TenderAxiom

TenderAxiom · Opportunities

SEPA PARKING LOT REPAVING AND REPAIRS: requirements and submission rules

56 requirements and 11 submission rules found in the solicitation documents for 89503511102026. Use them as the start of your compliance matrix.

Solicitation number
89503511102026
Agency
ENERGY, DEPARTMENT OF / ENERGY, DEPARTMENT OF / SOUTHEASTERN POWER ADMINISTRATION
NAICS
238990
Set-aside
No Set aside used
Responses due
15 December 2026 (17 days)
Official notice
View on SAM.gov

Submission rules that can disqualify a bid

  • Deadline for submission of all questions will be December 4, 2026 @12:00 pm Eastern time and Deadline for responses will be December 9, 2026, on Sam.gov
  • Please submit all proposals to the CO via email at: tabitha.rambert@sepa.doe.gov l or via mail to:1166 Athens Tech Rd Elberton, GA 30635 before Bid Submission Deadline: 3pm Eastern Time on December 15, 2026.
  • Additional information was added for: subcontractors,bid guarantee, updated period of performance, clarified bid submission deadline, limits for certificate of insurance
  • All proposals must be received by December 15, 2026, no later than 12:00 p.m.
  • The bid guarantee must be received by the Government no later than the date and time established for receipt of offers.
  • Bid Submission Deadline: 12:00 pm (Noon) Eastern Time on December 15, 2026
  • The successful Offeror shall submit the executed bonds to the Contracting Officer within ten (10) calendar days after contract award, unless otherwise authorized in writing by the Contracting Officer.
  • Contractors must maintain active registration in the System for Award Management (SAM) at www.sam.gov, consistent with applicable FAR requirements, to be eligible for contract award.
  • Offeror must be registered in the System for Award Management, SAM, https://www.sam.gov/.
  • All offerors who bid on Federal Government Contracts are required to be registered in SAM, keep the registration current, an update annually.
  • Please note that this RFP or submitted bids do not constitute a contract, and we reserve the right to accept or reject any or all proposals received.

Requirements

IDRequirement
R1All questions, requests for clarification, or inquiries concerning this solicitation shall be directed to both designated Contracting Officers: Tabitha Rambert, Contracting Officer Juvonna Mattox, Contracting Officer
R2Make existing ditches functional at Athens Tech Drive and on northeast side of building at adjacent school property. Remove overgrowth of vegetation (excluding trees) and debris in existing swales and ditches to ensure functional surface drainage to adjacent properties and right-of-way.
R3Remove debris from existing trench drains and ensure trench drain functionality.
R4Sweep and Clean: Thoroughly clean the entire parking lot surface using commercial blowers and broom sweepers to remove all dirt, debris, and vegetation in paved areas.
R5Oil Spot Treatment: Clean and prime oil/grease spots with a designated primer to ensure proper sealant adhesion.
R6Pressure wash existing curb and gutter and sidewalks.
R7Sawcut, remove and replace to match existing approximately 12 linear feet of 24-inch concrete curb and gutter affected by water line damage at southeast corner of building.
R8Sawcut and remove any damaged existing asphalt paving above water line damage including sunken asphalt. Repair any damage to soil base. Install GAB as needed to provide adequate base for asphalt. Apply prime coat.
R9Install no less than 2” asphalt above repaired base to match existing surface drainage scheme flush with existing asphalt.
R10Sawcut and remove existing asphalt with alligator cracking Areas to include: Near dumpster approximately 1,000 sf Between waterline damage and concrete aprons at southeast entrance approximately 1,000 sf Near generator at northwest corner of building approximately 150 sf Near deliver entrance at rear of building 50 sf Near northeast corner of building approximately 750 sf Repair any damage to soil base. Install GAB as needed to provide adequate base for asphalt. Apply prime coat.
R11Crack Sealing: Clean cracks larger than 1/8 inch of debris and seal with hot-applied crack sealant not to exceed 5,000 linear feet.
R12Sealcoating: Apply two coats of high-quality asphalt emulsion seal coat to the entire parking lot asphalt surface approximately 55,000 sf.
R13Striping and Marking: Restripe all parking stalls, including ADA-compliant spaces, government vehicle spaces, and directional arrows using durable white traffic paint.
R14All travel to and from Southeastern offices will be provided by the contractor.
R15The Contractor shall comply with Department of Energy (DOE) Safety and Security Orders and Directives, including, but not limited to, the safety requirements defined in all applicable Federal, State and local laws, regulations and ordinances. When questionable, the most stringent shall apply.
R16Contractor personnel shall comply with all applicable provisions of the State Labor and Industries Safety and Health Regulations, U.S. Department of Labor, Occupational Safety and Health Administration (OSHA) Standards 29 CFR 1910 and 29 CFR 1926, Environmental Protection Agency (EPA) Title 40 CFR 170 (Worker Protection Standard) and other applicable Federal, State, and location regulations.
R17Job-related injuries/illnesses to Contractor employees shall be reported to the Technical Representative.
R18The contractor shall implement appropriate safety measures, including barricades, warning signage, traffic control, and restricted access to active construction areas, to protect government personnel, visitors, and property. This includes the use of 811 and taking all reasonable steps necessary to make certain that all active, abandoned, or unknown utilities are identified.
R19The contractor shall comply with all applicable Federal, State, and local laws, regulations, ordinances and codes governing performance of their services on Southeastern premises in Elberton, Georgia, and any other locations specified under the contract.
R20The contractor shall comply with all applicable Federal, State and local safety and health laws, regulations and ordinances, and national standards including 29 CFR 1910.
R21Contractor access, equipment staging, material storage, and construction activities shall be limited to Government-authorized locations. The contractor shall coordinate any required parking lot closures with the designated Government representative.
R22The contractor shall comply with applicable federal, state, and local environmental requirements, including proper handling and disposal of removed asphalt, construction debris, and other waste materials.
R23Please include a building-entry and parking solution for the entire project duration and provide a clear project timeline. Southeastern’s 24-hour operations center must remain accessible at all times.
R24The Contractor shall maintain the required insurance throughout the contract performance period.
R25The prime contractor shall remain fully responsible for the performance, quality, coordination, and timely completion of all work performed by its subcontractors.
R26The Contractor and all applicable subcontractors shall comply with the prevailing wage rates and fringe benefits established by the U.S. Department of Labor for the geographic location and classification of construction covered by this requirement.
R27Pay all covered laborers and mechanics no less than the applicable prevailing wages and fringe benefits.
R28Submit weekly certified payroll records and required statements of compliance in accordance with FAR 52.222-8.
R29Ensure applicable subcontractors comply with all required labor standards.
R30Maintain payroll and employment records as required by the contract.
R31Comply with the applicable labor standards clauses incorporated into the solicitation and resulting contract.
R32In accordance with FAR 28.102 and FAR 52.228-15, the successful Offeror shall furnish performance and payment bonds for any resulting construction contract exceeding $150,000.
R33The Performance Bond (Standard Form 25) shall be in the amount of 100 percent of the awarded contract price.
R34The Payment Bond (Standard Form 25A) shall be in the amount of 100 percent of the contract price awarded.
R35The bonds shall be supported by acceptable sureties or other security in accordance with FAR Part 28.
R36In accordance with FAR 28.101 and FAR 52.228-1, Bid Guarantee, each offeror shall submit a separate bid guarantee with its proposal-offer and is required when performance and payment bonds are required.
R37The bid guarantee shall be specific to this solicitation and in an amount equal to twenty percent (20%) of the total proposed-offered contract price, not to exceed $3 million.
R38The bid guarantee shall be submitted in an acceptable form in accordance with FAR 52.228-1.
R39When a bid bond is submitted, the offeror shall use Standard Form (SF) 24, Bid Bond. The bid bond shall be properly executed by the offeror and the surety. Evidence of the authority of any attorney-in-fact signing on behalf of the surety shall accompany the bid bond.
R40The Contractor shall provide a total firm-fixed price for all labor, equipment, materials, supervision, transportation, disposal, and incidental work necessary to complete the parking lot asphalt repair and repaving project.
R41The Contractor shall notify the Contracting Officer when all asphalt repair and repaving work has been completed.
R42Following completion and Government acceptance of all required work, the Contractor shall submit a final invoice to the contracting offer via email to: Tabitha.Rambert@sepa.doe.gov
R43Each contractor shall submit a complete proposal containing the following information: Detailed Price Quotation: A comprehensive price breakdown identifying the total firm-fixed price and associated costs necessary to complete the project, including labor, materials, equipment, mobilization, site preparation, and other applicable expenses.
R44Technical Approach/Project Plan: A description of the contractor’s proposed methodology for performing the required work, including the anticipated project schedule, equipment, staffing, quality control measures, and approach to meeting the performance requirements.
R45Past Performance: Information demonstrating the contractor’s experience successfully completing projects of similar scope, size, and complexity, including relevant project references (including contract numbers, point of contacts with telephone numbers and other relevant information). Please submit a minimum of three references with your proposal package.
R46The Contractor shall, at its own expense, obtain and maintain insurance coverage throughout the performance of this contract in accordance with FAR 28.306, FAR 28.307-2, and FAR 52.228-5, Insurance—Work on a Government Installation.
R47Prior to commencement of work, the Contractor shall furnish a Certificate of Insurance demonstrating the required coverage and evidence of any required policy endorsements. The contractor shall maintain the required insurance throughout the contract performance period and comply with the applicable cancellation and material-change notification requirements of FAR 52.225-5. The contractor shall ensure that subcontractors performing the work on Government installation maintain insurance coverage as required by the contract.
R48The Contractor shall maintain, at a minimum, the following insurance coverage: Commercial General Liability: $1,000,000 per occurrence and $2,000,000 general aggregate; Automobile Liability: $1,000,000 combined single limit per occurrence for bodily injury and property damage, covering vehicles used in contract performance; Worker’s Compensation: Coverage in accordance with applicable Georgia workers’ compensation laws; Employer’s Liability: $500,000 minimum coverage
R49Title your submission “SEPA Parking Lot Repaving and Repairs”
R50Please include the solicitation number in the subject line: 89503511102026
R51Include offeror name, address, telephone number, and email address
R52“Remit to:” address, if different than mailing address
R53Project Schedule: A proposed schedule demonstrating the ability to complete the work within the required performance period.
R54Quality Control: Procedures for ensuring workmanship, material quality, required testing, and compliance with contract specifications.
R55GSA Contract Number (if applicable) and/or SAM UEI Number
R56When submitting the bid please include the offeror Unique Entity ID and your preferred NAICS Code.

Recent awards in NAICS 238990

The newest federal contract awards in the same industry code from Department of Energy, since 1 October 2024. Use them to see who wins this kind of work and at what value.

StartAwardee and buyerAward value
2026-08-25MAYOINTHEMIX LLCDepartment of Energy · RAPID CITY MAINTENANCE FACILITY SECURITY FENCE RESTORATION$30,655
2026-06-01FEDERAL BUILDERS LLCDepartment of Energy · BISMARCK DISTRICT OFFICE CRAWLSPACE REMEDIATION$34,475
2025-03-24BOWEN DOOR SERVICE LLCDepartment of Energy · ROTO-GATE DOOR REPLACEMENTS WITH STOREFRONT DOORS$27,016
2024-07-17MEADOWLARK ASPHALT MAINTENANCE LLCDepartment of Energy · ASPHALT CRACK SEALING AT BISMARCK O&M SERVICE CENTER$15,792
2024-06-27PANHANDLE CLEANING & RESTORATION, INCDepartment of Energy · NETL MORGANTOWN, WV BUILDING 3 EMERGENCY FLOODING REMEDIATION$67,878
2024-05-20TITAN CRANE & RIGGING INCDepartment of Energy · THIS IS A STANDALONE PURCHASE ORDER FOR BEALE CRANE RENTAL & OPERATOR SERVICE IAW WITH THE ATTACHED STATEMENT OF WORK.$0

Source: USAspending.gov, retrieved 2026-11-17. Award value is the obligated amount reported by the agency.

Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.

Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.

Bidding? Get a reminder 5 days before it is due

One email, with what to check before you submit. Nothing else.

Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.

Get new solicitations that match your business, free

Enter NAICS codes, keywords or both. No email when nothing matches. Unsubscribe in one click.