Analytical Services: requirements and submission rules
15 requirements and 6 submission rules found in the solicitation documents for BSA478026-Solicitation. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- 4.0 FORMS OF QUOTATION AND MANNER OF SUBMISSION A complete quotation, including the signed Quotation Pricing Sheet (Enclosure C) and Fee Schedule (Enclosure C1), must be received by BSA no later than the due date and time listed on page 1 of this RFQ.
- Questions Due Date: 11/30/2026 Quote Due Date & Time: 12/14/2026 Contract Type: Firm-Fixed Price Payment Terms: Net 30 for Large Business and Net 10 for Small Business
- Quotations, including their withdrawal or modification, received after the closing date shall be considered late.
- BSA will only accept email submissions of formal quotations: Email submissions must include the signed Quotation Pricing Sheet (Enclosure C) and Fee Schedule (Enclosure C1).
- All questions must be submitted via email.
- Foreign vendors are not required to be registered in SAM but must fill out AMS-Form-050 (Enclosure B).
Requirements
| ID | Requirement |
|---|---|
| R1 | It is the responsibility of the Offeror to affirm its Representations and Certifications and size status are accurate and up to date in the System for Award Management (SAM) (www.SAM.gov). |
| R2 | The Offeror shall furnish all labor, services, materials, and equipment in strict accordance with the attached Draft Purchase Order (PO)/Contract (Enclosure A). |
| R3 | Accordingly, the Offeror must furnish as part of the offer all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the Company to (i) determine whether the product offered meets the salient characteristics requirements of the solicitation, and (ii) establish exactly what the Company would be binding itself to purchase by making an offer. |
| R4 | The Contractor shall be a laboratory possessing a current certification by the New York State Department of Health (NYSDOH) under the Environmental Laboratory Approval Program (ELAP), to analyze for potable, non-potable, and solid/hazardous waste categories for chemical analysis, and/or certification for potable and non-potable categories for radiological analysis and national certification under NELAP. Must provide a copy of current NYSDOH certification under the ELAP. |
| R5 | The Contractor shall be a participant in both Water Pollution (WP) and Water Supply (WS) studies administered by National Institute of Standards and Technology (NIST) approved providers for chemical parameters. In addition, all laboratories that perform radionuclide analyses shall participate in the DOE Mixed Analyte Performance Evaluation Program (MAPEP). Must show proof of participation in Water Pollution (WP) and Water Supply (WS) studies administered by National Institute of Standards and Technology (NIST) provider. Must show proof of participation in the DOE Mixed Analyte Performance Evaluation Program (MAPEP). |
| R6 | The Contractor shall be a participant in New York State Department of Health ELAP Non-potable Water, Potable Water, Solid and Hazardous Waste, radiological and non-radiological analytes; the United States Department of Energy, Environmental Measurements Laboratory Quality Assurance Programs, Radiological samples, Air, Water, Soil, Vegetation; and the Environmental Resource Associates Water Pollution, Water Supply, and Radiological. The contract lab shall also participate in the National Pollutant Discharge Elimination System (NPDES) QA Proficiency Evaluation. Must provide proof of participation in New York State Department of Health ELAP Non-potable Water, Potable Water, Solid and Hazardous Waste, radiological and non-radiological analytes proficiency evaluation. Must provide proof of participation in the United States Department of Energy, Environmental Measurements Laboratory Quality Assurance Programs, Radiological samples, Air, Water, Soil, Vegetation Department of Energy Audit Program—Accreditation Program (DOECAP-AP). Must provide proof of participation in the Environmental Resource Associates Water Pollution, Water Supply, and Radiological profiency evaluation. Must provide proof that the contract lab participates in the National Pollutant Discharge Elimination System (NPDES) QA Proficiency Evaluation. |
| R7 | The Contractor should have a DOE Consolidated Audit Program-Accreditation Program (DOECAP-AP) assessment to satisfy DOE order 435.1 Radioactive Waste Management, and DOE order 414.1D, Quality Assurance, or in lieu of DOECAP-AP be audited to confirm compliance to QC requirements of DOE order 414.1D and 435.1. |
| R8 | The Contractor shall submit all proficiency results for the past two years in Section 4.0 of the bid proposal. Proficiency results shall include all tests mentioned in Sections 4.2 and 4.3 of this SOW. |
| R9 | For consideration regarding the Limited Radiologic and Full-Service contracts, the Contractor shall possess a valid Nuclear Regulatory Commission (NRC) or Agreement State Byproduct or Radioactive Material License. The Contractor shall ensure that the maximum quantity of radioactive material specified in this license is sufficient to allow possession of the radionuclides and activity levels contained in the anticipated samples without exceeding the laboratory’s licensed amounts (Nuclear Regulatory Commission’s Title 10 CFR Part 30). Provide proof of only one of the following: a. Valid Nuclear Regulatory Commission (NRC); b. Agreement State Byproduct license; or c. Radioactive Material License. Provide proof that the maximum quantity of radioactive material specified in license is sufficient to allow possession of the radionuclides and activity levels contained in the anticipated samples without exceeding the laboratory’s licensed amounts (Nuclear Regulatory Commission’s Title 10 CFR Part 30). |
| R10 | The Contractor shall provide its current approved QA/QC Manual and all applicable procedures to BSA for review. |
| R11 | Pricing must be filled in for the base year and each option period for both (Enclosure C) and (Enclosure C1). |
| R12 | The Offeror shall complete and return the Quotation Pricing Sheet (Enclosure C) and Fee Schedule (Enclosure C1) attached to this document. Prices shall be all inclusive and quoted in U.S. dollars, FOB, Brookhaven National Laboratory, Upton, Long Island, New York (freight included), including any import duties, customs, and associated costs, if applicable. |
| R13 | A current copy (less than 12 months prior to the date of solicitation) of Supplier Specific Representations & Certifications AMS-Form-050 (Enclosure B) must be on file with BSA’s Procurement and Property Management (PPM) Division before a purchase order/contract can be placed. ... At the time of award, the successful Offeror will be asked to complete AMS-Form-050 (Enclosure B) if it is not already on file. |
| R14 | All Offerors certifying that they are other than a “small business or foreign business” and that they expect to submit an offer that will exceed $900,000 must submit a Small Business Subcontracting Plan for BSA’s approval prior to contract award. ... Note: If the Offeror can certify that the there are no subcontracting opportunities in the work to be performed under this contract, they will need to fill out AMS Form-001, entitled “Subcontracting Plan Waiver,” prior to contract award instead of submitting a Small Business Subcontracting Plan. |
| R15 | The successful Offeror will be required to complete the following forms (if applicable): • Vendor ACH Authorization Form, Enclosure D. • W-9 Form, Enclosure E. • W-8 Form, Enclosure F, will need to be completed in lieu of the W-9 Form if Vendor is foreign. |
Recent awards in NAICS 541380
The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-09-30 | SOUTHWEST RESEARCH INSTITUTEDepartment of Energy · TITLE - TECHNOLOGY SHOWCASE FACILITY AND SUPPORT SERVICES FOR ARPA-ES COOLERCHIPS PROGRAM | $281,653 |
| 2026-09-11 | ELECTRONIC METROLOGY LABORATORY, LLCDepartment of Energy · ONSITE CALIBRATION OF TEST, MEASUREMENT AND DIAGNOSTIC EQUIPMENT, WESTERN AREA POWER ADMINISTRATION | $68,412 |
| 2026-07-02 | SAYBOLT LPDepartment of Energy · OPTION YEAR 3, COMPREHENSIVE ASSAY ON BAYOU CHOCTAW SWEET CRUDE SPR SITE. | $31,015 |
| 2026-05-27 | SAYBOLT LPDepartment of Energy · OPTION YEAR 3 CRUDE OIL INSPECTION, ANALYSIS, AND COMPREHENSIVE ASSAY FOR CAVERN BM 001 AT BRYAN MOUND SPR SITE. | $43,390 |
| 2026-03-22 | AMERICAN ASSOCIATION FOR LABORATORY ACCREDITATIONDepartment of Energy · LABORATORY ACCREDITATION SERVICES FROM A2LA. | $21,925 |
| 2025-12-08 | SAYBOLT LPDepartment of Energy · COMPREHENSIVE ASSAY, INSPECTION ANALYSIS, AND BRINE ANALYSIS TESTING SERVICES FOR SPR CAVERN NO BM 107C | $41,325 |
Source: USAspending.gov, retrieved 2026-11-14. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.