistant. An accessible route shall connect all areas within the playground. A minimum walk width of 5 feet shall be maintained. Exit doors swinging outward shall have a minimum sidewalk radius of 5-feet following the door swing to ensure evacuations can take place with the door ajar. Sidewalks shall be Portland cement concrete unless noted otherwise.
R14If any portion of the emergency evacuation sidewalk route is new or proposed, the minimum walk width of five feet shall be maintained and shall allow use for children using a wheelchair or crutches. Evacuation sidewalks shall not be blocked by gates, buffers, portable items or barriers of any kind.
R15If any portion of the existing fence is required to be replaced and/or altered per the requirements of this SOW, the new fence shall match the type and height of the adjacent existing perimeter fence, and the fence posts shall be installed to face the outside of the outdoor play environment. Note: if the existing fence does not meet the standards outlined below the Contractor will submit a RFI to determine how to move forward.
R16A means shall be employed to ensure that no gap is between the bottom of the new fence and the ground. A 6-inch-wide concrete mow strip will be installed with the fence's vinyl-coated selvage extending below the bottom fence rail and underground, into the trench where the concrete is poured. This embeds the selvage in the concrete, preventing animals from digging under the fence and protecting it from lawn equipment. The top of the curb shall be flush with adjacent surfaces to allow for sufficient water run off after rainfall. Space between the new fence components and the facility, as well as any other space large enough to cause entrapment, shall not exceed 3.5 inches. No more than two threads of the inside bolt shall be visible; cut off bolt threads to eliminate injury. When attaching the new fence fabric, the bolt head shall face the inside of the outdoor play environment. The new fence shall be a minimum height of six feet, unless noted otherwise. All fence components shall be vinyl coated in a black, brown, tan or green color that complies with the Keesler AFB Architectural Compatibility Guide Standards.
R17To deter uncontrolled vehicles from damaging the existing and/or new perimeter fence and entering the outdoor play environments, the Contractor shall use bollards, raised planters, trees and/or other devices where the existing and/or new perimeter fence is located adjacent to access drives or base roadway system. Where additional force protection measures are required, the Contractor shall use Keesler AFB approved devices to protect each playground. Berms and ditches shall not be permitted as a force protection measure.
R18A double wide gate with a minimum clear width of 12 feet wide shall be installed for maintenance and emergency vehicle access into each outdoor play environment. The double-wide gate shall be installed in locations acceptable to Keesler AFB for maintenance access. Contractor shall coordinate with Keesler AFB Fire Department.
R19Personnel gates a minimum of 44 inches wide shall be installed allowing access out of each outdoor play environment. The personnel gates shall swing in both directions and shall be outfitted with handles/latches that allow opening the gate in one motion. Handles/ fork latches shall be installed at exactly 48 inches in height above the ground.
R20Playground Material Preference: A wood fiber-polymer composite material made of a minimum of 95% recycled materials. These shall be: Low-maintenance – no sanding, seal, or painting. Durable – resistant to rot, fading, staining, mold, splintering, and termites. Resists wear, fading, and the growth of mold and mildew. Fasteners are installed between deck boards, keeping the walking surface smooth and unblemished.
R21Contractor shall install furnished playground equipment in accordance with manufacturer's recommendations and must ensure that all equipment installation meets Consumer Product Safety Commission (CPSC) and American with Disabilities Act (ADA) guidelines for acceptability for Public Playgrounds. Contractor shall install new concrete in preparation for new poured-in-place fall protection impact surfacing (government furnished) under playground equipment and throughout the existing fall protection area. Surfacing must meet CPSC guidelines for acceptability of unitary material for impact surfacing around playground equipment. Contractors must ensure depth of surfacing meets critical height requirements for installed and modified playground equipment. The poured in place, two-course, ADA compliant, fall protection impact surfacing shall be not less than two- and one-half inches (2-1/2”) thick, thicker if required, and shall be tapered to grade at the existing concrete expansion joints forming the perimeter of the playground. Contractor will ensure a 2% slope on all play surfaces and concrete surfaces for drainage. Completed Impact Surfacing shall be free draining without surface water ponding. Contractor is to provide number and type of drain per site specific climate and soil conditions. Contractor must provide (AFSVC) with a letter certifying playground equipment meets above criteria.
R22The subgrade for sidewalks shall be formed by excavating to the required depth, and shaped to the proper cross section, and shall be thoroughly compacted by rolling or tamping before placing any concrete to 95% compaction. Contractor shall plan and protect his work in a manner which will ensure satisfactory results. Any concrete damage by freezing shall be removed and replaced by the Contractor at his own expense.
R23Specified compressive strength f ‘c shall be a minimum of 3,000 psi at 28 days for all structural concrete. Mix designs shall include recycled materials, such as fly ash and ground granulated blast furnace slag, to the maximum extent possible. Reinforcement shall comply with ASTM A615, Grade 60 minimum. Structural plain concrete is not permitted.
R24The reinforcing of foundations shall be continuous and therefore, typical details showing the arrangement of reinforcing at corners and intersections of these members shall be shown on the drawings.
R25In no case shall a slab-on-grade be less than 4 inches thick. A minimum of 0.15 percent welded wire mesh or reinforcing bars shall be provided in each direction in slabs, placed 1 inch clear from the top of slab. Welded wire fabric in flat sheets or deformed reinforcing bars shall be used. Slabs-on-grade shall be placed in lanes. The area bounded by crack control joints shall not exceed 625 square feet, and the distance between parallel crack control joints shall not exceed 25 feet. Crack control joints may be construction joints, contraction joints, expansion joints, or isolation joints.
R26Exterior steel embedded in concrete for such purposes as exterior railing, handrails, fence, base plates, anchor bolts, etc. shall be hot-dipped galvanized unless otherwise directed.
R27Grading shall be in accordance with UFC 3-201-01 and Section 438 of the Energy Independence and Security Act of 2007 (EISA).
R28Erosion and sediment control BMPs shall be in place and approved by the Contracting Officer’s Representative prior to initiating any work. Dewatering projects that discharge into surface waters or storm water systems are required to operate under the coverage of NPDES and/or similar permits. The Contractor shall obtain the necessary permit(s) for any groundwater discharge off site and shall operate in compliance with the permit.
R29Grades for the Accessible Playgrounds shall be in accordance with UFC 3-210-06A, Site Planning and Design, FC 4-740-14F, and UFC 4-740-06. Positive drainage must allow water to drain away immediately after rain events. The slopes for the grassed areas within the Accessible Playground shall be a maximum of 1 percent cross slope and 5 percent longitudinal to provide positive drainage.
R30The Contractor shall provide finish grade contours at 1-foot intervals, and spot elevations to construct all site development features to elevations within the above grading criteria and tolerances as specified in the guide specifications. Spot elevations on the drawings shall be sufficient so that interpolation between contours is not required for structures, grading or paved areas; some examples are corners of paved areas, low points, high points, flow lines of swells or ditches, changes in degree of slope and grading at corners of the facility to ensure positive drainage away from the facility. The use of cut or fill symbols in lieu of finish grade contours is not permitted.
R31Contractor shall provide a survey to include existing conditions and locations of existing structures and utilities at the time the survey is performed. Utilities not shown on the plans may be present on-site and it is the responsibility of the Contractor to obtain information for these utilities. The Contractor shall provide surveying as necessary to locate the utility items prior to initiating demolition work. All demolition of utilities shown on the plans is approximate. Limits of demolition shall be determined by the Contractor, and approved by Contracting Officer’s Representative, to ensure utilities remain operable throughout construction. Abandoned or existing utility lines found to be under the site or interfere with the project shall be coordinated with the Contracting Office Representative. Removal and/or relocation shall be at Contractor’s expense.
R32The Contractor shall verify actual locations of all placed utilities and shall coordinate with the Government regarding any future planned utility installations that affect the work. Coordination of all site work on the project, including utility work, is the responsibility of the Contractor. It is the Contractor's responsibility to confirm the specific locations of all existing utilities prior to commencing work. All sanitary sewers, storm water, water supply, gas, and electrical construction shall be in strict compliance with local and Base requirements. The Contractor shall obtain all required Base, City, County and State permits for installation and operation of all utilities. Any anticipated utility outages shall be coordinated with the Contracting Officer’s Representative at least 72 hours in advance. Any utilities or equipment that needs to be relocated to construct the facility shall be accomplished in such a manner as to minimize the impact on the existing facilities. No physical connections shall exist between sewer and water supply systems.
R33All utility connections shall be coordinated with the Contracting Officer’s Representative.
R34Backflow prevention valves, post indicator valves, transformers, electric switches, telephone/cable boxes, manholes, etc., shall be placed in locations not immediately apparent to the facility users or personnel passing by the site.
R35Every linear foot of underground metallic piping shall be identified with plastic marking tape specifying the type of pipe buried under it. Every linear foot of underground non-metallic piping shall be identified with metallic tape manufactured specifically for warning and identification of underground utilities. The metallic tape shall be detectable by electronic detection instruments and shall indicate the type of pipe buried under it. The tape shall be buried 12 inches above the pipe. Tape Color: Red - Electric; Orange - Telephone, telegraph, television, and communications; Blue - Water systems; Green - Sewer systems; Yellow - Gas or other dangerous materials
R36All excavations, trenches, open manholes, etc., shall be properly shored, braced, barricaded, or guarded. The Contractor shall provide barricades and maintain warning lights or other illumination from sunset to sunup at all excavations that are adjacent to pedestrian or vehicle thoroughfares or as directed by the Contracting Officer’s Representative.
R37Contractor personnel shall not enter manholes, tunnels, tanks, or confined spaces until such entry complies with the requirements of OSHA.
R38Contactor is responsible for all required permits. The Contractor shall obtain all necessary permits for Storm Water Management, Digging, Erosion Control, Clean Water Act, and National Pollutant Discharge Elimination Systems Permit (NPDES) for work on the base prior to any land disturbing activities as prescribed by the respective permit. Any permit work done by the Contractor shall be at no additional cost to the Government.
R39The Contractor shall be responsible for proper care and watering of grass, shrubs, trees, and ground cover, from the beginning of the operation and continuing until the Government accepts the facility. The Contractor is required to provide a warranty for two months (60 days) following beneficial occupancy date (BOD) for all trees and sod that have been procured and installed by the Contractor.
R40Turf preparation shall include eradication of unwanted vegetation and the use of a pre-emergent granular herbicide. Existing grass areas within the project limits not designated as existing to remain, shall be replaced with new solid sod. The existing grass in the areas designated as new nature areas shall be removed and graded according to the plans. SOD will be Geo Zoysia
R41All scarred and graded areas to receive grass shall be solid sodded with new sod (native to area and withstands high traffic). Edging shall be provided between grassed areas and all landscape planting beds, trees, and bushes. Contractor shall consult with base turf manager to determine the most suitable grass for the application.
R42Contractor shall maintain as much of the existing vegetation as possible. Vegetation to remain shall be protected during construction. Contractor shall also replace any damaged vegetation at their own expense. Includes but not limited to: sod, trees, shrubs, etc.
R43Contractor shall prepare a written maintenance plan and obtain approval from the COR. The plan shall include basic plant care such as watering, mowing, weeding, trash collecting, erosion control, plant replacement, pruning, and insect and disease control.
R44The contractor shall schedule and conduct a “50% Design” review at Keesler AFB with representatives of the CES, FSS, and AFSVC Child and Youth Programs (CYP) and Capital Improvements (VMX). NOTE: AFSVC will attend virtually. The presentation product shall be the 50% design with drawings reflecting resolution of the design agreed to by all participants.
R45The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed (i.e. State of Mississippi).
R46The contractor shall submit a bound report, with drawings, finalizing the design intent as developed and approved by the design team incorporating all comments. The report shall include all the comments from the 50% review meeting.
R47The contractor will prepare and submit for approval construction drawings, specifications, and other related and supporting documents. The contractor will incorporate 95% review comments as part of completing the 100% design submittal. The contractor shall prepare this submittal so that it is 100% complete. If this submittal is not complete, it will be rejected, and the contractor shall resubmit at no cost to the Government.
R48The contractor shall make 50%, 100% and Corrected 100% submissions, as directed in this SOW. Content and format of deliverables are described in subsequent sections of this SOW. Any submittal that does not meet the requirements of the Contract and/or the SOW will be rejected, and the contractor shall resubmit acceptable documents at no additional cost. Every resubmittal shall include deliverables in their entirety, including pages or sheets that did not change from their previous submittal. All submittals and Requests for Information (RFIs) processed and answered by the Designer of Record (DOR) during this phase shall be forwarded to the Government for final review and approval
R49All documents and correspondence shall be in English in accordance with FAR 252.225-7041. Listed below are the documents necessary for each of the submittals. This list represents the minimum amount of information required and is not necessarily all inclusive. Submittals shall be sent as one complete package. Items may be separated in multiple containers for shipping ease but not sent on multiple dates.
R50Final submittal must be 100% complete documents (ready-to-advertise [RTA] package), requiring only overview to ensure incorporation of all submittal review comments; all construction documents must be fully coordinated, dimensioned, detailed, noted, and cross-referenced.
R51Submittal Matrix: Agency 50% 100% Corrected, 100% (RTA) Each agency listed below will require one set ½ size and CD: Keesler AFB CES; Keesler AFB FSS/CD; Keesler AFB FSS/VCY; AFSVC/VCA; AFSVC/ VMX; Keesler AFB Contracting Office
R52Submittals should be shipped in complete packages unless authorized in advance by AFSVC. All submittals shall be shipped via priority mail for delivery by the scheduled Submittal date. Coordinate POCs for submittal delivery.
R53In addition to a hard copy of the drawings, provide designated government stakeholder Points of Contact (POCs) a copy of each drawing sheet in AutoCAD *.dwg format and PDF format.
R54Folder “SPECIFICATIONS”: For all submittals, provide all specification sections in separate files in the current release of Microsoft Word (.doc) format. The Cover Sheet and Table of Contents shall also be provided as separate (.doc) files.
R55All submitted CDs and DVDs shall have a printed label affixed to them. Handwriting is not allowed. Each label shall include the following information: • Keesler AFB SAC/YP • Name of Project or Building Type Playgrounds • Base CE Project Number (If Applicable) • Submittal Percentage • Date of Submittal • Name of A/E Firm
R56All meetings shall be coordinated a minimum of two (2) weeks in advance with the schedules of AFSVC/VMX and AFSVC/VCA representatives. Any change to the schedule must be coordinated a minimum of five (5) business days prior to the meeting.
R57Contractor needs a minimum of five years’ experience in playground construction.
R58Contractor needs a minimum of three years’ specific experience in playground maintenance.
R59The contractor will provide all equipment and storage media necessary to perform tasks.
R60Use of existing toilet facilities in the immediate work area will not be permitted.
R61The Contractor must make his/her request to the Contracting Officer five (5) calendar days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces.
R62The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract at least the insurance coverage as stated in this contract. In no event shall the coverage be less than the minimum requirements established by applicable state and local regulations and laws for the risk associated with the services to be provided by the contract.
R63The Contractor, its employee(s) or representative(s) working under this contract agree(s) not to possess or use any illicit substance(s) while performing on the site(s) of this contract whether on military installation(s) or Federal property(s).
R64The Offeror represents that- (1) It □ will, □ will not provide covered telecommunications equipment or services to the NAFI in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (d)(1) of this section if the Offeror responds “will” in paragraph (c) (1) of this section; and (2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (d) (2) of this section if the Offeror responds “does” in paragraph (c) (2) of this section.
R65The Offeror represents that it □ does, □ does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument. After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it □ does, □ does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.
R66The Government will not make award to an offeror unless the offeror, by checking the appropriate block, certifies to either paragraph (c)(1) or paragraph (c)(2) of this provision. (1) □ The offeror will not supply any end product listed in paragraph (b) of this provision that was mined, produced, or manufactured in a corresponding country as listed for that end product. (2) □ The offeror may supply an end product listed in paragraph (b) of this provision that was mined, produced, or manufactured in the corresponding country as listed for that product. The offeror certifies that it has made a good faith effort to determine whether forced or indentured child labor was used to mine, produce, or manufacture such end product. On the basis of those efforts, the offeror certifies that it is not aware of any such use of child labor.
R67The Offeror represents that it will not provide covered items as part of its offered products to the NAFI in the performance of any contract, subcontract or other contractual instrument.
R68The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.Section I (contract clauses)

Recent awards in NAICS 238990

The newest federal contract awards in the same industry code from Department of Defense, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-09-30ZZ CONSTRUCTION, INC.Department of the Air Force · HHEK234029 REPAIR 32ND ST GATE$350,566
2026-09-30ZZ CONSTRUCTION, INC.Department of the Air Force · HHEK241004 REPAIR 28TH ST GATE$300,734
2026-09-11GOAD COMPANYDepartment of the Air Force · PZIMA - HIGH PRIORITY - L7-090 REPAIR AND LINER - CHEMICAL STORAGE TANKS$32,355
2026-09-01FEDERON PROCUREMENT SOLUTIONSDepartment of the Air Force · 5 MXS IS REQUESTING THE MAINTENANCE, REPAIR AND PARTS FOR THEIR EXISTING FALL PROTECTION SYSTEM.$61,990
2026-08-03T J PAINTING & CONTRACTING LLCDepartment of the Army · FURNISH AND INSTALL FENCING AND GATES.$36,360
2026-08-03PROESL BAU GMBHDepartment of the Army · SEE SECTION J FOR ATTACHMENTS$910,728

Source: USAspending.gov, retrieved 2026-11-21. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.