Commercial Low Earth Orbit (LEO) Destination Contract (CLDC) Request for Proposal: requirements and submission rules
16 requirements and 15 submission rules found in the solicitation documents for 80JSC027R0004. Use them as the start of your compliance matrix.
Submission rules that can disqualify a bid
- In the email subject line input: “80JSC027R0004 Pre-Proposal RSVP” no later than October 13, 2026 with the information requested in the SAM.gov RFP posting.
- To be considered by the Government, GTA forms must be submitted to the applicable Center Partnership Office Point of Contact no later than twenty-two (22) days after final solicitation release.
- Be advised, in accordance with provision L.17.1 offerors need to encourage their references to submit their Past Performance prior to proposal due date.
- 5 Proposals submitted in response to this solicitation are due no later than December 08, 2026.
- Submission Frequency: The Contractor shall submit an updated report via the SCV Reporting application every six (6) months after the due date of the initial report for the duration of the contract.
- Submission Frequency: If applicable – Annually, delivered No Later Than (NLT) December 1 of each year to the Johnson Space Center (JSC) Environmental Office Format: Contractor’s format is acceptable, unless information in the sections below outline a specific format, and shall be in accordance with Data Format section at the beginning of this attachment Interrelationship: 1.
- Example due dates for the monthly submission are as follows: August 21 for the month ending July 31 September 21 for the month ending August 31 October 10 for the month ending September 30 Format: Annual Property NF 1018 Reports shall be submitted using the NF 1018 Electronic Submission System (NESS) (https://ness.nasa.gov/) or another format supplied by NASA.
- DRD CLDC-210.2: Crew Mission Evaluation (Type 2) Initial Submission: No later than one (1) month prior to Operations Readiness Review (ORR) Submission Frequency: Final Submission delivered at ORR; Updated deliveries required for each mission Format: Contractor’s format is acceptable and shall be in accordance with the Data Format section at the beginning of this attachment.
- Type 2 has the same authority and control as listed for Type 1, however, the data shall be submitted to designated repository for review not less than 45 calendar days prior to its release for use or implementation.
- DRD CLDC-210.3: Signed Crew Code of Conduct and Informed Consent (Type 3) Initial Submission: No later than one (1) month prior to Operations Readiness Review (ORR).
- NASA will disposition all requests and notify Offerors within seven (7) days prior to proposal due date.
- Schedule Risk Assessment (SRA) Submission Frequency: The Integratedion Master Schedule (IMS) shall be delivered monthly and no later than the 5th Government working day of the month.
- When a contract ends or is terminated prior to the end of a fiscal year, the Contractor shall provide reports for the activities performed during the period of performance that the contract was in effect and the final reports shall be submitted no later than 30 daycalendar days of the contract end date.
- Contents: All Contractors shall submit their Fiscal Year spending plans for review and approval to the cognizant Center Chief Information Officer (CIO), or designee, prior to the beginning of the Fiscal Year (October).
- DRD CLDC-206.2: Cargo Transportation System (CaTS) Post Flight Report Initial Submission: The Contractor shall deliver a Baseline Post Flight Report (PFR) no later than (NLT) fourteen (14) daycalendar days after the Cargo Visiting Vehicle arrives at the Destination or no later than three (3) daycalendar days before undock for missions shorter than fourteen (14) daycalendar days.
Requirements
| ID | Requirement |
|---|---|
| R1 | The names provided are for informational purposes only and other than the Contracting Officer, Ashley Chaves, these individuals must not be contacted regarding this acquisition. |
| R2 | Offerors are required to have a Commercial and Government Entity (CAGE) code that matches the corporate address submitted with its proposal. |
| R3 | All offeror requests for indemnification must be submitted in accordance with FAR 50.104-3, Special procedures for unusually hazardous or nuclear risks and NFS 1850.104-3, Special procedures for unusually hazardous or nuclear risks. |
| R4 | While the RFP’s Price Volume exhibits are in PDF format, the Offeror’s Price Volume proposal must include completed Price Volume exhibits in Microsoft Office Excel format with working cell formulas. |
| R5 | Proposals for this solicitation are required to be submitted through NASA’s Enterprise File Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform. |
| R6 | All inquiries/communications pertaining to this acquisition must be directed only at the Contracting Officer listed below. |
| R7 | All questions regarding this RFP should be submitted in writing, electronically to Ashley Chaves, Contracting Officer, at jsc-cldc@mail.nasa.gov on or before October 21, 2026 at 1:00 pm Central. |
| R8 | The Draft IMS shall be due at proposal with the contents below: • Native Schedule File, referred to as Integrated Master Schedule (IMS) through the full period of performance • Native Schedule File Data Dictionary • Schedule Assumptions • Summary Master Schedule • Schedule Risk Assessment (SRA)Section J |
| R9 | Commercialization Plan Initial Submission: Baseline with Proposal (Section 1, 2d, 5, 6, 8-11). |
| R10 | Organizational Conflicts of Interest (OCI) Plan Initial Submission: Baseline Plan shall be submitted with the initial proposal. |
| R11 | Small Business Subcontracting Plan and Reports Initial Submission: Final Subcontracting Plan with Proposal |
| R12 | NASA Standards and Specifications Compliance and Tailoring Plan Initial Submission: Draft (Sections 1-5 only) at ProposalH.38 |
| R13 | Insight and Collaboration Implementation Plan Initial Submission: Baseline at Proposal. |
| R14 | Destination SMAP Initial Submission: Draft (Sections 1-4 only) at ProposalH.38 |
| R15 | Risk Management Plan Initial Submission: Draft at Proposal |
| R16 | Utilization Integration Plan (UIP) Initial Submission: Draft (Sections 1-3 and 6, DRM #1 and DRM #2 only) at Proposal |
Recent awards in NAICS 336414
The newest federal contract awards in the same industry code from National Aeronautics and Space Administration, since 1 October 2024. Use them to see who wins this kind of work and at what value.
| Start | Awardee and buyer | Award value |
|---|---|---|
| 2026-10-23 | AXIOM SPACE INCNational Aeronautics and Space Administration · EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICES (XEVAS) DELIVERY ORDER 5 PROVIDES FOR PRODUCTION, TESTING, CERTIFICATION, DELIVERY, SUSTAINMENT, REPAIR, REFURBISHMENT, AND ENHANCEMENT OF SORTIE SUIT HARD | $12.50 million |
| 2026-09-01 | BLUE ORIGIN, LLCNational Aeronautics and Space Administration · PROVIDE DESIGN, DEVELOPMENT, INTEGRATION, LAUNCH, AND ON ORBIT, CONTINUOUS COMMUNICATIONS IN SUPPORT OF A MARS SAMPLE RETURN (MSR) MISSION AND FUTURE MARS SURFACE, ORBITAL, AND HUMAN EXPLORATION MISSI | $660.00 million |
| 2026-08-18 | RELATIVITY SPACE, INC.National Aeronautics and Space Administration · NASA LAUNCH SERVICES II (NLS II)_ RELATIVITY SPACE, INC. | $1 |
| 2026-07-28 | AXIOM SPACE INCNational Aeronautics and Space Administration · EXPLORATION EXTRAVEHICULAR ACTIVITY SERVICES (XEVAS) | $8.70 million |
| 2026-06-12 | LANTERIS SPACE LLCNational Aeronautics and Space Administration · PPE - TO 024 | $1.48 million |
| 2026-06-09 | LANTERIS SPACE LLCNational Aeronautics and Space Administration · PPE - TTO 032 | $403,250 |
Source: USAspending.gov, retrieved 2026-11-10. Award value is the obligated amount reported by the agency.
Automated reading of the documents attached to the notice on SAM.gov when it was posted. Amendments may change them. The official notice always takes precedence.
Bidding on this? Before you submit, check that every claim in your draft is backed by your records and every requirement above is answered.
Amendment issued? Compare it with the original to see every changed requirement, date and limit, free.